High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.

Slides:



Advertisements
Similar presentations
ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
Advertisements

CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
ECAL FB Meeting, D Cockerill (RAL)1 Large EE Mechanics update.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
G.Barber Mice Tracker Integration Jun Tracker integration.
CM30 University of Oxford Engineering session Peter Ford Tim Hayler Eddie Holtom Roy Preece Jason Tarrant Steve Virostek.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
HCAL RBX for HB, HE, and HO Status and Planning R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN USA.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Peter Sharp CERN CMS Electronics CMS LV Power System Peter Sharp 7 April 2003.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
ECAL planning, 10 Jul 2003 AB CMS schedule draft v33.1:surface.
XML Description of ECAL Geometry  For XML description of ECAL Geometry were used: Det/XmlDDDB/v5, Det/XmlEditor/v4, Det/DetDesk/v6, Vis/GaudiLab/v1r4.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Installation and Testing of Optical Harnesses John Matheson Rutherford Appleton Laboratory Schedule for test and assembly Outline of required tests Acceptance.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
1 Lower Brg Detail Inner cap Bearing Lock Washer 8 = Insulating Tube/ sleeve (slide 6_ * Outer Cap Steel Spacer (slide 4,5) Insulating Spacer (Slide 4,5)
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
ECAL End Cap Dee Assembly, Transport, InstallationCERN January 2006AR / RJSG – 1 Alexandre Riabov (IHEP, Protvino) Justin Greenhalgh (RAL) Finite Element.
For Official Use Only; Information herein NOT Approved for Export; Contains Proprietary Protected Information; NOT for Public Release 1 WIPER PDR Stanford,
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
M. Sannino for S. Cuneo - I.N.F.N. Genova1 Rich2 MAPMT Housing & Cooling Outdated designs and what is needed to get a final executive design Imperial College.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
Chiho Wang ATLAS TRT Duke University Dubna, May Barrel integration status May 24, 2005.
EC: 7 DISK concept Preliminary considerations
ATLAS Internal ID Service Integration
DT-LHCb coordination meeting 18 April 2016
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Progress with System Integration of the CBM Silicon Tracking Detector
"Drawer Mechanics - MiniDrawer"
End-cap Mechanics FDR Overview of the Project
Mini-drawers, FE-ASIC , Integrator
Services Layout – Update
Chamber Design and Integration RE3/1 and RE4/1
Design of the He and HB ODU
Integration and IR Hall
UK CMS Oversight Committee Mtg
RPC SYSTEM LAYOUT and DIMENSIONS
SuperB Integration Summary of previous integration sessions.
HL-LHC Engineering Change Request # REDUCTION OF Q1 BEAM SCREEN COOLING TUBE DIAMETER FROM Ø16 MM TO Ø10 MM N. Kos TE-VSC TCC #77,
Presentation transcript:

High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering John Hill

J A Hill - Rutherford Appleton Lab ECAL End Cap 2 Timescales Driven by –Installation in late 06/early 07 –Long lead time for large mechanical items Parallel critical/near critical paths: –Large mechanical items –Backplate/Positional Spacers –Support Ring –Environmental Shield Assembly

J A Hill - Rutherford Appleton Lab ECAL End Cap 3 EE End Cap Layout

J A Hill - Rutherford Appleton Lab ECAL End Cap 4 EE End Cap Engineering ECAL End Cap Engineering Design Update General Assembly of End Cap (using 50 channel readout box units) 90% complete. Super Crystal positions fixed, positional spacers (super crystal seating elements) fixture to backplate now specified. Backplate with cooling circuit designed to 50 channel scheme, inclusion of EE assembly and installation fixtures. Support Ring designed within parameters of EDR specification, accommodation for End Cap electrical/cooling patch panels, interface to HE as requested Environmental Shield Assembly currently being detailed with IHEP Protvino

J A Hill - Rutherford Appleton Lab ECAL End Cap 5 EE Backplate EE Backplate (known details) - Major dimensions (radii, thickness). - Material (Al/Alloy) - Location and fixture of positional spacers (Super Crystals). - Assembly/Installation brackets fixing points. - Environmental Shield fixing points. EE Backplate (unknown details) - Super Crystals Slot positions (opening for SC electronics cable/connector and fibre optic monitoring. - Support system for Electronics and services - Backplate Cooling circuit (details of arrangement)

J A Hill - Rutherford Appleton Lab ECAL End Cap 6 EE Support Ring EE/HE Interface Support Ring (current) - Detailed to 50-channel layout - Detailed with support fixtures to EE Backplate (with provision for insulation). - Provision for EE Services Patch Panel. - HE Integration fixtures as proposed layout (including shim). EE/HE Interface Support Ring (future) - Agreement on EE/HE Fixture - Design and arrangement (in particular depth) may change due to new design of electronics (effect on HE?). - Template requirement for fixture holes between EE-HE.

J A Hill - Rutherford Appleton Lab ECAL End Cap 7 EE Environmental Shield Assembly EE Environmental Shield (current) - Layout/scheme of outer, inner, front shield produced by RAL, to within CMS/EE parameters, clearance to Super Crystals (outer, inner and front). - Detailed engineering and thermal analysis in progress by IHEP Protvino.