06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.

Slides:



Advertisements
Similar presentations
1 Series Resonant Converter with Series-Parallel Transformers for High Input Voltage Applications C-H Chien 1,B-R Lin 2,and Y-H Wang 1 1 Institute of Microelectronics,
Advertisements

Daikin Altherma™ Troubling Shooting
Senior Design Project Team John Kmiec John Pipitone Project Advisor Dr. Lili He LED Based Track Lighting System San Jose State University Senior Project.
Professor Sung-Yeul Park
POWER SUPPILES LECTURE 20.
EKT214 - ANALOG ELECTRONIC CIRCUIT II
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
Stephen Pemberton TE-MPE-EE 1 DQLPUR Prototype Testing Initial Results: Thermal Tests Voltage Drop Off Tests.
Chapter 2 Transformers.
12/2/2001Ivan Hruska & Georges Blanchot1 LV power supply for TILECAL Requirements –7 outputs for one drawer (+5V, -5V,+15V,- 15V,+3.3V) –total power is.
1 1 Electric Vehicle Power Converters Sam Emrie Jacob Anderson Advisor: Dr. W. Na.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Cooling design of the frequency converter for a wind power station
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
Powering the main linac implications Daniel Siemaszko, Serge Pittet OUTLINE : Cost impact of power converters, power consumption and powering.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
CHAPTER 18 Power Supplies. Objectives Describe and Analyze: Power Supply Systems Regulation Buck & Boost Regulators Flyback Regulators Off-Line Power.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Verigy V93000 Service Training
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
MUEV Phase III By: Kevin Jaris & Nathan Golick. Introduction Petroleum is a finite resource. Demand for clean energy is driving the increase in the production.
© International Rectifier DirectFET  MOSFETs Double Current Density In High Current DC-DC Converters With Double Sided Cooling.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL News –Market survey is close to the final state PS requirements for whole box Bricks specification.
7/2/2003Ivan Hruska,Francisca Calheiros1 Radiation test of components for LV power supply design  Test done in PSI verification and selection.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
V.Shutov Dec.2014 Present Design Status Of Multichannel Power Supply For AHCAL SiPMs.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
20 Mar 2007ACES workshop -- Switched Capacitors -- M. Garcia-Sciveres1 Switched Capacitor DC-DC converters Peter Denes, Bob Ely, Maurice Garcia-Sciveres.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Presented by : GROUP 1 Associates: Ajeet Kumar Pooja Raikar Sangamesha J M Utkarsh Kumar Viresh Mathad.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 Radiation test of PL500 in TCC2 Conclusion from last test in Louvain –All DCDC converters ran.
Rd07 Conference th June 2007 Florence, Italy 1 High frequency stepdown DC-DC converter with switched capacitors This work is part of the INFN DACEL.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
COMPUTER SMPS POWER SUPPLY
Upgrade of the TileCAL LVPS System Gary Drake Argonne National Laboratory, USA In Collaboration with The University of Chicago CERN Feb. 25, 2009 ATLAS.
Mauro Citterio Milano, PP2/Services - an update - Mauro Citterio INFN Milano Type II cables  Layout in progress  Duplication of VVDC wires.
AC Current An AC circuit consists of a combination of circuit elements and an AC generator or source The output of an AC generator is sinusoidal and varies.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Wiener crates; An installation and power supply analysis. Magnus Bjork Be/Co/Fe
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
HNC/D Engineering Science
Design, Evaluation and Application of a Fuel Cell Vehicle
TRANSFORMERS.
T-simulation OUTLINE Inputs to the T-simulation: chips, boards, crate mechanics and fan T-simulation performed into two steps: On large scale: simple AM.
LVPS HEC Overview and Development
SMPS.
Calorimeter Mu2e Development electronics Front-end Review
Block Diagram Transmitter Receiver × 2 Transmitter Power Supply ADC
ALICE Muon Tracking Upgrade EDR Answers
International Conference Power Plants 2014-Zlatibor
ECE 445 Senior Design, Spring 2018
Electrical Machine-I EE 2107 Dr. Md. Sherajul Islam
Radiation- and Magnet field- Tolerant Power Supply System
Presentation transcript:

06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future

06/03/2002Ivan Hruska EP/ATE2 LV brick for TILECAL  New brick design - LT sample extension

06/03/2002Ivan Hruska EP/ATE3 LV brick for TILECAL

06/03/2002Ivan Hruska EP/ATE4 LV brick for TILECAL  New design - based on PSI results from June ‘02 PCB design ready - 8 pieces produced Still in debugging procedure - check of all possible effects New custom made flat transformer New rectifying MOSFET Efficiency 90% till 30A !

06/03/2002Ivan Hruska EP/ATE5 LV brick for TILECAL  Experience from debugging Debugging of prototype With first type of transformer & IRF MOSFET we reached only 75% of efficiency Problems with EMI in surrounding of LT1681  original schematics changed to improve situation  redesign of PCB needed-shielding/grounding Tested water cooling via alumina bars  works well but  wrong thermal contact for some components - co- planarity of bars  soldering of alumina bars to the semiconductors High side driver power circuit added  additional winding on transformer

06/03/2002Ivan Hruska EP/ATE6 LV brick for TILECAL  Power dissipation from MOSFET drivers need of external boost of secondary driver  25% overload for primary no-change  survived TID & SEE in PSI in the same conditions  possible to cool in final setup  New components exchanged & checked New flat PCB transformer - custom made by Payton - SMD New MOSFET from VISHAY - low Rdson < 3.5mohm

06/03/2002Ivan Hruska EP/ATE7 LV brick for TILECAL  Temperatures of components measured all ~ 30degC excluding MOSFET drivers  primary 55degC  secondary 50 degC MOSFETs  45degC when full power Transformer - PAYTON  75 degC Some of hot chips can be cooled

06/03/2002Ivan Hruska EP/ATE8 LV brick for TILECAL Efficiency measured with IRF -> 86 % (only to 20A - cooling problems) with VISHAY SUM110 -> 90% - 30A (power components ~45 degC)

06/03/2002Ivan Hruska EP/ATE9 LV brick for TILECAL  Not yet completely solved High side driver power when low PW ratio - very low output power Resonance of transformer in some regimes of operation

06/03/2002Ivan Hruska EP/ATE10 LV brick for TILECAL  Design of small cooling system Impossibility to test the brick only with air cooling Used heatsink from ‘01 design Tank with water & pump - no heat exchanger Need of additional & cheap cooling systems for radiation tests in: PSI TCC2

06/03/2002Ivan Hruska EP/ATE11 LV brick for TILECAL  Radiation tests Planned test in PSI delayed by 3 months Not sufficient flux in PSI during Nov’02 Test performed see special presentation Lateral SEE Test of MOSFETs (comments to my TMB presentation ) SEE test of new rectifying MOSFET SEE Test of high side driver chip IR 2213 Optocoupler for synchronous rectifying New linear regulators ( LM117 - reduction of costs ~ 40CHF/brick ) Crowbar ( transil ) Bipolar latches for remote control

06/03/2002Ivan Hruska EP/ATE12 LV brick for TILECAL  Results and plans We have verified and selected most of components for the design To get missing information we are preparing additional component test + NIEL test + board test Design changes according to results from SEE,TID & electrical tests (EMI) new PCB design should be very close to the prototype

06/03/2002Ivan Hruska EP/ATE13 LV brick for TILECAL  Remote control Design of remote control PCB based on 2001 design and new ideas how to use ELMB for power supply ELMB is not reliable component in radiation - SEEs Idea of “electronic shielding” by using bipolar latch verified Good results from SEE test of latches Discrete DAC for voltage trim

06/03/2002Ivan Hruska EP/ATE14 LV brick for TILECAL  Power & cable measurements Selected cable (USA15->UX15) ~ 2.20CHF/m Tests of real resistivity of whole circuit in preparation complete connector & cable setup  Bulk supply Detailed specification prepared Because of changes of voltage drop -> sense wires or negative resistance required Cooling and deployment preliminary solved 9 crates is possible to place to one 52U high rack Need of only ~2.5 rack for all 64 channels Cooling is sufficient

06/03/2002Ivan Hruska EP/ATE15 LV brick for TILECAL Example of rack with 9 crates of bulk power supply in USA15 3 boxes can have maximum power dissipation ~ 3kW 1.5kW dissipation from 3 crates Power coming from top bus bars - 75A/ phase Not yet solved power distribution inside racks Consultations with Paul Maley & J. Inigo - Golfin 52U RACK 27 outputs/rac k total input power 45kW Current 75A/phase 4U empty space 15kW section input/ 1.5kW power dissipati on Turbine & rack control 4U 3 x AC/DC 1700W output converter in 4U Air deflector Heat exchanger Fan tray Heat exchanger Fan tray Heat exchanger Fan tray

06/03/2002Ivan Hruska EP/ATE16 LV brick for TILECAL  Conclusion Design of new PCB component placement electrical test radiation test Additional radiation test of some components SEE test for MOSFETs & chipset statistics NIEL test Cooling unit for radiation tests needed Ordering of prototype of bulk supply Test of cabling system ( USA15-> brick)