PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Time - 02 April 2013.

Slides:



Advertisements
Similar presentations
1/8 AND, OR and NOT b How many boys? b How many girls? b How many blue? b How many red?
Advertisements

Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
© red ©
May 12-15, 2011 (red) May 6-11, 2011 (light red) Permanent Water (blue)
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Mrs. Smith’s 7th Grade Reading Blue Class Mrs. Smith’s 7th Grade Reading Blue Class Mrs. Smith’s 7th Grade Reading Blue Class.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Summer Summit June 18 th, Fall 2013NAverage ACTmathAverage PT1Average PT2 Math 107 GREEN at Week Math 108 RED at Week
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
LHCf Run status at 7TeV collisions Takashi Sako (Plots: K.Taki, H.Menjo) LPC meeting 12-Apr-2010.
Fractions/Decimals/Percents By Me Date:. Look at this car.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13.
PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
WEEK 1 You have 10 seconds to name…
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
SunSatFriThursWedTuesMon January
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
= 5 = 2 = 4 = 3 How could I make 13 from these shapes? How could I make 19 from these shapes? STARTER.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
1 PHENIX Status Ed O’Brien for John Haggerty Brookhaven National Laboratory June 23, 2009.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN 30 June1 July2345/65/ / / / August2/32/3.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Catch the Wave Wave Rate D = measured distance between sensors.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
5-4 Your brother gave you two bags of pens. One bag contained 3 blue pens and 9 red pens. The other bag contained 6 red pens and 4 green pens. Which bag.
Types of angles.
GIANT TWISTER!.
Visible Light.
Completing the Step IV Programme
HIV Cross Part Care Continuum Collaborative
Probability.
Run16 Y. Akiba.
Election #1 Popular Vote Electoral Vote State Red Yellow
Can I color yellow?. Can I color yellow?
مديريت موثر جلسات Running a Meeting that Works
Types of Angles An acute angle measures less than 90°
What Color is it?.
Answer Grid – 3 & 4 Step Equations
Visual English You understand English can eyes ! your with.
Word Work List ____________ Name____________
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Thing / Person:____________________ Dates:_________________
Presentation transcript:

PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Time - 02 April 2013

Phenix efficiencies Time - 02 April 2013 Blue: beam on Green: physics on, Phenix taking data Red: physics on, Phenix data taking off

Luminosity to date Time - 02 April 2013

Projection with current conditions Time - 02 April 2013 Come close to the target by the end of June

Projection, Run-12 conditions Time - 02 April 2013 If 5 days are lost to switchover, break-even occurs in ~3 weeks Blue: current pol Red: run-12 pol

- Time - 02 April 2013