1 www.xodusgroup.com 1 Xcelerate Presenter / date if required.

Slides:



Advertisements
Similar presentations
Unlocking Value Through New Relationships Malcolm Brinded Shell UK Country Chairman Co-Chair of ILT Member of OGITF/PILOT since December 1998.
Advertisements

Christine Pasquire, Nick Blismas, Alistair Gibb
Henkel’s Stage-Gate Process (Portugal Division)
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
1 Open PepsiCo 2009 Ian Noble R&D Director Foods Innovation.
Commercial in confidence Regional Collaboration – Fleet Management Project Progress Summary Duncan Kinnaird Project Lead.
Karen Hercus OneSource Finance Project Director. OneSource Finance Project Project Scope: Fully integrated Finance and Procurement System.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
A Winning Approach to Government Sales Federal Marketing Partnership Josh Ladick, President // (866) //
Economic and sustainable implications of standardised components and modular assembly.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
RadComms 2014: Innovations in Spectrum Management Lynne Fancy Senior Director Spectrum Development and Operations Industry Canada September 2014.
Low Oil Price – No Time to be Smart? Pieter Kapteijn, Dir. Technology and Innovation Maersk Oil, Copenhagen IO Conference Trondheim Norway 29 September.
Service Provisioning Service Provider Consulting Microsoft Consulting Services harvests the knowledge, experience, and tools established by designing and.
IT Infrastructure Outsourcing for Government Sector in Latvia Aivis Rozenfelds MicroLink Latvia Systems Maintenance and Management department director.
IT ASSET MANAGEMENT (From Booz-Allen & Hamilton).
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
The Integration Story: Rational Quality Manager / Team Foundation Server / Quality Center Introductions This presentation will provide an introduction.
NGPC N G P NGP CAPITAL RESOURCES COMPANY IPAA OGIS Private Capital Conference April 18, 2005 C.
Margin Management Tool (MMT) Recommended Approach 23-January-2014
Copyright © 2010 Accenture All Rights Reserved. 1 Copyright © 2010 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are.
Teezle TMatics M2M Platform & Solutions Overview January 28 th, 2014.
Contact Profile
By: Rakesh Verma CTO and Vice President Samsung Heavy Industries India Pvt. Ltd. 23 rd May 2013 India Drilling & Exploration Conference (IDEC) 2013 Does.
How to make EA-work impact everyday-work – the Statistics NZ story? Workshop on the Modernisation of Statistical Production April 2015.
Engineering Petroleum Services Efficiency – Professionalism – Success.
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 10 Risk Management Proactively managing the positive.
A centre of expertise in digital information management UKOLN is supported by: University of Bath Roadmap for EPSRC Catherine Pink Institutional.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Hydro Oil & Energy TEMADAG NSP 18 FEBRUAR Fleksibilitet i prosjektgjennomføring.
Business Development ……Where To From Here? FPL Group Bank Meeting September 21, 2004.
RBC Supply Chain Solutions. Who we are ? RBC Sourcing provides e-procurement solutions through a unique blend of proven on-demand technologies, affordable.
1 Excellence in Product Development. 10 th July BIFM Application.
Getting Everyone "On Board" for a Major IT Project Presentation to CUMREC MAY 16, 2002 Warren Mills, CEO Copyright Advantiv, Inc This work is the.
OBA to date: Lessons, Challenges and Mainstreaming Yogita Mumssen Infrastructure Economist Global Partnership on Output-Based Aid (GPOBA) Finance, Economics.
February 2008 Gemini Incident Overview. Agenda Focus this part of the presentation is on the system elements of last year’s Gemini incident :-  Briefly.
Mercury Program Margin Management Tool (MMT) 10-January-2014.
Independent, integrated thinking.
1 1 Presenter / date if required Independent, integrated thinking.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Case Study: EMPOWERING BUSINESS DECISIONS WITH FME WORKBENCH Eric Klein Senior GIS Consultant, Critigen Bill Bodinson Senior GIS Analyst, Critigen.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Prosjektbeslutninger i Statoil Oslo, 3. mai 2005.
Lecture Notes - Richard Ssembatya1 Information System Project Management Lecture Five By Richard Ssembatya MSc. Cs, BSc CS, CCNA, IT Essentials, ICDL Institute.
Continual Service Improvement Methods & Techniques.
Systems Development Life Cycle
MAASP Analysis with SEPAL - Well Surveillance Solution.
Trigo White Ltd Practical project risk assessment VIII Conferencia Internacional Hotel Tivoli Oriente, Lisbon 28 th November 2014 Simon White Consultant,
Selecting the Right CRM System at AVEBE Refik Kocak CRM Partners (on behalf of AVEBE) CUSTOMER.
An Approach To Developing a PMO A Case Study
Introducing pdri for mega projects As a Planning quality Control tool
NSF INTERNATIONAL OUR SERVICES.
Making Difficult Decisions in a Transparent Way –
PPT for the Missed call solution
What is a Learning Collaborative?
Project Roles and Responsibilities
Dynamics 365 for Wholesale Ditribution Readiness Assessment
New Approach Held Directors’ Forum on 28th September
Enabling step change in your PPM Maturity
New Approach Held Directors’ Forum on 28th September
Overview of Business Area Strategy and Products and Services
Data Governance & Management Skills and Experience
Overview Headlines RSP – Progress Overview General progress report
Growth and innovation Project support overview.
Introduction to Project Management
The Creative Process CREATIVE PROCESS
Value Proposition Celemi Sales Endeavour™ enables sales professionals, and their organizations, to learn and apply a repeatable process for developing.
Energy Catalyst Round 7 Iain Wheeler Bid Manager 24th July 2019
Stage Gate Process Template
NACE International Update
Presentation transcript:

1 1 Xcelerate Presenter / date if required

2 Your Developments Xcelerate Xcelerate can help meet these business challenges through: >A structured work process >Focused effort of an experienced team >Use of project analogues / benchmarks >Suite of cost / economic, risk and decision tools >Collaboration Undeveloped value need to realise faster? Multiple opportunities which to prioritise? Limited access to experienced resources but can a third party deliver? Internal gate system how to satisfy?

3 Conventional Development Process Xcelerate Frame SOW / bid Study Economics / decision analysis Decision gate Prelim/Concept Total Pre-project SelectDefineExecuteOperate Xodus Appraise 6 months 6-9 months18+ months Basic EngineeringDetailed EngineeringField Operations >Process oriented? >Linear schedule? >Collaborative? >Applied uniformly – regardless of size, location, opportunity? >Word heavy? Upstream oil and gas industry project development stages:

4 Development Process Xcelerate 1.Simple SOW – with time this becomes standardised 2.Pre-frame planning – get the right people involved for the type of opportunity 3.Framing workshop – many conventional elements >Base line >Business objectives >Decision criteria >Identify – brainstorm >Coarse screen – dump the trash on technical / commercial / risk 4.Post workshop screening / documentation >Screen – technical / risk / costs >Report – summary report Day 1 Day 2 2 Weeks

5 Xcelerate Conventional Development Process Prelim/Concept Total Xodus Upstream oil and gas industry project development stages: Appraise 6 months 6-9 months18+ months Prelim/Concept Appraise 3 months6 months6-9 months18+ months SelectDefineExecuteOperate Pre-projectBasic EngineeringDetailed EngineeringField Operations Xodus Development Process 3 months acceleration >Integrated approach >Industry expertise >~3 month schedule acceleration >Word light >Cheaper SOW Frame Quantify / qualify Challenge Economics / decision analysis Decision gate

6 >Known geology >Post appraisal well / test >Low risk >Proven technology solutions / procurement >Schedule value driver Examples >Tiebacks to own or shared infrastructure >Third party production to own infrastructure >Second tier asset review Xcelerate When To Use

7 >Poor subsurface definition >Particular technical challenges >Unique technology solutions / development required >Slow partners cannot keep up or not aligned However, even with the above… you can still use Xcelerate to quickly understand development issues without doing a long / expensive study Xcelerate When Not To Use

8 8 Thank you