Brainstorm Sessions from 9/17/03 (PM) 1 Comments on LRM Process Document List of references missing More info (or examples) on SPC (e.g., preform gap)

Slides:



Advertisements
Similar presentations
1 FAA/NASA/Industry Review of Key Characteristics for Composite Material Control Mark Chris, Principal Engineer Bell Helicopter Textron Composite M&P /
Advertisements

Intracompany Stock Transfer Scenario Overview
Safety-net Enhancement InitiativeOctober 27, 2009 SNE I Tuesday 10/27/09, 3pm EDT P-r??? Information Session Safety-net Enhancement Initiative.
How to Document A Business Management System
Jurisdictional Decision Support Tool Mark Hamblin Carnegie Mellon University.
Getting Certified In Consultant Selection Steps and Processes Diana Foster.
Guidelines for the Development of Process Specifications, Instructions, and Controls for the Fabrication of Fiber-Reinforced Polymer Composites by Liquid.
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
FAA/NASA Workshop on Key Characteristics for Composite Material Control - Chicago, IL M17 M&P NWG DRR August 6 - 8, 20021/12 Carbon Tape Material Specification.
8/6/ Material and Process Spec Review Cindy Cole Certification and Materials Engineer The Lancair Company.
Review of FAA Guidelines for Fabric Prepreg Material Specification
0 FAA Workshop on Key Characteristics for Composite Material Control September 16 th – 18 th, 2003 Alan J. Norwid Principal Engineer M&P Ext.
9/17/2003 1LRM Spec Review LRM Material and Process Spec Review Cindy Cole Certification Manager The Lancair Company.
Mary PacherFAA Workshop – Chicago September 16-18, 2003 Comments: Liquid Resin Molding Specifications Guidelines clearly indicate the critical importance.
FAA Workshop on Key Characteristics for Composite Material Control
FAA Regulatory Policy for Composite Material Control Presented at 8/8/02 FAA/NASA Workshop (Chicago, IL) Introduction – Importance of stabilizing composite.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
FAA/NASA Workshop on Key Characteristic's for Composite Material Control Chicago, IL Cytec Engineered Materials August 6th 2002.
Review of Liquid Resin Molding Specifications FAA Workshop September 2003 Scott Reeve National Composite Center.
FAA/NASA Meeting on Industry Composite Specifications August 2002 FAA Report on Proposed Industry Prepreg Specifications Ric Abbott Abbott Aerospace Composites.
10 Stages Of the Engineering Design Process
Lynda Paleshnuik | January |1 | Assessment Workshop Copenhagen – January 2011 QIS/QOS: The new PQP quality templates.
1 GMP issues in Q assessment Wondiyfraw Worku Assessor 6 th CPH assessment training workshop, May 2014.
Overview of DMAIC A Systematic Framework for Problem Solving
Welcome ISO9001:2000 Foundation Workshop.
ISA–The Instrumentation, Systems, and Automation Society SP99 Work Group 2 TR#2 “Second Edition” Long Beach Meeting April 28, 2004.
Guidelines for Carbon Fiber Tape Prepreg Specifictions W.T.McCarvill S.Ward August 6, 2002.
1 European Conference on Training Strategies Kieran Cox -NSAI Education & Promotion-
Client Logo LEAN ENTERPRISE Implementation Workshop.
ISA–The Instrumentation, Systems, and Automation Society SP99 Work Group 2 Planning for TR#2 Second Edition Long Beach Meeting April 28, 2004.
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Project Management Requirements
Final Idea: Working Drawing
DOT/FAA/AR- 02/109 Guidelines and Recommended Criteria for the Development of a Material Specification For Carbon Fiber/Epoxy Unidirectional Prepregs Overview.
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Slide 1 An Alfred McAlpine plc company. Thursday, 04 October 2007 Land Management Guidance (v2) Philippa Towler.
BNF for children and formulations Ian Costello British National Formulary.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
11/24/20151 Guidelines for NECA CMP Representatives National Electrical Contractors Association.
Hints and Tips on using the Scottish Household Survey data Steven Hope, Ipsos MORI Mairi MacAskill, SHS Project Manager.
Query Health Distributed Population Queries Implementation Group Meeting October 11, 2011.
ACCESSING INFORMATION AND ANALYZING INFLUENCES Opening Work: How can these two skills be used to encourage healthy behavior HOW DO YOU THINK A PERSON CAN.
1 Criteria for a Successful FMEA Design & Process.
Final Rule for Preventive Controls for Animal Food 1 THE FUTURE IS NOW.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Comments on Fabric Material Procurement Document (9/17/2003): statement of purpose - guidelines not requirements … see J. Tomblin notes what type of parts.
2 nd FAA Meeting on Composite Material Control Sept 2003 Proposed Material Specifications for LRM Ric Abbott Abbott Aerospace Composites Wichita, Kansas.
Cumulative Hydrologic Impact Assessment. Quality Assurance \ Quality Control Panel.
CIA Annual Meeting LOOKING BACK…focused on the future.
Strategic Financial Task Force Info 1 Work in support of existing programs and services Work specific to the Strategic Plan Work that would support emerging.
ISO Session 3 Environmental Management and Ethics in Management.
Particulates: Where is the current policy emphasis in the EU CAFE Programme? A contribution to the panel discussion “Nanoparticles from road vehicle exhaust:
Student Engagement Monitoring Project
Writing for Publication
AND AFTER INSTALLATION Technical Director, NASSCO
The Risk Assessment in the Food Industry
How to Implement an IG Manufacturing Quality Procedure System
Intracompany Stock Transfer Scenario Overview
Food Production Systems
Intracompany Stock Transfer Scenario Overview
Outcome TFCS-11// February Washington DC
Engineering Design Process
10 Stages Of the Engineering Design Process
What is a Material Safety Data Sheet (MSDS)?
10 Stages Of the Engineering Design Process
10 Stages Of the Engineering Design Process
Intracompany Stock Transfer Scenario Overview
Failure Mode and Effect Analysis
GL 51 – Statistical evaluation of stability data
Presentation transcript:

Brainstorm Sessions from 9/17/03 (PM) 1 Comments on LRM Process Document List of references missing More info (or examples) on SPC (e.g., preform gap) Classification of structures (good or bad?) –Primary –Fracture critical –Secondary Where is the material used? - scope Combine material procurement in process spec??? Process vs. materials (is what we have a process spec) Assumption that reader is familiar with building block approach Does the building block approach work for LRM ? Option of not testing for incoming materials

Brainstorm Sessions from 9/17/03 (PM) 2 Comments on LRM Process Document Scope of the document –written assuming flat panel, but there are parts of the document useful to parts Recommend limited focus of the document to flat panel –Manageable – can address important details –Material control* –Material processing* –Scale-up* * Casting mentality Are industry standards (like prepreg) possible/practical? Is there merit to LRM processing industry standards? –Do designers use flat panel data/material prop. to certify parts? What would be likelihood of material suppliers vs. part manufacturers investing in a combined material spec?

Brainstorm Sessions from 9/17/03 (PM) 3 Comments on LRM Process Document Contamination –Hand touch on fabrics/preforms? –Do we need to consider this issue in the same way as the past? –Clean room proof? How do we check that all process variables covered? Process Map –What variations show up where? –Batch to batch variation occurs where? Preform quality control –Preform teardown required? –When does it get to its final form? –Is teardown required at this point? –How do we verify preform position/placement

Brainstorm Sessions from 9/17/03 (PM) 4 Comments on LRM Process Document Safety (of process) one-liner only Recognize on site formulation issues (&Vinyl Ester) Sizing on fiber is reactive. Burping? (resin bleed/resin pulsing etc,) Developmental phase? (…document assumes not) Emphasize document is guidelines/recommendations not requirements Some comments too specific Record retention

Brainstorm Sessions from 9/17/03 (PM) 5 Proposed Revisions LRM Process Guidelines. Review Guidelines vs Examples –Aim to keep specific requirements as examples of how to control area of concern. Review scope of document –Crossover between flat panel and full scale part Add notes on preform controls Add example for SPC Add comment on operator health and safety –(n.b. out of scope for this document.