CMS GRPC detector& cassette I. laktineh. Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC.

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

Goals : 1- To conceive and build a self-supporting mechanical structure. 2- The concept can be extended to ILD and SiD 3- Keep cost as low as possible.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing RPC Assembly Changguo Lu, Kirk McDonald, Bill Sands Princeton University (July 28, 2007)
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
HGC4ILD - High Granularity Calorimeters for ILD WS 2-Feb-2015 LLR (Paris) 2-Feb-2015 Enrique Calvo Alamillo.
Glass Resistive Plate Chambers Proof of principle: BELLE Experiment: Virginia Tech (barrel) Tohoku (endcaps) Dan Marlow, Princeton (seminar at Rice), Norm.
1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb Paris, 8 October 2010.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
RPC R&D status in Bucharest (JRA12-I3HP) Mihai Petrovici - CBM-Meeting, GSI, March 1,2006 Short history SMSMGRPC – Glaverbel Glass Prototype –Construction.
Imad Laktineh (in behalf of Enrique Calvo Alamillo) Arlington 11 March 2010.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb International Linear Collider Workshop Beijing,
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
Construction and first commissioning of the self-stretched gas electron multiplier (GEM) detector J. Twigger, V. Bhopatkar, J. Wortman, M. Hohlmann 77th.
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Resistive protections Rui de Oliveira 09/12/15
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
ITEP participation to the CBM TOF project ITEP ALICE - TOF group CBM – Russia meeting at ITEP, Nov 5 th, 2004.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Marcello Abbrescia Muon general meeting, Mon 29-Apr p. 1 R&D on improved RPCs for phase 2 upgrade M. Abbrescia on behalf of the RPC upgrade group.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
R&D ON RESISTIVE TECHNOLOGY FOR MICROMEGAS BUKL STEPHAN AUNE 03/06/2015. S.Aune.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
C. CombaretSept 2007 Thoughts on DHCAL slabs What we need : Around 40 detector plans stacked in 1 meter Large plans : around 2 m x 1 m (70cm x 70cm for.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
RPC Production status for Engineering Module & Detector stack at IICHEP, Madurai Shri. S.D.Kalmani TIFR.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
G. Pugliese Task Preparation for large series production: production protocols of optimised RPC components for easy technology dissemination G.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Imad Laktineh IPN-Lyon On behalf of the CMS muon group
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
GRPC development in Lyon
European DHCAL Meeting 13/06/08
Baby-MIND Modules & Services
New MPGDs at CERN PCB Workshop
Enrique Calvo Alamillo DAEGU
A proposal to equip the high eta muon stations with High Rate GRPC
RPC built a new plastic (peek doped with CB)
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
GRPC activity for EuDHCAL in IHEP-Protvino
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
HPL DG d=1.4mm/e= mm.
Study of Chinese oil-less chamber
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
NPS mechanical design 11/13/2018 Jlab meeting
NPS mechanical design 01/31/2019 Jlab meeting
Presentation transcript:

CMS GRPC detector& cassette I. laktineh

Concepts Two concepts of RE1/1 detectors were developed : 1- One based on gluing glass plates to have large RPC. The cassette in this case is identical to the CMS one 2- One based on building small RPC assembled mechanically to have large one. The small RPC have no walls. The gas tightness is provided by the cassette in this case. We think the second concept is more robust.

Gas-tight cassette concept 3  Two-gap  30 cm x30 cm max. size  Open small chambers&”closed” cassette  Different size of small chambers in the two gaps to eliminate dead zones  Spacer : tiny fishing lines inside PEEK pearls to reduce the loss of efficiency

Mechanical drawing Lateral spacers to keep tight the two gaps and for fishing lines stretching

Small RPC sizes: bottom gap (S. Cauwenbergh)

Small RPC sizes: top gap (S. Cauwenbergh)

Silk screen printing

4,5 ≤ résistivité (M.Ω/ ⃞ )≤ 12 Silk screen printing

Back plate : Alum Cover : Alum Walls : Alum Cassette construction

To ensure gas tightness an O-rings of 0.4 mm compressibility is used

Gas-tight signal transmission connectors

NorComp 48-channel connectors

Pieces to maintain tight the small detectors and to stretch fishing lines are made from Nylon Fixation pieces

Fil Spacers Spacers are made of pieces of hollow PEKK tubes (pearls) with fishing lines of

83 PEEK pearls (Trans Luminal) L = 12 mm, Ext. Diam. 1,2 mm (+0 mm/ -0,02 mm), Int. Diam int 0,5 mm Fishing lines (nylon) : Diam = 0,4 (+0,02/-0)

Conductive Epoxy CW2400 (Chemtronics) + very thin copper tapes for high voltage connection of different glass plates

With the CMS strip PCB

PEEK pearls for the top gap

To ensure tightness and good contact between the gaps and the PCB a (PC) plate with springs was machined and used. 10 mm 2,5 mm 1.Ensemble CH Glass = 3,8 Kg 2.Plaque d’appui en PC = 3,25 kg 3.PCB = 0,3 Kg 4.Mylar inter chambre = 0,2 Kg 5.Capot = 8,9 Kg 6.Surface = 1 m 2 7,55 Kg + 30% sécurité = 9,815 Kg → 96,25 N + 40 % = 10,57 Kg → 103,65 N + 50 % = 11,325 Kg → 111,06 N + 75 % = 13,175 Kg → 129,20 N % = 15,1 Kg → 148,08 N LO : long à vide mm L1 : long en charge 5mm ≤ L1 ≤ 8,5 mm K : raideur N/mm P1 : Pression à L1 12 ressorts : 8,02 N ≤ P1 ≤ 12,34 N Moyenne : 10,18 N Formule : P1= k (L0-L1) kgf = 9, N 12 inox springs

Once the spring plate is put on the two-gap detector the cover is placed and screwed. Final step

Conclusion  First gas-tight cassette with large 2-gap RPC is built and successfully tested  Thickness, material budget and dead zones are to be studied and improved with the new electronics.  Another cassette with the same structure using low- resistivity glass is being built and could be placed in GIF++ in 2016  We would like to work on RE4/1, RE3/1 and RE2/1 mechanical structures in the future.

Fixation pieces