What is “Constructability”?

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

MAINTENANCE PLANNING AND SCHEDULING
DM Copyright © Tekes Digital Product Process.
Business Critical Rules March 2015
Energy Efficient Operations Presentation to ASHRAE Energy Expo October 2, 2013 Center for Energy and Environment.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
1 Preconstruction Site investigation, Scheduling, Estimating, and design Preconstruction Site investigation, Scheduling, Estimating, and design Prepared.
Factors to Consider in Innovative Contracting Doyt Bolling and Jared Holland Utah Technology Transfer Center.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
ESTIMATING By Laith Jacob.
Management 11e John Schermerhorn
DRIVING INNOVATION AND ABILITY TO COMPETE THROUGH OUTSOURCING Anthony (Tony) C. Bernardo, Alloy Polymers Inc. NPE 2003 bernardo:
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
An Introduction to….. Tactical Communications Teams “Practical Tactical” Presented by, Brad Reinert & Matt Markland Montgomery County Tactical Communications.
Traffic Signal Standards. History Chaos NEMA (TS 1) 170 (CALTRANS / NY) 170E i NEMA TS ATC 2070N Memory Plug-in Others... Electromechanical.
Gulf of Mexico Challenges with Contractor Verification - Skills and Knowledge.
MAINTENANCE & TRAFFIC OPERATION INCIDENT MANAGEMENT.
I n t e g r a t I n g C S S Practitioner Module 6 1 Module 6: CSS and Livability in Construction, and Maintenance.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Solid Performance Solutions This presentation was created to give you the ideas and support to present “Rethinking New Product Training Development” in.
CONSTRUCTION & THE FOOD INDUSTRY The Insurance Industry View Steve Exwood & Jon Miller.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
KEEPING LABOR AND OVERHEAD COSTS DOWN Controlling Labor and Overhead Costs as a Long Term Strategy.
Turning the change of Globalisation into an Opportunity Understand reality then make reality better.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
1 Toronto, Ontario - October 31 and November 1, 2002 October 31, 2002 David Dern Technology Roadmap for Intelligent Buildings Marketing Director Continental.
Construction Cost Estimating Class #2: Concept Estimating Prof. Ralph V. Locurcio, PE.
Detailed Quantity Estimating Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Nursing Home Incident Command System
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Good Client Service: an Owner’s Perspective MONTGOMERY COUNTY ENGINEERS OFFICE.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
“The process of moving an item from point A to point B.” “Safe, efficient, reliable, and sustainable movement of persons and goods over time and space”
FACILITY PLANS OPERATIONAL EMERGENCY MAINTENANCE.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
1 Project Management Introduction. 2 Chap 1 What is the impact? 1994: 16% of IT projects completed “On-Time” 2004 : 29% of IT projects “On- Time” 53%
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
How eNet4S can benefit your project? eNet4S Software Solution Business Team Chief Technology Officer July 11, 2006.
PURCHASING & STORAGE MANAGEMENT Instructor Abdel Fatah Afifi 2 nd Semester 90/10.
Laura J. Weber Solid Waste Project Manager St. Regis Mohawk Tribe ITEP Tribal Transfer Station Course.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
1 Accommodating Utilities in Highway Rights-of-Way Federal Agency Update IRWA/AI Conference Las Vegas, NV January 13, 2009.
MIT - October 1, 2004Jeffrey D. Ensor 1 RSTP Planning for Operations Jeffrey D. Ensor Malaysia Transport Group M.I.T. October 1, 2004.
Construction of a Transfer Station
Contractor Alternate Design Serving the Public’s Best Interest.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
CAD Versus BIM BIM systems contain several noticeable improvements over their CAD predecessors. These improvements lie within the modeling and design features.
Resident Engineer Panel Discussion Jack Stone, P.E. District 2 Engineer, Casper Chad Aagard, P.E. District 2 Engineer, Casper Pete Hallsten, P.E. District.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
CVE 4070 Construction Engineering HW #6 review Test-2 & Review Prof. Ralph V. Locurcio, PE.
Managing Multiple Projects Steve Westerman California Department of Motor Vehicles Steve Young Mathtech, Inc.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Learning the Basics of Recreation Facilities
Top 10 Ways to Expedite Design Reviews & Inspections.
CONTEXT-SENSITIVE DESIGN 2002 Texas Department of Transportation Design Conference.
1 CQA Training QUESTION BANK. 2 CQA Training QUESTION 1 THE TWO DEFINITIONS OF QUALITY ARE: QUALITY MEANS MEETING REQUIREMENTS QUALITY MEANS FIT FOR USE.
Profession Practices (ECIV-5105)
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
An Analysis of Project Management Practices Related to Constructability followed in Indian Construction Industry Sharmin Khan Assistant Professor, Department.
Construction project management
Transportation.
Transportation.
Better with Augmented Reality
FAR part 1.
Presentation transcript:

What is “Constructability”? The extent to which a design of a facility provides for ease of construction yet meets the overall requirements of that facility

Brehm’s Definition of “Constructability” “Doing for fifty cents what any damn fool can do for a dollar”

Design + $$$ = Solution

CHALLENGE Getting the designers and constructors from diverse cultural backgrounds and different goals to work together effectively

ALL ABOUT ATTITUDE! It is an attitude that must prevail through: Conceptual planning Design and procurement Field operations

Direct Benefits Construction planning is made easier Both design and construction costs can be reduced The construction schedule may be shortened Better quality can be required and expected Earlier owner occupation

Indirect Benefits Building a collaborative team committed to project goals Cross discipline training Transfer of expertise from other projects Constructors better understand design intent, and vice versa Increased innovation in both design and construction Competitive advantage

General Constructability Checklist Provide work areas when practical Verify utility locations Assure utility construction coordination with other Agencies Are pay items in the bid tabulation covered by the specs? Is all of the required work covered by pay items?

General Constructability Checklist Provide access to work areas Consider access for routine maintenance in design Consider construction methods that “drive” the design Is weather a factor? Are materials available?

General Constructability Checklist Keep design simple and flexible Standardize design elements Do specifications allow work efficiency? Are specifications clear, and conform with current practices? Check local Agency requirements for environmental issues.

General Constructability Checklist Which material is more economical? Consider material type available during staged construction. Can access be constructed to remote locations? Minimize restricted areas that eliminate normal equipment use Minimize low production or hand work areas

General Constructability Checklist Do Special Provisions fit the job? Strive for simplicity in design Minimize architectural details Consider working areas needs around structures Check for overhead utility conflicts

General Constructability Checklist Consider access to structure site Can traffic conflicts be reduced? Are work zones large enough for equipment access? Can emergency vehicles travel thru without delays?