Hybrid Activities for ABC130 1. 2 Aim to freeze thermo-mechanical layout next week in readiness for submission Will make use of a resistive serpentine.

Slides:



Advertisements
Similar presentations
Packaging.
Advertisements

Stave Hybrid Status Ashley Greenall 1. Current Status Current build of hybrids (Version 3) distributed to 6(+1) sites: Cambridge, DESY, Freiburg, LBL,
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Hybrid Status Carl Haber 12-Aug-2008 UCSC. 6 x 3 cm, 6 chips wide 10 x 10 cm, 10 chips wide 1 meter, 3 cm strip, 30 segments/side 192 Watts (ABCD chip),
1. THE OSIRIS TUNABLE FILTERS  OSIRIS uses two 100 mm aperture Fabry-Perot tunable filters. One of them is optimized for short wavelengths, and one for.
Prof. John Nestor ECE Department Lafayette College Easton, Pennsylvania ECE VLSI Circuit Design Lecture 20 - Chip-Level.
S. Reda EN1600 SP’08 Design and Implementation of VLSI Systems (EN1600) Lecture 24: Computer-Aided Design using Tanner Tools Prof. Sherief Reda Division.

1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
Chip Carrier Package as an Alternative for Known Good Die
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Designing for the Transportation market CONFIDENTIAL: All contents copyright of Illinois Tool Works, Inc. (ITW). The ITW Photonics Group, Cal Sensors,
1 Daniel Micheletti Darren Allen Daniel Mazo Jon Lamb Lyle Johnson Pixel Perfect WiCam: A Wireless Digital Camera Presented by : Kyle Swenson.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
CALICE meeting Prague 2007, Hervé MATHEZ 1 DHCAL PCB STUDY for RPC and MicroMegas (Electronics recent developments for the European DHCAL) William TROMEUR,
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
SLHC Strip Tracker Module Envelopes (Tim) WP4 Meeting Glasgow, 13 th June 2011.
EGRE 427 Advanced Digital Design Figures from Application-Specific Integrated Circuits, Michael John Sebastian Smith, Addison Wesley, 1997 Chapter 4 Programmable.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Lessons Learned The Hard Way: FPGA  PCB Integration Challenges Dave Brady & Bruce Riggins.
Module Flex status. 4 types: M4, M2, M1plane, M1mountain. constraint: components and bonding on the same side → folded wing geometry of the flex module.
Presentation for the Exception PCB February 25th 2009 John Coughlan Ready in 2013 European X-Ray Free Electron Laser XFEL DESY Laboratory, Hamburg Next.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
Test setup 07/08/ Components Labview control application I2C communication FPGA firmware IC board 2.
Estimated schedule, costs and number of ABC130 needed Tony Affolder.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Strip Module Working Group Meeting 16 th May 2012 Hybrids A Greenall.
Testing of ABC  Not to scale! 100nF Edge Sensor wired to A9, A10 ? ABC nF NB graphic is not an exact match with “ABC_Pads_V5.2.pdf”
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Two versions went for manufacture – test vehicle for tab and solder resist evaluation Trying to improve planarity of circuits Circuit build is identical.
DCDC for 250nm Stave and ABC130 Hybrid - Revisited.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
ABC130 Hybrid/module and HCC Bond Detail ABC130 Left & Right Handed Hybrid and Module Topology Original proposal – same flavour hybrids Hybrid-module.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
Peter W Phillips Ashley Greenall Matt Warren Bruce Gallop 08/02/2013.
1 ABC130 Module Envelope Envelope set by 2 locations 1.Power end – biggest contribution coming from shield box 2.Data I/O end – set by wire bonding from.
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Module Radiation Length. Goals Estimate the expected radiation length of a module, based on the design and measurements on as-built modules Determine.
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Development of T3Maps adapter boards
IAPP - FTK workshop – Pisa march, 2013
The workflow of module assembly for the CBM Silicon Tracking System
Status of the TPC readout electronics
designing for the Transportation market
Markus Friedl (HEPHY Vienna)
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
AM system Status & Racks/crates issues
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Hans Krüger, University of Bonn
Test Slab Status CALICE ECAL test slab: what is it all about?
SuperB SVT Definition of sensor design and z-side connection scheme
Design and fabrication of Endcap prototype sensors (petalet)
Challenges Implementing Complex Systems with FPGA Components
SALTRO16 activities in Lund
Perugia SuperB Workshop June 16-19, 2009
Updates on the Silicon Tracker 2S Module
Presentation transcript:

Hybrid Activities for ABC130 1

2 Aim to freeze thermo-mechanical layout next week in readiness for submission Will make use of a resistive serpentine trace embedded on inner layer as heating element/ASIC Component layer stays as is Retain bond pad detail and tracking for wire-bond evaluation SMD pads retained – allows tooling and wire-bond evaluation (component clashes etc.) Plan to meet with Roy (& interested parties) to discuss tape layout for thermo-mechanicals Ideally would like tape to have feature detail which is close to that of final object In this instance it will be a SP tape ABC130 Thermo-mechanicals Resistive trace on inner layer for a single asic Trace geometry is 300µm x 18µm x 75mm per asic location Trace resistance per asic is ~225mΩ Total resistance is ~2.5 Ω/hybrid (10 x ABC130 + HCC) Expected Hybrid Power ~2W (excludes sensor contribution of 1W) 5W total/module 2.5V/1A across thermo-mechanical hybrid results in 5W/module 65W/Stave side (65V/1A)

3 Planning for ABC130 Hybrids – without HCC ABC130 and HCC submissions being done sequentially Results in ABC130 arriving ~3(?) months before HCC Will plan for ABC130 evaluation but without HCC First at single chip level – followed by hybrid and then module Important to confirm that ABC130 works as expected when attached to a sensor For hybrid/module evaluation propose using an FPGA in place of HCC FPGA acts as a ‘blank canvas’ – program to suit required configuration First implementation will be as basic I/O buffer Connectivity will match closely that of single chip evaluation board Speeds up evaluation of ASIC(s) on hybrid as DAQ changes should be minimal Then move on to HCC implementation Necessitates changes to DAQ Candidate device identified – Xilinx Spartan 3AN series (XC3S50AN) Comes with integrated config memory, 2 x DCMs, 50 diff I/O, LVCMOS Offers a single chip solution as small as 15mm x 15mm (Fine-Pitch Thin BGA) Impacts upon hybrid layout – not realistic to add FPGA to hybrid Will hook up to FPGA which is mounted external to hybrid ABC130 – HCC connectivity will now be brought to edge of hybrid

4 Planning for ABC130 Hybrids – without HCC Hybrid Comes on pluggable PCB Data I/O To DAQ HCC First tests of HCC come on PCB carrier?