PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING HTTPS://INDICO.CERN.CH/EVENT/459747/ 19 NOVEMBER 2015.

Slides:



Advertisements
Similar presentations
Polish Infrastructure for Supporting Computational Science in the European Research Space EUROPEAN UNION Services and Operations in Polish NGI M. Radecki,
Advertisements

INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo.
“WATER COMMON GOOD FOR ALL” 15th – 16th NOVEMBER 2011, Ouagadougou – Burkina Faso Presented by Eng. Deus Mchele District water Engineer Bahi District Council.
Energy Management System (EnMS) Awareness
02/07/2014R. Guida CERN/PH-DT-DI1 RPC R&D Collaboration PH-DT Topics of Interest Studies of gas systems performance and development of dedicated gas modules.
Achievement for All and Early Support in partnership Kath Alley - Achievement Coach.
Ian Bird WLCG Management Board CERN, 17 th February 2015.
Aajeevika Skills Visioning Workshop Introduction 24 th Feb 2014 National Institute of Rural Development Hyderabad.
GRC Asset Management System Implementation and Integration
Maksim Bashashin PMP (PMI), CPMS (IPMA) Sector Leader JINR – LIT.
National renewable energy policy – results and challenges Estonia Madis Laaniste, Energy Department.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
LIAISON REPORT from CEN/TC 12 G. Trican, Samara, Nov
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
Rotherham Primary Care Trust Derek Stowe IT Infrastructure Manager.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
WHOIS Policy Review Team Interaction with RySG & RrSG.
SLHC Introduction to the “Workshop on Cryogenics and Vacuum Sectorization of the SPL” R. Garoby – 9/11/2009.
DTO WORKSHOP (6 November 2014) J.M. Jimenez and P. Goy1 Project and Feedback.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
PROGRESS OF 5 YEAR HEALTH SECTOR DEVELOPMENT PLAN Department of Planning and Finance, Ministry of Health.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Status Report on the Muon System Alessandro Cardini / INFN Cagliari (with the help of the whole Muon Group)
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
©2007 Dr. Karl Squier 1 Individual Counselors Planning for Results Toolkit 7 Overview.
DESY. Deutsches Elektronensynchrotron Introduction of DESY and MKK group Jens-Peter Jensen Asset and Maintenance Management Workshop 2013 Genf,
25/04/2014R. Guida, A. Wasem PH-DT-DI Gas1 Outline ALICE gas systems meeting Outline Introduction Review usage of ALICE gas M&O 2013 Review achievements.
Information Management Project Status Report March 6, 2007.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Eurostat Report on SDMX Reference Infrastructure User Group 1 st meeting in Luxembourg Sept 2012 Item 5.2 of the agenda November 2012IT Director's.
Project Management December 2008 Department of Planning and Follow-up (DPF) Secretary of Administration and Finance (SAF)
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
New PH-DT website Nefeli Kousi PH-SFT/PH-DT Supervisor: Danilo Piparo PH-SFT.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
News and Introduction from CERN June 15th, 2005
ICE SECTION The coolest place to be! Elias Métral
Energy Management System (EnMS) Awareness
SAMPLE Build a Collaborative Sourcing Process
PH-DT Seasonal Group Meeting 21/1/14
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
June 22, 2017 Burkhard Schmidt for the DT coordination team
Safety in Construction and Upgrade Phases
CMS gas systems meeting
Purchasing supplies at CERN
M. Battistin CERN EN/CV/DC 9th July 2009
Cooling Service and R&D activities
NA61 news and plans News from other labs/experiments
New Reactor Projects as Training Opportunities
Across the entire value chain
WG PoM and Natural water Retention Measures
AMICI WP1 – Management, coordination and dissemination
New EU Forest Strategy Tamas Szedlak AGRI H4
Tasks, Responsibilities Expectations and Needs
Presentation transcript:

PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING 19 NOVEMBER 2015

FLUIDIC SYSTEMS (FS) SECTION MANDATE TO DESIGN, PROTOTYPE, CONSTRUCT, COMMISSION, OPERATE AND MAINTAIN FLUIDIC SYSTEMS (GAS & COOLING) FOR DETECTORS IN CERN EXPERIMENTS. TO PERFORM SELECTIVE R&D IN AREAS RELEVANT TO NOVEL DETECTOR THERMAL MANAGEMENT, GAS SYSTEMS, AND FOR THE UPGRADE OF THE EXISTING SYSTEMS IN VIEW OF HIGHER DETECTOR PERFORMANCES AND SUSTAINABLE OPERATION. 14/10/20152

WELCOME TO EVERYONE! 27 PEOPLE SITTING IN 6 DIFFERENT BUILDINGS 4 FSU CLOSELY INVOLVED WITH MOST OF OUR ACTIVITIES HUGE AMOUNT OF DIVERSIFIED COMPETENCES! 2 PROJECTS  COOLING: P. PETAGNA PROJECT LEADER  GAS: R. GUIDA PROJECT LEADER 19 Nov 2015P. Tropea3

COOLING PROJECT P. PETAGNA 19 Nov 2015P. Tropea4

GAS PROJECT R. GUIDA 19 Nov 2015P. Tropea5

OUR PROJECT CHALLENGES GAS PROJECT ENSURE HIGH STANDARD OPERATION LEVEL FOR THE LHC AND NOT-LHC GAS SYSTEMS MAINTAIN THE CURRENT GAS SYSTEMS’ PERFORMANCE (LHC AND NOT-LHC) DESPITE THEIR NATURAL AGEING DESIGN AND IMPLEMENT ALL THE UPGRADES AND NEW PROJECTS ALLOWING TO FULFILL NEW DETECTOR REQUIREMENTS AND/OR IMPROVE STABILITY/PERFORMANCE REINFORCE GAS SYSTEM R&D PROGRAM FOR REDUCING GAS CONSUMPTION (BUDGET AND ENVIRONMENTAL ISSUES) FOR LARGE EXPERIMENTS AND LABORATORIES COOLING PROJECT DESIGN, BUILD & COMMISSION THE BIGGEST EVER CO2 PLANT FOR PARTICLE DETECTORS: LOT OF R&D NEEDED! DEVELOP AND PROGRESSIVELY IMPLEMENT A 24/7 MAINTENANCE AND OPERATION SUPPORT SERVICE FOR THE PLANTS INSTALLED IN THE EXPERIMENTS CONTINUOUSLY SUPPORT EXPERIMENTS WITH THERMAL MANAGEMENT SOLUTIONS (FROM MICROCHANNELS TO INSTRUMENTATION) 19 Nov 2015P. Tropea6

OUR CHALLENGES – AS A SECTION! OPTIMIZE OUR COMMON INFRASTRUCTURE: WORKSHOP, TOOLS DEFINE AND FOLLOW A POLICY TO HANDLE SPARE PARTS & CONSUMABLES CREATE A UNIFORM APPROACH FOR OUR SERVICE TOWARDS EXPERIMENTS SHARE KNOWLEDGE & TRAINING MY ROLE: MAKE SURE WE CAN ACHIEVE OUR OBJECTIVES IN THE MOST EFFECTIVE WAY, ENSURE YOUR OPINIONS ARE TAKEN INTO ACCOUNT, PASS YOU THE INFO FROM THE GROUP & DEPARTMENT I NEED YOUR COLLABORATION & YOUR INPUTS! 19 Nov 2015P. Tropea7

FIRST GOALS A NUMBER OF CONSTRUCTION PROJECTS AHEAD OF US NEW DEVELOPMENTS (BOTH FOR COOLING & GAS) SERIES OF “KNOWN” MACHINES (3 LUCASZ PLANTS, GAS MODULES, ETC.) 19 Nov 2015P. Tropea8 A (HUGE) NUMBER OF GAS SYSTEMS IN OPERATION FOR PHYSICS SUPPORT TO OPERATION INTERFACE WITH USERS MAINTENANCE

PH-DT XMAS PARTY 11 DECEMBER 2015, 12H00 FS SECTION / PAOLA MOUSSYYee PonPH-DT-FSFELL GIAKOUMIKonstantinaPH-DT-FSFELL SPADAVECCHIANicolaPH-DT-FSTECH MANDELLIBeatricePH-DT-FSFELL OSTREGAMaciej StanislawPH-DT-FSFELL PIMENTEL DAS NEVESTiago FilipePH-DT-FSTRNE SLIWAKrzysztofPH-DT-FSTRNE KOZIOLPiotr JanPH-DT-FSTRNE HELLENSCHMIDTAnnabell DesireePH-DT-FSDOCT KUCZEKTomaszPH-DT-FSCOAS STANISZEWSKAJoannaPH-DT-FSTRNE OKONSKIPawel PiotrPH-DT-FSTRNE VERLAATBartholomeusPH-DT-FSSTAF JASONEKWojciech AdamPH-DTTRNE 19 Nov 2015P. Tropea9 “A performance (singing, speech, costume, game, play an instrument…) is obligatory for all members joining the group or changing status (LD to IC, or Tech to Doct, etc) in the current year. They can group as they wish, by nationality, section, affinity…. and they are expected to perform during the apero time.”

OUTLOOK 1 SECTION MEETING EVERY 2 MONTHS NEXT MEETING FEB 11 TH, 9H00-11H00 WORKSHOP NEEDS SUMMARY & DISCUSSION (PAOLO & ROBERTO WILL NAME A REPORTER FOR THE NEEDS OF THE TWO PROJECTS) DO NOT HESITATE TO PASS BY FOR INFO/SUGGESTIONS! QUESTIONS? THANKS! 19 Nov 2015P. Tropea10