Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.

Slides:



Advertisements
Similar presentations
Advanced GAmma Tracking Array
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
June 9, Tetsuro Sekiguchi, KEK BNL-E949 Collaboration The E949 experiment The analysis The results Conclusions BNL, FNAL, UNM, Stony Brook Univ.
Status of DHCAL Slice Test Data Analysis Lei Xia ANL-HEP All results preliminary.
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
03 Aug NP041 KOPIO Experiment Measurement of K L    Hideki Morii (Kyoto Univ.) for the KOPIO collaborations Contents Physics Motivation.
New Calorimeter Technologies for NLC (a) Secondary Emission Calorimeter Sensors (b) Cerenkov Compensated Precision Calorimetry Y.Onel, University of Iowa.
1 K L →π 0 νν 探索実験 KEK-PS E391a における Run3 データ解析の現状 JPS 2008 Spring Meeting Hideki MORII (Kyoto Univ.)
The HyCal Calorimeter A. Gasparian NC A&T State University, Greensboro, NC Outline  The crystal modules  The frame and transporter  Temperature stability.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
HYP03 Future Hypernuclear Program at Jlab Hall C Satoshi N. Nakamura Tohoku University 18 th Oct 2003, JLab.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
Setup for hypernuclear gamma-ray spectroscopy at J-PARC K.Shirotori Tohoku Univ. Japan for the Hyperball-J collaboration J-PARC E13 hypernuclear  -ray.
Jan MDI WS SLAC Electron Detection in the Very Forward Region V. Drugakov, W. Lohmann Motivation Talk given by Philip Detection of Electrons and.
Status of E391a Search for K L    decay G.Y.Lim IPNS, 32nd ICHEP 19 th August 2004 Beijing.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
New Developments of Flavor Physics Kyoto University H. Nanjo for E391a and K O TO collaboration.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
The new K L     experiment (KOTO) at J-PARC Hiroaki Watanabe for the J-PARC E14 KOTO collaboration KEK, IPNS.
A search for deeply-bound kaonic nuclear states in (in-flight K -, N) reaction Hiroaki Ohnishi RIKEN.
Status of E391a G.Y.Lim IPNS, KEK. K L    decay Experimental difficulties  Tiny branching fraction Great number of K L decays  Weak Kinematical constaints.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
The NA62 rare kaon decay experiment Photon Veto System Vito Palladino for NA62 Coll.
Nov Beam Catcher in KOPIO (H. Mikata Kaon mini worksyop1 Beam Catcher in the KOPIO experiment Hideki Morii (Kyoto Univ.) for the KOPIO.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Measurement of K L    decay G.Y.Lim IPNS,KEK. Why K L →    ? Flavor Changing Neutral Current Br(K L   o  ) = 6  1 ・ Im(V td V ts ) 2 X 2 (x.
Rare decay Opportunities at U-70 Accelerator (IHEP, Protvino) Experiment KLOD Joint Project : IHEP,Protvino JINR,Dubna INR, Moscow, RAS.
Douglas Bryman University of British Columbia APS May 3, 2011.
KOPIO Catcher System RSVP Preliminary Baseline Review Brookhaven National Laboratory April 6, 2005 Tadashi Nomura (Kyoto U.)
6-8 March, 2006T. Workshop on "Mass Origin and Supersymmetry Physics"1 Development of an Aerogel-based Photon Detector T. Nomura (Kyoto Univ.)
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
Medium baseline neutrino oscillation searches Andrew Bazarko, Princeton University Les Houches, 20 June 2001 LSND: MeVdecay at rest MeVdecay in flight.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Current estimation of the background level Ken Sakashita ( Osaka University ) for the E391a collaboration 1.Overview/Motivation 2.4  data analysis 3.2.
Future prospects on K-decays at KEK Hyosang Lee Pusan National University Nagoya.
IHEP/Protvino for FP420 R&D Collaboration 1 IHEP/Protvino Group: Igor Azhgirey Igor Bayshev Igor Kurochkin + one post-graduate student Tools:
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
 0 life time analysis updates, preliminary results from Primex experiment 08/13/2007 I.Larin, Hall-B meeting.
SoLID Background Update Zhiwen Zhao UVa 2013/11/08 1.
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
May 26-27, 2005Tadashi Nomura (Kyoto U), KRare05 at Frascati, Italy1 KOPIO Beam Catcher Tadashi Nomura (Kyoto U.) Contents –What is Beam Catcher? –Concept.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Using Fluorescence X-rays for Non-invasive Biopsy Team members: Savannah Gill Kelvin Lin Mike McHugh Trey Reece Derric Williams Advisors: Dr. Frank Carroll.
Current Status of E14 Experiment at J-PARC 정명신, 김용주 1, 우종관 1, 고재우 1, 임계엽 2, 김은주 3, 안정근 4, 이효상 5 한양대학교, 1 제주대학교, 2 KEK, 3 전북대학교, 4 부산대학교, 5 서울대학교.
Tokubetsu-shishin kickoff meeting, Sep-13 th 2011 Satoru Uozumi Korean Activities on Calorimetry in ILC History of Japan-Korea collaboration.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
KOPIO meeting, T. Nomura (Kyoto U.)
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
on behalf of ATLAS LAr Endcap Group
Gamma-ray Large Area Space Telescope ACD Final Performance
Kyoto University H. Nanjo
Gamma-ray Large Area Space Telescope
Jin Huang Los Alamos National Lab
Tadashi Nomura (Kyoto U), KRare05 at Frascati, Italy
Simulation study for Forward Calorimeter in LHC-ALICE experiment
K0 beam line for the E391a experiment
GEANT Simulations and Track Reconstruction
KEK-PS E391a Run3データを用いたKL→π0νν解析の現状
The future of the E391a experiment
LC Calorimeter Testbeam Requirements
Zhiwen Zhao,UVa for EC group
Presentation transcript:

Status of E14 G.Y.Lim IPNS, KEK

E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC E14 (Step-2) KL beam line sharing T1 targetUpdated E391a detector.

Large parameter space for NP

In the Step-1, Beam line with common target at the new facility. Finer segmented longer calorimeter. Neutron insensitive beam hole photon veto. To fit the high intensity environment. To establish a way to reject backgrounds and properly estimate their level. To make a realistic plan for the Step-2.

Beam line

KL Beam line

Original Plan for Beamlines S. Nagamiya 4 th J-PARC PAC

Characteristic of KL line Collimation with multi-stage thick collimator. Different situation compared to E391a. –Finite size of target image. –Start collimator far from production target. Parallel incident neutron. Affected by various materials upstream. Beam Sharing with K1.1. –Longer beam line : smaller solid angle –Larger extraction angle: better KL/n ratio, soft neutron. E391a results shows reliability of M.C. study A trial for E14

The effect of upstream materials Start KL collimator T1 target Pb absorber Scattering points to produce halo neutron Halo neutrons will be increase as a factor of 1.6 with current optimized K1.1 elements.

To avoid upstream scattering Cu collimator (additional possible source) Wide range of neutron generation at Cu. Guide line for trimming. Beam size V.S. Halo production.

Square beam To adapt target image. Beam hole of the calorimeter is square. (easy to construct) To increase KL yield. To decrease halo neutrons. We have to check –Large effective radius (B.G. level). –Effects of primary beam stability.

KL yield Depends on MC package –G4 / G3 / FLUKA  We use G4 result as a default  FLUKA may reproduce data according to production experiment (BNL-E802)

Detector up-grades

E14 Detector

Calorimeter 7.0 X 7.0 X 30 cm X 2.5 X 50 cm X 5.0 X 50 cm 3

No shower leakage We can suppress the CC02 event to extend into signal region by correct energy measurement and better position resolution. E391 Run-2 Result

Shower shape analysis Fusion rejectionAngle Measurement E391a E14 E391a

Status of preparation CsI transfer –Procedure established –1st shipping (~300) in Mar Readout R&D –125MHz FADC –Beam test in Dec 2007 Cockcroft-Walton PMT base –1st prototype in Jan 2008

Rehearsal of CsI disassembling At FNAL-KTeV hall in Dec 2007

And CsI packing

Test of CsI Readout Beam test at FNAL in Dec 2007 –Using M-Test line 125MHz FADC –16ch VME module –FPGA control  Debugging  Synchronization with usual DAQ system

Test of CsI Readout The readout worked successfully.

Beam Hole Photon Veto Insensitive to neutrons: photon detection inefficiency for E  > 1 GeV False hit rate : 2MHz Proven by prototype at the beam test

MB Upgrade Extra 5Xo for better efficiency. Studying inner extra module. - Low energy photon. - Inner module with better visible ratio.

Schedule digest

Summary E14 aims at search for the K L    with SM sensitivity. Beam line design is under studying. –Fabrication of beam line elements in FY2008. –Beam line construction and survey in FY2009. CsI Preparation –Prototype electronics was tested at FNAL on Dec –1 st transferring process is being done on Feb. and March, –Assembling will be done in Back ground estimation is up-dating. –Continuously debugging and developing GEANT4-base M.C. Aiming at engineering run in 2010.

Back-ups

Comparison among three different configurations. ‘KL line alone’ reduces N_halo/N_KL as factor of 3.3 compared to that of ‘original K1.1’. ‘Modified K1.1’ recovers N_KL, however the number of halo neutrons is still larger as factor 1.6 compared to that of ‘KL line alone’. - We need to check feasibility to make large holes (r=2.5cm) in K1.1 magnets.