Commercial Operations Subcommittee (COPS) Update to RMS 11/3/2015.

Slides:



Advertisements
Similar presentations
Profiling Working Group March 13, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 13, 2007.
Advertisements

Technical Advisory Committee COPS Update to TAC Debbie McKeever COPs Chair 2010.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
Commercial Operations Subcommittee (COPS) Update to RMS 6/2/2015.
COPS Update to TAC January 6, Voting Items Three voting items: COPMGRR015, Creating Section 8, ERCOT Settlement and Invoice Process 2. 2.
CCWG March 30 th Meeting CCWG Update to COPS April 13,
1 Profiling Working Group Update to COPS April 15, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
1 AMS Data Workshop ERCOT Overview of AMS Data Processes June 27, 2014 ERCOT June 27, 2014.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
Profiling Working Group January xx, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting January ??, 2006.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
1 Communication Plan for Change in DG Registration Threshold DG Registration Threshold > 1 MW –ERCOT Market Participant –Non-modeled RARF Aggregated unregistered.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.
Profiling Working Group August 2, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting August 22, 2006.
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
1 Commercial Operations Sub-Committee Update to TAC October 5, 2007.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Retail Market Subcommittee Update to COPS Kathy Scott May 13,
Commercial Operations Subcommittee (COPS) January 2014 Update to TAC 1/29/2015.
Settlement Stability 2015 Q1 Update to COPS Mandy Bauld ERCOT COPS 04/15/2015.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Profiling Working Group March 14, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for COPS Meeting March 14, 2006.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Commercial Operations Sub-Committee Update to TAC December 4, 2008.
1 Profiling Working Group 2014 Accomplishments & 2015 Goals.
October 9, 2012 Commercial Operations Subcommittee RMS Update Kathy Scott RMS Vice Chair.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
Settlement Stability 2015 Q3 Update to COPS Austin J. Rosel ERCOT COPS 10/14/2015.
Commercial Operations Subcommittee Update to TAC November 5, 2009.
Tuesday, October 6, 2015 (following RMS) COPS-RMS-WORKSHOPShttp://
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) October 2015 Update to COPS.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
COPS NOVEMBER 2014 UPDATE TO TAC 11/20/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
Distributed Renewable Generation Profile Implementation Plan.
October 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott October 16, 2013TAC Update to RMS 1.
1 Profiling Working Group Update to COPS October 14, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
Retail Market Subcommittee Update to COPS Kathy Scott November 5,
October 13, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements Task.
CCWG April 28 th Meeting CCWG Update to COPS May 12,
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Commercial Operations Subcommittee (COPS) Update to TAC 2/25/2016.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
COPS SEPTEMBER 2014 UPDATE TO TAC 9/25/2014 Harika Basaran, Chair Tony Marsh, Vice Chair.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Commercial Operations Sub-Committee Update to TAC January 8, 2009 Lee Starr, BTU.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Settlement Stability 2015 Q1 Update to COPS- DRAFT Blake Holt ERCOT COPS 07/15/2015.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
COPS JUNE 2013 UPDATE TO TAC 06/06/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
1 Profiling Working Group Update to COPS May 13, 2015 Jim Lee (AEP) – Chair Sheri Wiegand (TXU) – Vice Chair.
Retail Market Subcommittee Update to COPS Kathy Scott January 14,
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Commercial Operations Subcommittee (COPS) Update to RMS 9/1/2015.
LPGRR060, Load Profiling Guide Clean Up Related to LPGRR057
Commercial Operations Subcommittee (COPS) Update to RMS 11/1/2016
Profiling Working Group
COPS MAY 2014 UPDATE TO TAC 5/29/2014
Presentation transcript:

Commercial Operations Subcommittee (COPS) Update to RMS 11/3/2015

2 COPS VOTING Items for TAC o LPGRR055, Extend Load Profile Model Calendar Inputs to 2030  Previously tabled at TAC  Proposed Effective Date: November 1, 2015  Reason for Revision - Administrative  Extends the Load Profile Model calendar-related inputs in Appendix E, Profile Model Spreadsheets, from 2020 to 2030  Calendar inputs include calendar variables, daylight savings variables, sunrise/sunset times and holiday variables  Corresponding changes to calendar-related inputs will be made to the Load Profile Models in the MetrixIDR load forecast and backcast system

3 COPS VOTING Items for TAC o COPMGRR040, Alignment with NPRR719, Removal of Trigger and Requirement to Reduce the Distributed Generation (DG) Registration Threshold COPMGRR040 aligns language with the Nodal Protocols by removing the inclusion of the new proposed threshold for DG registration threshold as defined in Protocol Section 16.5, Registration of a Resource Entity, in the ERCOT Unregistered Distributed Generation Report, which is published on the Market Information System (MIS) Public Area. NPRR719 removes the trigger and requirement to reduce the DG registration threshold from Protocol Section 16.5, eliminating the new proposed threshold for DG registration. IA is less than $5k. COPS requests that TAC table COPMGRR040 until it can be considered with NPRR719.

4 COPS VOTING Items o NPRR719, Removal of Trigger and Requirement to Reduce the Distributed Generation (DG) Registration Threshold  Removes the requirement for ERCOT to reduce the DG registration threshold when the aggregated unregistered installed capacity of DG greater than 50 kW in any one Load Zone reaches 10 MW.  COPS submitted comments revising ERCOT’s comments and ERCOT staff showed support for the revisions. COPS voted to endorse NPRR719 as amended by the 10/7/15 ERCOT comments and as revised by COPS.

5 ERCOT Updates o September 2015 IT Service Metrics  Market Data Transparency IT systems met all SLA targets  Retail API SLA was not met; Find ESI ID at 97.8%; Target 99%  UNIX Production frame failure in Taylor data center and unplanned site failover, 9/20/ :42 to 9/21/ :00 Impacted Report publishing to the MIS, downloading of extracts and reports from MIS and EWS, MIS and ERCOT.com dashboards and displays, MOTE, NMMS, and Find ESI ID  CSWG and MISUG will review the SLA and Market Notice Distribution process and make recommendations for improvement o 3rd Quarter 2015 Settlement Stability Report  See Appendix A  Improvements are being made via NPRR720, Update to Settlement Stability Reporting Requirements

6 ERCOT Updates o Concept Discussion Take advantage of AMS technology to allow AMS meter data, by working with the TDSPs (both Competitive and NOIE), to flow into ERCOT’s registered non-modeled generation aggregation process to eliminate the settlements time delay for these resources  Non-Modeled Registered Generation is <10 MW  Interconnected at 60kV or below  There is an AMS meter installed or available, METERTYPECODE = AMS  A Resource ID (RID) is established Next steps: ERCOT staff will introduce the concept to WMS, and potentially the Metering Working Group ERCOT will work on a draft NPRR (Implementation cost and timeline not known at this time)

7 Communications and Settlements Working Group (CSWG) o Draft NPRR, Balancing Account Data Cuts  The CRR Balancing Account Extract provides a prototype of the CRR Balancing Account Invoice  The prior month’s balance is needed for shadow settlements, CRRBAF (m-1)  CSWG is working on a draft NPRR to include the prior month’s data cut in the Extract, to align the Nodal Protocols with the COPMG and the Balancing Account Extract User Guide

8 Profiling Working Group (PWG) o Unaccounted For Energy (UFE) Allocation Factors should remain ‘As-is’  Per a survey by TDSPs, “high voltage customers and interval data recorders contribute less to UFE on an interval by interval basis”  NIDR 1.0, IDR-Distribution 0.5, and IDR-Transmission 0.1 o Load Profiling Guide (LPG) Review  Protocol Section 18, Load Profiling, edits are complete and under final review  The PWG is now reviewing other sections of the LPG

9 Profiling Working Group (PWG) New Valley Weather Zone Update o ‘Virtual’ Weather Zone is still preferred for ERCOT forecasting purposes o ERCOT staff still evaluating how to distribute the Valley Weather Zone data o PWG agreed that ERCOT’s proposed solution is the best option because it includes minimum system changes and Market Participant impacts

10 Market Information System User Group (MISUG) o Work on the following initiatives continues  Draft NOGRR, Proposed revisions to NOGRR084  Reports to be Automated (16)  Disclosure Data User Guides review and re-write

11 Market Information System User Group (MISUG) o External Web Services (EWS) Modifications Workshop III  Held on September 29, 2015  Discussion for ways to improve ERCOT’s EWS in response to a request from the City of Garland for a more user-friendly and technologically up-to-date approach to data delivery  Survey results revealed high interest in  Subscription service  Notifications of report availability  API  Demonstration of web sockets  “Push” delivery  Appropriate for small data sets

12 Market Information System User Group (MISUG) Potential EWS System Changes o Subscription service  Report availability  Historical event information o API  Supported and documented .Net and Java platforms  Support for additional platforms is possible o Enhanced UI  Support for smaller shops  Ad hoc requests Next Steps  Make other stakeholders aware and gain support  Consider options for creating a project

13 Appendix A 3 rd Quarter 2015 Settlement Stability Report  8.2(c)(i) Track number of price changes (Slide 12)  8.2(c)(ii) Track number and types of disputes submitted (Slide 13)  8.2(c)(iii) Compliance with timeliness of response to disputes (Slide 14)  8.2(c)(iv) Other Settlement metrics (Slides 15-17)  8.2(c)(v) Availability of ESIID consumption data (Slides 18-23)  8.2(g) Net Allocation to Load (Slide 24)

14 8.2(c)(i) Track number of price changes Notes: Reporting Period: 2015 Q3 Operating Day # of Corrected Settlement Point Prices# of Intervals Affected DASPPRTSPPRTRMPR ORDC Adders DASPPRTSPPRTRMPR ORDC Adders 6/4/ /6/ /7/ /8/ /9/ /10/ /11/ /12/ /13/ /14/ /15/ /31/ /5/ Notes: Price corrections for OD between 06/04/2015 and 06/23/2015 due to data error (mean and standard deviation). Approved for Resettlement at 8/11/2015 Board. The remaining corrections (6/16-19,6/23) will be executed in Q4. Price corrections for OD 7/31/2015 corrected HE1-14 for PENA_ALL Settlement Point. Price corrections for OD 8/5/2015 were due to a system issue.

15 8.2(c)(ii) Track number and types of disputes submitted YEAR2015 QUARTERQ1-Q3 Row LabelsDeniedGranted Granted w/Exc. Open Total Submitted Congestion Revenue Rights-RTM 134 Energy-DAM 11 Energy-RTM Emergency Operations- RTM Ancillary Services- RTM314 Grand Total

16 8.2(c)(iii) Compliance with timeliness of response to disputes YEAR2015 QUARTERQ1-Q3 Row LabelsFinalTRUE-UP Grand Total Congestion Revenue Rights- RTM100% Energy-DAM100% Energy-RTM100% Emergency Operations-RTM100% Ancillary Services- RTM100% Grand Total100%

17 8.2(c)(iv) Other Settlement metrics NOTE: ERS Final settlement OD data is not represented in graph. Average percent change per year YearFinalTrue Up %0.42% %0.41% %0.34% %0.32% %0.17%

18 8.2(c)(iv) Other Settlement metrics NOTE: “Total of Charges” represents the sum of statements that are a net charge to the Market Participant (i.e., the amount due to ERCOT) Q1-Q3 AVERAGE $7.06$4.29$5.41$6.46$4.79 MEDIAN $3.85$3.67$5.11$5.66$4.20 MIN $1.81$1.70$2.96$1.96$1.86 MAX $108.69$26.21$19.45$47.93$42.34

19 8.2(c)(iv) Other Settlement metrics NOTE: “Total of Charges” represents the sum of statements that are a net charge to the Market Participant (i.e., the amount due to ERCOT) Q1-Q3 AVERAGE $7.19$5.19$6.61$8.21$6.14 MEDIAN $4.69$4.51$5.97$7.15$5.13 MIN $2.38$2.34$2.98$3.32$2.90 MAX $173.66$63.34$40.52$123.68$33.61

20 8.2(c)(v) Availability of ESIID consumption data

21 8.2(c)(v) Availability of ESIID consumption data

22 8.2(c)(v) Availability of ESIID consumption data

23 8.2(c)(v) Availability of ESIID consumption data

24 8.2(c)(v) Availability of ESIID consumption data

25 8.2(c)(v) Availability of ESIID consumption data Note: Significant reductions due to an overall tightening- up of the process (Checks for quality of the data coming in and feedback being provided to the TDSPs) Result: Less than 500 out of 7M ESI IDs being estimated

26 8.2(g) Net Allocation to Load

27 The next COPS meeting is scheduled for December 9, Questions?