28 th January 2016 LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Safety Management of the LIU Project A. Funken Anne Funken, LIU PT 21/05/15.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
1 1. Some recent views ( ) 2 Linac tunnel
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
STATUS OF THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team March 6, 2012CERN.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
LIU Safety Packages: Kick off Meeting A. Funken, I. Kobzeva BE Safety Unit LIU Safety Packages Kick off Meeting, 30/07/2015.
THE LHC INJECTORS UPGRADE PROJECT - Organisation Malika Meddahi for Roland Garoby and the LIU Project Team.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Essential Consolidation Items for LIU-PSB Collection from LIU-PSB WP holders.
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Safety aspects of LIU Outline: Safety documentation management
LIU / HL-LHC Cost and Schedule Review
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Safety aspects of LIU Outline: Safety documentation management
Linac4-PSB 160 MeV connection readiness review
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
TE-MSC activities in SPS during LS2
EYETS David Hay EN-OSS.
Installation of an Instrument on a CERN machine
Injector De-cabling Project
LIU / HL-LHC Cost and Schedule Review
LIU – EVM status and next steps
LIU–PLI report LIU PSB meeting.
Planning and Installation
EC Activities Status for the LIU
BE-ICS activities for LIU Project
LIU–PLI report LIU SPS meeting.
TE-ABT Activities for LS2
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS activities during LS2 TE-EPC (Power Converter Group)
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Experimental Areas – LS2 planning
East Hall under construction
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. LIU activities during LS2 (including the (E)YETS) Highlight of changes with respect to last year (20 min) 2 Julie COUPARD (EN-ACE) The baseline LIU installation activities corresponding to both ion and proton upgrades will be reviewed to show-up changes approved and/or proposed with respect the 2014 baseline. An advanced draft schedule of LIU activities will be presented, underlining the corresponding support needed from the various CERN groups together with the required technical expertise.

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Outline Status of the preparation of the LIU installations List of activities and draft schedules of LS2 Supports needed Conclusions 3 Long Shutdown Commissioning Operation Technical Stop YETS EYETS *YETS LS2 4 4 Activities independent from the operation (i.e. surface, Linac4…) *Be ready by end of 2016 in the event of possible full linac4 connection

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Status of the preparation of the LIU installations Safety Files 4 Safety Packages (SP) SP Coordinators (SPC)Editors HSE-SEE Correspondents HSE-RP Correspondents Status of the Safety Files LIU new / upgraded equipment onlySF part ISF part IISF part III SF IV (released versions as needed, including conformity certificates) HSE Launch Safety Agreement (LSA) PSB 1PSB Rings (without 1L1 & 15L1)K. HankeI. KobzevaS. MarshR. Froeschl Engineering Check - EDMS May-16Sep-16Dec-15 to Sept-21In Work 2Injection (including 1L1 & 15L1)W. WeteringsI. KobzevaS. MarshR. Froeschl Engineering Check - EDMS May-16Sep-16Dec-15 to Sept-21In Work 3ExtractionJ. BorburghI. KobzevaM. AndreiniR. Froeschl In Work May-16Sep-16Dec-15 to Sept-21In Work 4B245 - POPS BF. BoattiniI. KobzevaS. La MendolaR. FroeschlIn Work - EDMS May-16Sep-16Dec-15 to Sept-21EDMS PS&TT2 1PS RingH. DamereauI. KobzevaD. RioJ. Vollaire Engineering Check - EDMS May-16Sep-16Dec-15 to Sept-21In Work 2InjectionJ. BorburghI. Kobzeva M. Andreini J. Vollaire Engineering Check - EDMS May-16Sep-16Dec-15 to Sept-21In Work 3RF SystemsC. RossiI. KobzevaO.TisonJ. Vollaire Engineering Check - EDMS May-16Sep-16Dec-15 to Sept-21In Work 4PS DumpF.-X. NuiryI. KobzevaS. SchadeggJ. VollaireIn Work -EDMS May-16Sep-16Dec-15 to Sept-21In Work 5TT2 ConsolidationK. PapastergiouI. KobzevaO.TisonJ. Vollaire Engineering Check- EDMS May-16Sep-16Dec-15 to Sept-21 In Work SPS 1SPS Ring & Transfer linesB. GoddardA. Funken LSS4 (MKE4): A. Cunha H. VinckeIn Work EDMS LSS2/4/6: A. CunhaH. Vincke In Work May-16Sep-16Dec-15 to Sept-21 In Work LSS1/3/5: D. FallavierH. VinckeMay-16Sep-16Dec-15 to Sept-21 2SPS Dump UpgradeE. CarlierA. FunkenF. CorsanegoH. VinckeIn WorkMay-16Sep-16Dec-15 to Sept-21 EDMS RF System Upgrades (200MHz and 800 MHz) E. MontesinosA. FunkenO. TisonH. VinckeIn WorkMay-16Sep-16Dec-15 to Sept-21EDMS aC Coating & Impedance reductionP. CruikshankA. FunkenJ. GulleyH. VinckeIn WorkMay-16Sep-16Dec-15 to Sept-21 In Work Ions 1Linac3D. KuchlerA. FunkenD. RioR. FroeschlIn WorkMay-16Sep-16Dec-15 to Sept-21In Work 2LEIRD. ManglunkiI. KobzevaTbdR. FroeschlNot startedMay-16Sep-16Dec-15 to Sept-21Not started 3SPS RF IonsW. HolfeA. FunkenTbdH. VinckeNot startedMay-16Sep-16Dec-15 to Sept-21Not started Courtesy Anne Funken and Lisa Kobzeva Identification of the risks and hazards

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Status of the preparation of the LIU installations Integration studies // Space Reservation and Engineering Change Requests (SRR and ECR) Roadmap for (objectives) 5 LIU-Linac3 Linac4 and LEIR LIU-PS LIU-PSBLIU-SPS Global LIU Project Integration studiesValidation of the ECRInstallation

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 Linac3 and LEIR LIU YETS Upgrade of the Linac3 YETS New external beam dump for LEIR LS2 Replace the bending BVT10 on LBS line Consolidations required for LIU 6 Ref. Richard Scrivens’s talk (session 6) SystemConsolidation itemGroupWhen Approved by CONS? Needed for Cooling/VentilationsCV of Linac3 buildingEN/CVIn LS2YesNeeded to operate the Linac at 10 Hz Beam transferLEIR SEH10 Injection septum LEIRTE/ABT2016NoPS complex operation and reliability/availability issues Beam transferLEIR SMH40 Extraction septum LEIRTE/ABT2016NoPS complex operation and reliability/availability issues Beam transferMagnet KFH31/32/34 + Generator Extraction kicker LEIRTE/ABTin LS2NoPS complex operation and reliability/availability issues Beam transferKFA28 spare magnet Injection Kicker PSTE/ABTin LS2NoPS complex operation and reliability/availability issues Beam instrumentationLEIR Orbit + Trajectory spare monitorsBE/BIin LS2NoPS complex operation and reliability/availability issues MagnetsLEIR spare magnets coilsTE/MSCOngoingYesPS complex operation and reliability/availability issues MagnetsIons lines spare coilsTE/MSCOngoingPartiallyPS complex operation and reliability/availability issues

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 Linac4 New Mid-term and Long-term Schedule of the Linac4 7 completion at 100 MeV completion at 160 MeV Start of the Half sector test Today ready at 50 MeV Ref. Alessandra Lombardi’s talk (session 6) EYETSYETSLS2 HST Spare Be ready by end of 2016 in the event of possible full linac4 connection

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 Connection of the Linac4 Dismantle part of the Linac2 Dismantle the measurement lines LTE and LTL New bending magnet LT.BHZ20 Radioprotection safety aspects Civil engineering works (“chateau”, new wall) Transport & Handling (new chicanes) General safety aspects Civil engineering works (opening wall for emergency exit) New access sectorization New emittance measurement line LBE 8 Pending questions being addressed Complete dismantling of the Linac2 Access strategy for Linac2 area sectorization Cleaning of building 363 (Linac2) general services Approved consolidations of the transfer lines LT, LTB and BI (PS Switch Yard side)

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 Connection of the Linac4 Draft Schedule Connection at 160 MeV H- Co-activities and constraints with the PS Switch Yard schedule 9 Courtesy Aurelio Berjillos

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 PS Booster LIU New injection for Linac4 160 MeV Upgrade to 2 GeV Consolidations required for LIU 10 Be ready by end of 2016 in the event of possible full linac4 connection SystemConsolidation itemGroupWhen Approved by CONS? Needed for Cooling systemsCooling plant replacement / Chilled water plant replacementEN/CVin LS2YesPS Complex operation and HSE issues Ventilation systemsRenovation of ventilation systemEN/CVin LS2YesPS Complex operation and HSE issues Electrical distributionReplacement of ERD16/17/18*25EN/ELin LS2NoPS complex operation and reliability/availability issues Beam stoppersBI and BTP beam stoppers (under study)EN/STIin LS2NoPS complex operation, safety elements (EIS) Vacuum systemsExchange of 12 pumping groups - 4 in BI and BT linesTE/VSCin LS2YesPS complex operation and reliability/availability issues Power converters systems MidiDiscap and MaxiDiscap PCs for LT, LTB and BI linesTE/EPCin LS2YesPS complex operation and reliability/availability issues Power converters systems PC controls renovation (full injectors chain) based on G64 and MIL TE/EPCin LS2YesPS complex operation and reliability/availability issues Magnet systemBT.BHZ10TE/MSCin LS2YesPS complex operation and reliability/availability issues Magnet systemSpare Coils for Injection and extraction main bendsTE/MSCin LS2YesPS complex operation and reliability/availability issues Magnet systemSpare multipolesTE/MSCin LS2YesPS complex operation and reliability/availability issues

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 PS Booster Draft Schedule Notes for EN-EL activities De-cabling = replacement of systems (in addition to the de-cabling project) Only LIU requests 11 Important to make the DEC/DIC/DIF* *DEC/DIC/DIF Demande d’Enlèvements/Installation de Câbles/Fibres Close PSB

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 PS&TT2 LIU Injection energy at 2 GeV Consolidations required for LIU 12 SystemConsolidation itemGroupWhen Approved by CONS? Needed for MHz cavities40-80 MHz Power converters replacementTE/EPCOngoingYesIncrease reliability and voltage available for cavities VacuumReplacement of enamelled FlangesTE/VSCin LS2YesPS complex operation and reliability/availability issues Power convertersFTN power convertersTE/EPCin LS2YesNeeded to avoid hybrid renovation of building Beam transferKFA45 Magnet (modules) GeneratorTE/ABTin LS2YesPS complex operation and reliability/availability issues Beam transferPS extraction kickers KFA71-79TE/ABTin LS2YesPS complex operation and reliability/availability issues Beam stoppers EN/STIin LS2NoPS complex operation and reliability/availability issues HL-RF10 MHz systemBE/RFin LS2YesRF Power upgrade Beam instrumentationTT2 BLMsBE/BILS2NoLoss management and activation Beam instrumentationInjection SEMgridsBE/BIYETS YesInjection optics measurements MagnetsTT2 quadrupoles consolidationTE/MSCin LS2YesPS complex operation and reliability/availability issues MagnetsPole face windingsTE/MSCin LS2YesPS complex operation and reliability/availability issues Cooling systemsTT2 -water cooling stationEN/CVin LS2YesPS Complex operation and HSE issues

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 PS&TT2 Draft Schedule Notes for EN-EL activities De-cabling = replacement of systems (in addition to the de-cabling project) Only LIU requests (some groups did not yet send their requests) 13 Important to make the DEC/DIC/DIF* *DEC/DIC/DIF Demande d’Enlèvements/Installation de Câbles/Fibres Close PS

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 SPS LIU Increase SPS performance HL-LHC - Crab cavity in P6 EYETS large work volumes + coactivity (mainly) in tunnel YETS Installation of large items + Hardware commissioning: Very tight schedule Consolidations required for LIU 14 Ref. Giovanna Vandoni’s talk (session 7) SystemConsolidation itemGroupWhen Approved by CONS? Needed for 800 MHzReplacement of analogue control with digitalBE/RFFor Jan 2016YesBeam control 800 MHz New 1-turn feedback and feed-forward (essential for beam control) in low level BE/RFFor Jan 2016YesBeam control BLMReplace obsolete BLM electronics using new MOPOS fibreBE/BIFor LS2PendingLoss management and activation MKDV switchesReplacement of thyratron/ignitron with GTO switchTE/ABTIn LS2YesNew LSS5 dump ECX5 craneRefurbishment and upgrade of EXC5 crane, CONS partEN/HEIn EYETS/LS2?PartiallyNew LSS5 dump 200 MHz Replacement YL1530 from Richardson being replaced with TH335 from Thales BE/RFIn LS2Yes200 MHz power upgrade Electrical distributionBA3/BB3/BF3 distribution for upgraded 200 MHzEN/ELIn LS2Yes200 MHz power upgrade Electrical distributionECA5/ECX5 distribution for new LSS5 beam dumpEN/ELIn LS2PartiallyNew LSS5 dump Electrical distributionMOPOS crates to move to UPSEN/ELIn LS2PartiallyMOPOS upgrade De-cabling Various de-cabling activities, especially in LSS3 and LSS5, maybe also LSS1 EN/ELThrough LS2YesNew installations

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 SPS Draft Schedule Note for EN-EL activities No request received so far for cabling removal and new cables 15 Close SPS

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 Summary overview of the injectors chain Master Schedule 16 Stop the beam in the PSB 12/11/18 Stop the beam in the PS and SPS 10/12/18 Beam ready for PSB 13/09/20 Beam ready for PS 27/11/20 Beam ready for SPS 21/01/21 LHCPROBE Beam Ready 04/03/21 Linac4 Beam tests To LBE line 01/07/19 Close PSB Close PS Close SPS

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. List of activities and draft schedules of LS2 Summary overview of the injectors chain Master Schedule Objectives to make a linear schedule of the injector chains (like LHC machine) for the EYETS Close collaboration with BE-OP re-commissioning coordinators to schedule the hardware commissioning tests to anticipate within the stops. (ref. IRWG – Injectors re-commissioning Working Group) 17

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Support needed Overview on PLAN activities for LIU Project 18 Ref. Katy Foraz’s talk (session 8)

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Support needed Overview on PLAN contributions requests within the LIU Project 19 All the groups are very involved but we can already identify a huge contribution requests for EN-EL // EN-HE EN-MME // TE-VSC EN-ACE // HSE-RP BE-OP Ref. Katy Foraz’s talk (session 8)

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Conclusions Conclusions from LS2 Day (sept-2015) Some equipment installations have been anticipated to (E)YETS and will require the general services and infrastructure to be performed in the same timeline (EN- CV, EN-EL, EN-HE, EN-MEF, GS-SE, etc…). The groups have to make the corresponding adequate requests, well ahead of time. All equipment groups will be committed to the approved injectors master schedule. The preparation phase need to fit with the installation forecast (studies, procurement, tests etc…) The LIU schedule needs to integrate work from all projects, upgrade and maintenance activities and be presented as the Injectors schedule. All LIU activities need to be entered into PLAN and will be cross-checked with our LIU schedule. In addition Identification of the hazards in progress to take into account in the coordination and scheduling Need to know the definitive list of activities to add in the schedule (i.e. consolidations and safety requirements such as fire risks, asbestos) 20 Still valid In progress Almost complete

21 THANK YOU FOR YOUR ATTENTION

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. References LS2 Day Joint LIU/HL-LHC EDMS – Length of the (E)YETS LIU – Planning and Installation IRWG – Injector Re-commissioning Working Group – last report to IEFC

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Early connection of the Linac4 Different scenarios for the connection of the Linac4 23 Courtesy Aurelio Berjillos