Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.

Slides:



Advertisements
Similar presentations
Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
Advertisements

Status Update on Mechanical Prototype in Rome November 6,
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.
Construction material – All the material has been ordered with some spare (10%) Material Procurement Faraday cage – Final FEE board dimensions available.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
K.Hoepfner, RWTH Aachen IIIAQuality Control at Aachen Production site1 (Selected Items on) Quality Control at Aachen.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Status Report of activities in LNF Soldering procedure 1.Status of soldering machine 2.Measurement of wire position Chamber prototypes 1.Construction of.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Production Readiness Review Production steps and quality control 1.Panel production 2.HV bar gluing 3.Preparation of side material 4.Wiring and gluing.
T.Schneider/LHCb Muon EDR
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of MWPC production and quality control The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
15/6/2006Gaia Lanfranchi - LNF-INFN1 Why do we have to measure efficiencies in the Muon Detector? Muon Software Meeting, June 15th G. Lanfranchi LNF-INFN.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
Possible Improvement of MUID Performance Itaru Nakagawa, Seyoung Han (RIKEN, Ewha/RIKEN)
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Quality Control Chamber Production
Quality Control in Straw Production
Investigation on tray MID 063 Back
Results from a preliminary analysis of the MWPC test at the GIF
Status of MWPC production and quality control
LHCb Muon Detector MWPC & GEM
Pre-installation Tests of the LHCb Muon Chambers
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Engineering Design Review
Presentation transcript:

Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43

Chamber closing rate (averaged in groups of 3 chambers) Christmas In last 3 weeks, we closed one chamber every Monday-Wednesday-Friday

Switch to M1 and Christmas today Start M5R4 Summer Easter Summer Start M1R4 LNF production schedule (updated 8-Mar-05) 56 M3R3 + (52+5) M5R M5R M1R M1R4 = weeks (Christmas) + 1w Easter + 4w Summer Switch to M1 ~ 1 month End M5R3=begin-May-05 End M5R4=end-Nov-05 End ALL=mid-sep-06 Assuming a rate of 3 ch./week also for M5: expected end is ~ mid July 2006

LNF-M5R3 gain uniformity (updated 4-march) All 38 tested chambers are GOOD All 2.75 kV. No equalization is applied ±50 V±80 V

Table for the assembly of two M1 chambers simultaneously GEM group moved to a new clean room and left free space in our clean room. We have equipped this space with a new long table, which will allow to assemble two M1 chambers simultaneously.  we firmly believe that we can produce at least 4 M1 chambers per week.

Container for chamber storage and transportation Last Friday we switched on a group of 18 M3R3 chambers (one trolley) using a single HV channel. These chambers have been OFF and flushed with Argon for several months. ~10 days ago we began to flush them with gas mixture 40/40/20. We reached 2.75 kV (in 2 days) without any problem.

Ferrara production updated at March 4-th

Summary of chambers built in Ferrara Assembled: 49 Tested 46 Good (passed the gas leak + HV + source test): 36 Bad (unrecoverable): 6 (CH0,1,3,4,18,27) To be recovered: 4 (ch 39 for gas leak, ch 2,5,10 for HV) Chamber #46 has 3 panels recovered from bumps, it passed the HV test but still needs to be tested with source At present we have panels ready to assemble 4 more chambers We have to build 52 (48+spare) chambers The production status can be checked at the web address: we are trying to keep it updated on a weekly basis

Ferrara production rate We expect to finish the M2R3 production at the beginning of april

Chambers tests in Ferrara No big issues with HV training About 20% have to be recovered (it takes about half a day) for gas leak From our preliminary tests all chambers have a very uniform gain: 95% of each gap area is within 25% wrt the average 2.75kV Chamber #21 tested in Rome 2850V showed some problems, it will be tested again The Rome II source test table is now in Ferrara Several chambers have been tested in both Ferrara and Rome II to get normalization constants In the next weeks the source tests in Ferrara will be normalized to the standard one

Gas leak and HV test in Ferrara Dark current is measured about 2 hours after reaching 2.85 kV Gas leak is 5 mbar of overpressure Dark current Gas leak

Status of production at CERN The change from M3R2 to M2R2 has been carried out without any major problems. We are at nominal production speed of 2 chambers per week. Material supply for M2R1 is already well advanced. Concerning the panel equipment with electrical components and the HV-test of panels we are 1 week late. This is due to increased number of wires to be replacement (problems with tension). The bad winding at the wire spool end causes quite some problem to the wire tension  B. Schmidt got in contact with Luma

Chamber production CERN Pannelli M2R2 filati Camere M2R2 prodotte We are one week late in regard to our planning. The delay of the assembly can be recovered more easily. Strange behavior of leak test for first 2 chambers under investigation

Uniformity of CERN M3R2 chambers Erica has set up the hardware for the M3R2 uniformity tests. 8 chambers of this regions have been checked. We will continue with the tests of this region with the manpower available. New help from CBPF is foreseen before the next change to M2R1.

Trasparenze di riserva

Conclusioni di Ferrara Since beginnning of December we are keeping a constant production rate of 2 ch/week The problem of the bumps on the panels (which appeared in January) now seems to be solved (by drilling holes in the existing panels and improving the injection technique for the new ones) The material procurement is OK, apart from minor issues: – In the last batch, 5 panels have problems with the grove for the glue on HV bars – From time to time the wire seems to have some defects – Spool of guard wire twisted – Some difficulties in the HV cables procurement We still have some difficulties in recovering hospital panels/chambers (lack of manpower) We expect to finish the production of M2R3 in about 1 month, for the beginning of april we need panel of new type (M5R2) From the next chamber type (M5R2) we plan to implement some small changes in the tooling to further improve the production

Requirements on MWPC The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference chamber. Panel planarity  gas gap uniformity: 95% panel area in ± 90  m (5% in ± 180  m) PANELS REJECTED ~7% Wire pitch: 95% in 2 mm ± 50  m (5% in 2 mm ± 100  m) Wire tension: 50 ÷ 90 g WIRES CHANGED < 1‰ Gas tightness:  P < 2 5 mbar overpressure Gain uniformity: G 0 /1.7 < G < G 0 *1.7 (in 100% of each double-gap area) with respect to the average gain G 0. Distance wire plane - cathode plane: PANELS REJECTED: negligible 2.5 mm ± 100  m Small dark current (< kV Tests on assembled chambers (results shown later for each site) Partially-tested Fully-tested

Gas leakage test (I) In order to minimize the gas refill rate, the maximum leakage allowed for each chamber is 2 mbar/h. To verify the gas tightness of a chamber, we inflate it with nitrogen up to an overpressure P of 5 mbar. Then, we record P as a function of time, during about one hour. The measurement is sensitive to variations of the external temperature. In order to correct this effect, a second chamber is used as a reference. The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference chamber.

Gas leakage test (II) The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference chamber. If a chamber leaks, usually we can recover it by putting glue all around the chamber, between each pair of panels. For ex. In LNF, over 73 chambers produced, only one was not recovered.

Wire pitch measurement (I) The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference chamber. The wire position is precisely determined by the pitch of the wiring machine combs, however it is important to check that no wire is out of the acceptance. The WP measurement is performed with an automatic device, based on two cameras scanning the panel and a software for image acquisition and analysis. An accuracy of about 20 µm is obtained. The requirement on the wire pitch (WP) is: WP = 2 mm ± 50 µm (95% of pitches) ± 100 µm (5% of pitches) Sample image from scanning device

Wire pitch measurement (II) The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference chamber. The range 2 mm ± 50 µm corresponds to the red lines drawn at 211 ± 5 pixels. For example in LNF, over all chambers produced (~180,000 wires), we changed only few wires with wrong pitch. The fraction is somewhat higher at CERN, where the wires touch the HV bars, but this is not a cause of worry.

Laser Photodiode wire Mechanical excitation Panel This method has been developed together with Firenze and Roma II The signal is sent to a PC’s soundcard, a FFT is applied and the fundamental frequency is searched between 310 and 600 Hz (for M2R3 panels) Wire Tension Measurement in FE

Laser Mechanical Excitation Photodiode The measurement takes about 2 sec/wire (2 panels ~1200 wires in 40 min) Wire Tension Measurement in FE

X position in the gap (Wire-pad #) Measurement of the gain uniformity The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference chamber. Uniformity of the gap gain is measured with a radioactive source. The current drawn by each gap is monitored while the lead case containing the source is moved by means of a mechanical arm. These measurements allow to check the gain uniformity within each gap and to compare different chambers among them. Y position in the gap Current (nA) Example of a result of the scan of a gap with radioactive source The method used is similar in INFN and PNPI sites. At CERN, where chambers are smaller, a different method is used (see later).

Test of CERN chambers with radioactive source: method 241 Am source All anodes connected together  ADC  Amplitude spectrum Cathode connected to the delay line  TDC  Pad location ADC spectrum Delay line output Time (ns) Peak position of the signal induced by the gammas of the 241Am

Classification criteria on gain average and uniformity Chamber class: AA,AB,BA  GOOD BB  RESERVE BC,CB,CC  REJECTED The HV plateau width is determined by the minimum efficiency and by the maximum average number of pad-hit. From test-beams, these requirements define a ~170 V wide region   V = ±85 V Testbeam oct. ’03: 2-GAP For each double-gap, we provide the class: A = all currents measured with source are within a factor 1.4 from the average current of all 2-gaps (   V = ±50 V) B = … within a factor 1.7 (   V = ±80 V) C = not satisfying criteria A and B