LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.

Slides:



Advertisements
Similar presentations
Obtain 24/7 Powerful Asset and Connectivity Management Software for Enterprise Data Centers.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
EQUIPMENT VALIDATION.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
IBL CO 2 cooling control system development status Lukasz Zwalinski – PH/DT/DI Maciej Ostrega – PH/DT/DI Florian Corbaz – EN/CV/DC.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Field investigation Installation site confirmation Roof-mounted.
Electrical Safety.
Safety First!. 1.Wear Goggles 2.Know your tools 3.Make sure all your wires are waterproofed 4.Document all circuits as you wire the control box 5.Prepare.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
FIRST Electrical Design FIRST Robotics Championship Conference Steven Shade Team 1111 April 16, 2003.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
1 1. Some recent views ( ) 2 Linac tunnel
LINAC4 COMMISSIONING A.Lombardi BCC 8-19 Nov 09 Linac4 BCC Nov 2009Alessandra Lombardi.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
ADT490 TroubleShooting Grounds. 2 Prior to Troubleshooting ‣ Before starting to work on the FACP, what do you do? 2.
Chiller control system Lukasz Zwalinski – PH/DT.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
A Few Pointers from the Linac4 Beam Commissioning of Warm Linac Yngve Levinsen Beam Physics Section 05/02/16.
Commissioning Forms & Procedures ESCONDIDA CONSTRUCTION COMPLETION PHASE CIVIL PROCEDURES INSTRUMENTACION PROCEDURES Testing Test of Density In Field Z01.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
Ruben Carcagno, Sandor Feher, George Velev (team leader) MQXFS1 status meeting Summary of the MQXFS1 Investigation.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Fieldbus Foundation General Assembly 2008 Project Planning and Execution Mike Downey Jacobs Engineering.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
Internship final report Joanna Staniszewska Cracow University of Technology –
ESS licensing process and Readiness Reviews
5708 startup and commissioning
LCLS-II CRYOPLANT CONTROLS HARDWARE FINAL DESIGN REVIEW
TE-MSC-SCD EYETS th September, 2017.
Gas System Commissioning
LINAC4 Vacuum Control System Review
How SCADA Systems Work?.
XFEL Vacuum System Commissioning
Linac4 RF System Operation for the Reliability Run in 2017
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Personal Protective Equipment
Electrical Safety.
Andreas Jansson, Lali Tchelidze
ESHAC meeting October 1-2, 2018
Documentation Chris Scanlon and Ritendra Bhattacharya
Operator Training Requirements
Testing Plan and Status
Testing Coordination at ESS
PSS verification and validation
MPS commissioning at ESS
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
(Beam) Commissioning Plan
Electrical components and systems
Machine Protection PLC Based System Verification and Validation Plan
Lessons Learned - SNS Linac PPS Phased Upgrade to Safety PLC
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016

2 OUTLINE What was the status of commissioning activities when I joined Lessons learnt Rack pre-commissioning checks Cable pre-commissioning checks LINAC IV COMMISSIONING EXPERIENCE

COMMISSIONING PHASES 3 Linac4 is a 160 MeV H- ions accelerator, which will replace the 50 MeV proton Linac2 as injector for the CERN complex from Linac4 is about 100 m long, normal- conducting, and housed in a tunnel, 12 m below ground, on the CERN Meyrin site. Linac4 is commissioned in several stages, starting from the low energy end (3 MeV test stand) and after alternating phases of commissioning at intermediate energies (12, 50, 100,160 MeV). The different stages are detailed below (taken from: LINAC4 COMMISSIONING STRATEGY J.B. Lallement, G. Bellodi, M. Eshraqi, M. Garcia Tudela, A.M. Lombardi, P. A. Posocco, E. Sargsyan, J. Stovall, CERN, Geneva, Switzerland) :

4 Stage 1: with the use of the 3 MeV test stand, commissioning of the Source, LEBT, RFQ and Chopper line Stage 2: The LEBT, RFQ and chopper line will be re-commissioned in the tunnel Stage 3: The DTL tank1 (12 MeV) will be installed and commissioned Stage 4: DTL tanks 2&3 are installed and commissioned Stage 5: CCDTL is installed and commissioned Stage 6: PIMS is installed and commissioned. stage witnessed, November COMMISSIONING PHASES

LESSONS LEARNT 5 But…. Beam commissioning is a process full of unexpected events: Of the 2,5 days I have spent there, we had beam only half a day…. And also life is full of surprises: When I got to CERN my access card was not prepared, so another half a day was wasted on this… LESSON LEARNT 1: Make sure that the administrative/ paper work is done before you get there LESSON LEARNT 1I: Try to arrange back-up meetings with CERN colleagues (in case there is a pause/problem at the commissioning activities) LESSON LEARNT 1II: Try to attend for at least one week to fully comprehend the flow of the activities and familiarise with the GUI

THE END 6 THANKS FOR YOUR ATTENTION!!

PRE-COMMISSIONING CHECKS 7 Common tests on racks and cabling during installation and pre commissioning phase (main focus on hardware checks, signal testing mostly performed by controls) The list of checks is indicative and non-exhaustive

PRE-COMMISSIONING CHECKS ON RACK CABINETS 8 A check list should be prepared, for each rack, including as minimum the following: 1. Visual Inspection (correct mounting, tagging, grounding connection, no physical damages, mechanical components operational, internal lighting, etc.) 2. Cooling properly installed and working 3. Mains connection, cross check with drawings and diagrams, megger test of circuit breakers, check UPS connection 4. Crate installation (label,power connection, wiring according to drawings, appropriate fixing, cables properly terminated, grounding connection in place) 5. Inner rack cabling laid checked 6. Basic functionality checks (e.g. verification of drivers) 7. SCADA or other Control Systems connection in place and working (Control interface operational, patch panels, PLC operational, server responsive) 8. Check if all quality forms and documentation is available and approved, devices registered in CCDB

PRE-COMMISSIONING CHECKS ON CABLING-1 9 Another check list should be prepared for each cable. Minimum cable checks: 1. Visual inspection, best practices kept during pulling, adequate mechanical support and correct fastening, segregation of cables of different ratings 2. Continuity test. Verify that each cable is at its proper position, correctly tagged (and same label at both ends!!) 3. Insulation Resistance testing (Megger test). Check cable integrity conductor-to-conductor, conductor-to- shielding, shielding-to-earth. 4. Connector connection check (appropriate lugs/connectors are used according to cable type, correct crimping, use of heat shrinking sheath were needed) 5. For power and grounding conductors, special attention shall be given to the sequence and correct installation of accessories picture from CERN IT-3818/EN

PRE-COMMISSIONING CHECKS ON CABLING-1I Similar checks for signal and control cabling: wiring and terminations according to drawings, grounding connection where needed, core marking. Make sure that proper tools have been used. 7.Connectivity: Perform I/O test with control interface: Check that Software objects are connected to the correct Hardware objects 8. For instrumentation cabling: loop checks (continuity of the signal between instrument-junction box- DCS that is from field to control room) 9.Fill test protocol before continuing on commissioning

BEFORE BEAM COMMISSIONING 11 All the checks are a prerequisite but not sufficient to ensure that we are in a position to start the machine. All the interlocks, alarms, safety procedures (Lock-in-Tag-out for example) should also be checked.

12 NOW IS THE ACTUAL END QUESTIONS??