R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.

Slides:



Advertisements
Similar presentations
LKr for the dry run (and not only…) R. Fantechi 23/5/2012.
Advertisements

June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
LKr readout: present and future R. Fantechi 30/8/2012.
DAQ Status. F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
David Cussans/Scott Mandry, NIKHEF, October 2008 TLU v0.2.
R. Fantechi. DAQ tools My feelings Not dealing with readout stuff No TEL62, no CREAMS, etc But the auxiliary software needed to run the experiment After.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Status of NA62 straw electronics Webs Covers Services Readout.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
R. Fantechi. Cream specifications Prototype board.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
The recent history and current state of the linac control system Tom Himel Dec 1,
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
Status of the NA62 network R. Fantechi 23/5/2012.
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
NA62: The LKr Electronics Matt Huszagh. Installation & Setup (1/5) Crate Setup 8 vertical columns of 4 crates Almost all installed.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Status of NA62 straw electronics and services
Status of NA62 straw readout
INSIDE in-beam PET system assembly and test at INFN Torino
LKr status R. Fantechi.
Calicoes Calice OnlinE System Frédéric Magniette
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Angela, Giovanna, Marco, Riccardo
Injectors BLM system: PS Ring installation at EYETS
Operating systems and Internet services
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
Presentation transcript:

R. Fantechi

Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of the chosen capacitors Order cancelled and new types chosen Some mechanical adjustment needed Changed also fans and check DCS cabling Tests completed beginning next week Shipping foreseen on February 17th Install as soon as they are in ECN3 Water cooling back on the 22 nd, the ventilation duct has been reinstalled (after RICH maintenance end)

Shutdown work Improvements in temperature monitoring (from December meeting Implement water temperature measurement in the DCS Hardware is ready, also additional temperature switches and thermistors Optimize the thresholds on the Vaisala monitor + put its power and network connections outside the CREAM racks Try to get the maximum reliability from CAEN VME fan trays (now poor) Work to be started Additional temperature/humidity sensors available in Ethernet-controlled PDUs (see next)

Shutdown work Ventilation units Several ventilation units were refurbished before and during the run Mainly turbine fans exchange 3 units still with old components Plan to refurbish them during the next weeks

Shutdown work Remote switching of CREAM crates 5 Ethernet-controlled PDUs bought (only 2 available at the stores) 4 LKr + 1 LKr L0 Add a small switch to concentrate Ethernet lines to the main switch of the EB Installation and cabling foreseen for the end of February Additional temperature/humidity monitors available

Firmware Multiple event data packet Second offer from CAEN arrived just before Christmas Order placed beginning of January The work has started in CAEN A first version available even this week Possible to start testing in the lab A one-week visit of the CAEN engineer foreseen on Feb 29 th. Complete test and debug in the lab and possibly on the farm

Firmware Test bench status (bldg 14) Restart and adjust old setup CREAM crate, VME bridge, PC, LTU system, NIM LKr pulsers, LKrL0 crate, network connections Standalone test program to read data from the CREAMs both at L0 and L1 The basis for the firmware test Easily adjustable for further tests and fw implementations

Firmware Tests with the PC farm Need modification to the software Unpacking fragments from the packed data Basis of the modification existing in some old Jonas’ code Started today to have a look with Giovanna Possible, but not certain, to have a working software for the end of February when CAEN will be here Anyway, the test at the farm should be done at the end of the lab test, as any firmware configuration on the whole CREAM system will take one night

HV distribution Split channels with high current Tried last year, without success Need to check individual spare CAEN channels Fix broken channels on single column V/I monitor Also modify full scale range to cope with higher current in central cells

Run control interface Improvements needed Better format for the display used to spot CREAM problems Add communication with the run control to display a message on the “Big Screen” if one CREAM blocks. And maybe a specific sound… To be started soon

Reconstruction & Online monitor Work started on the reconstruction Bug fixed for a clean treatment of energy assignments to the cells, rejecting cells where the maximum is in the first or last sample Re-engineer and implement in the reconstruction a private code by Giuseppe for an alternative cluster finding, leading to the recovery of clusters not found by the standard method Online monitor Add few more histograms to the actual ones