GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

PPAP Requirements Training
First Article Inspection Report
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
Quality Management System
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
October 15, 2004GLAST Project Results of 1 st Run P.A. Test Fixture LATLAT 1 RESULTS OF 1 st RUN PITCH ADAPTER TEST FIXTURE Peter Amnuaypayoat
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
Colorado Space Grant Consortium Timing Circuit HW #4 Class #07 Timing Circuit HW #4 Class #07.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
First Article Inspection
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
LSU 09/12/2013Electronics - SkeeterSat1 Building SkeeterSat Inventory Components  Identify components Use the parts list and assembly manual  Tape to.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
Chapter 7 Safety. Introduction This chapter covers the following topics: Dangers of electricity Preventive measures Electrostatic discharge Safety practices.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
INSPECTION AND ACCEPTANCE CRITERIA. PRODUCT CONFORMANCE Dimensional conformance - within tolerances as defined on product drawing Dimensional conformance.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
Conformal Coat Quality issues Update of November 3, 2004.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
Procedure for MCM rework on tray MID 070
EFW DFB Systems Assurance
EFW DFB Systems Assurance
ACCEPTANCE PROCEDURE FOR ALL SHIPMENTS
GLAST Large Area Telescope:
THEMIS Mission Assurance
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
Controller Rework.
Preproduction Status & Results
First Article Inspection
GLAST Large Area Telescope:
GLAST Large Area Telescope:
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple) to perform in-process Mandatory Inspection Points (MIPs), Source Inspection and process oversight. Training for Donald Knaepple has started. He will receive additional training in conjunction with last ten (10) preproduction units (LAT-DS-00899). TMCM MANDATORY INSPECTION POINTS –Four (4) MIPS are required and are documented in LAT-PS-01971, section 9. –The four MIPs will be also be called out in Teledyne’s Process Instructions once the PO is finalized. 9.1 MIP 1: PITCH-ADAPTER ATTACHMENT VISUAL INSPECTION –The Teledyne inspection of the attachment of the pitch-adapter flex-circuit to the PWB is repeated, following the instructions in Teledyne Drawing # On-Site LAT QA & MIPS

GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review MIP 2: PRE-ENCAPSULATE ELECTRICAL TEST AND 100% VISUAL INSPECTION The operator visually inspects the MCM to verify: –that the wire bonds are protected by a properly installed wire-bond protection cover. –that the MCM is installed correctly on the backing plate with screws, including a single grounding screw. –that all tantalum capacitors are installed with the correct polarity. –that the connectors and connector savers are properly installed, and that the MCM is not visibly damaged. –The wire bonds are inspected, with special attention paid to those connecting the chips and board to the pitch-adapter flex circuit (since these cannot be verified by the electrical test). –The operator checks that each bias wire bond is doubled. If bad wire bonds were found, or another defect was found that could be corrected by If bad wire bonds were found, or another defect was found that could be corrected by standard rework, then the operator fills in the DRH (Discrepancy Rework History) on the back of the Teledyne traveler. If the inspection or debugging indicates a problem that cannot be isolated or cannot be corrected by standard rework, then an NCR is completed and submitted. On-Site LAT QA & MIPS

GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review MIP 3: POST-CONFORMAL-COAT ELECTRICAL TEST AND VISUAL INSPECTION For an MCM to be tested post-encapsulation, the operator removes the test article from its ESD storage bag and places the black plastic storage box flat on a clear work surface. The lid is carefully removed, and the operator performs a visual inspection to verify that: –the MCM has two connector savers properly attached. –the encapsulation properly covers the chips and wire bonds and does not spill over into areas where it can cause problems. –the conformal coat covers the circuit and is not peeling off, and that there is no apparent damage to the MCM. –The 10x microscope may be used in this inspection if needed. –If a defect was found during inspection that could be corrected by standard rework (such as reworking the conformal coat), then the operator fills in the DRH form on the back of the Teledyne traveler. –If a defect is found during inspection that cannot be corrected by standard rework, or if the MCM fails the final electrical test, then an NCR is completed and submitted documenting the failure. On-Site LAT QA & MIPS

GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review MIP 4: END-ITEM DATA PACKAGE REVIEW AND APPROVAL This is the source inspection of the MCMs and their EIDP by SLAC prior to taking ownership of them and shipping them to SLAC. The inspector shall check the following items: –1. Each MCM shall be vacuum packed in an ESD protective bag. The serial number shall be clearly marked and visible. –2. The Teledyne shipper shall correctly identify the serial numbers of the MCMs. –3. The shipper shall also specify the revision levels of the assembly drawing, LATDS or LAT-DS-00899, and of the process specification, , to which the MCM was built. –4. There shall be a Teledyne Certificate of Compliance applicable to each MCM. –5. Each MCM shall have a complete copy of the Teledyne shop traveler, including the electrical test report summaries. –6. Together with the traveler shall be a copy of each NCR, if any, applicable to the MCM. Any such NCR shall clearly state the disposition by the MRB. –7. The inspector shall complete and attach the SLAC traveler for the MIPs. On-Site LAT QA & MIPS