1 ORDC Curve Discussion ERCOT QSE Managers Working Group 9/4/2015.

Slides:



Advertisements
Similar presentations
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Advertisements

NERC LTRA Update / CDR Capacity Counting Issues
Seasonal Adjustment Factor Mark Ruane Credit Work Group ERCOT Public July 23, 2014.
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Capacity Forecast Report Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG September 16, 2015 ERCOT Public.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
1 Project Update and Summary of Project Priority List (PPL) Activity to Date August 14, 2014.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
NPRR-574 Raiden Commodities LP Patrick de Man WMS 11/13/2013.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
WEATHER BY: JENNIFER FAUTH KINDERGARTEN.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
1 Project Update and Summary of Project Priority List (PPL) Activity July 16, 2015.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date May 15, 2014.
ERCOT, Market Analysis 2013 Annual Constraint Competitiveness Test (CCT) Study Results – Update for 8/27/12 CMWG 8/27/2012 ERCOT Public.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
1 Project Update and Summary of Project Priority List (PPL) Activity April 16, 2015.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
South Texas Electric Cooperative Load Forecasting Methodology ROS Meeting, 6/10/10.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Ancillary Services Redesign Update ERCOT TAC Meeting /25/2015.
Scheduling and Operating Transmission Devices in the Nodal Environment.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
1 Project Update and Summary of Project Priority List (PPL) Activity November 12, 2015.
1 Load to Price Correlation CWG/MCWG Suresh Pabbisetty, CQF, CSQA. ERCOT Public February 20, 2014.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
AMIT/DSWG Workshop ERCOT Demand Side Working Group Meeting September 30, 2011 Jay Zarnikau, Frontier Associates.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
Capacity Forecast Report Fall Update Sean Chang Market Analysis and Design Suresh Pabbisetty CQF, ERP, CSQA Credit CWG/MCWG December 16, 2015 ERCOT Public.
1 NPRR638 (Seasonality) Back-Cast Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public October 3, 2014.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date June 11, 2014.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
2017 Seasonal Adjustment Factors
RTDF Overview of Data Analysis & Status of “Consesus Items”
Project Update and Summary of Project Priority List (PPL) Activity to Date July 17, 2014.
COPS MAY 2014 UPDATE TO TAC 5/29/2014
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Calendar.
Presentation transcript:

1 ORDC Curve Discussion ERCOT QSE Managers Working Group 9/4/2015

2 Discussion Outline Review of Loss of Load Probability –Review of years used for the Mu and Sigma calculation –Review of hourly blocks and seasons –Data used for Mu and Sigma calculation Security Constrained Economic Dispatch (14)At the end of each season, ERCOT shall determine the ORDC for the same season in the upcoming year, based on historic data using the ERCOT Board-approved methodology for implementing the ORDC. Annually, ERCOT shall verify that the ORDC is adequately representative of the loss of Load probability for varying levels of reserves. Twenty days after the end of the Season, ERCOT shall post the ORDC for the same season of the upcoming year on the MIS Public Area.

3 Years used in Mu and Sigma calculations If the methodology to calculate the Mu and Sigma stays the same then over time the curve change year over year will be very small

4 Seasons and Hour Blocks used for Mu and Sigma Anytime blocks of data are used The high intervals will be lowered The low intervals will be raised Block to block, Identical system conditions can have different ORDC price Same with season to season and the combination of the two This will happen inherently no matter how small or large the blocks are Potential Hour to Hour difference can be reduced the smaller the time blocks The smaller the time blocks the more data is required for representative results Would a blended value give more stable results? Hour EndingHour_block MonthSeason 1WINTER 2 3SPRING 4 5 6SUMMER 7 8 9FALL 10FALL 11FALL 12WINTER

5 Seasons and Hour Blocks used for Mu and Sigma LOLP Distribution as of March seasonhour_blockmeansd WINTER WINTER WINTER WINTER WINTER WINTER Hourly Curves; smoothed within the seasons LOLP Distribution as of March seasonhour_blockmeansdHour BlockFactorBlock Hour WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER WINTER In this example Hour Block 4 values would become 4 separate hourly values with Hours 1 and 2 of the block smoothing with the previous hour block Hours 3 and 4 of the block smoothing with the next hour block

6 QUESTIONS / COMMENTS???

7 Appendix

8 Mu and Sigma Posting The Summer 2016 (effective 6/1/2016) values will be posted in September The Mu and Sigma values will be recomputed using most recently approved methodology; NPRR 710 Approved on August 11, 2015

9 Mu and Sigma Posting Calendar Security Constrained Economic Dispatch (14)At the end of each season, ERCOT shall determine the ORDC for the same season in the upcoming year, based on historic data using the ERCOT Board-approved methodology for implementing the ORDC. Annually, ERCOT shall verify that the ORDC is adequately representative of the loss of Load probability for varying levels of reserves. Twenty days after the end of the Season, ERCOT shall post the ORDC for the same season of the upcoming year on the MIS Public Area. The historical data will be recomputed using most recently approved methodology This means if there are to be changes they need to be made >=9 months before change is to take effect Values are posted 9 months prior to being used by SCED (e.g. Summer 2016 posted Sep-2015 and used on Jun-2016)