4/5/05FLARE Detector Tank, RLSchmitt1 Detector Tank Description.

Slides:



Advertisements
Similar presentations
Total house building CO 2 emissions Design of a house civil/structural systems wall areas room volumes wall materials foundations framework access roads.
Advertisements

Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Visit Us At Booth #306 J2 Engineering, Inc. J2 provides Construction and Environmental Services and is a verified Service-Disabled Veteran-Owned Small.
Training Support Package
Cold feed to hot water cylinder Sink Basin Bath Drain valve Stop valve WC cistern 100 litre (minimum storage cistern)
NPMA Alan Watson Alexandria May 2012 Tank foundations Presenting
1 Class I Leak Detection Systems - Highest level of monitoring and prevention of double walled tanks and pipes, according EU Standard EN Class.
PREMIX PLANTS. We offer full supply of grinding, dosing and conveying lines, starting with the intake of raw materials, through main storage tanks, grain.
4/5/2005 page 1Dave Pushka PPD review of Flare Flare Liquid Argon Off-Axis Detector – Tank Will It work – Yes! –Tank is 90% identical to the hundreds of.
EQUIPMENT LAYOUT FOR ONSHORE PLANT
LNG in-ground tank March 6 th, 2006 Kajima Corporation.
SHELL HYDROGEN INSTALLATION OVERVIEW The Washington, DC Experience Presented by DCFEMS Office of the Fire Marshal.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
1984 National OSHA Record 6486 accidents. 516 injuries. 90 deaths.
Drums, Vessels, & Storage Tanks Design Considerations.
Base Unit Base Unit: $600 (Call for shipping price) Type: Wood Burning Sauna Stove. Material: ¼” mild steel (Stainless steel available at an additional.
according EU Standard EN
Analysis of Simple Cases in Heat Transfer P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Gaining Experience !!!
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
Skilled Trades 1201 Residential Plumbing.
Painting An LNG Tank Important Processes To Follow! Painting An LNG Tank Important Processes to Follow William Donald Director Of Field Operations Tank.
C F MACHINERY Trade & Services – Import & Export Steel Welded Pipes and Shapes.
LNG Hazards.
Doña Ana Community College Addition Group B: Eric Navarro Jose Nunez Miguel Torres Angel Morales Luis Elias.
 This presentation deals with solar water heaters.  There are two categories (passive, active)  There are two common types (conventional, vacuum tubes);
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Where We Go Wrong In Vessel Design Dick Hawrelak Presented to ES-317Y in 1999 at UWO.
“Design of Water Supply and Sewer Systems” IV. Water Tank (Service Reservoir). Dimensioning and Constructing (Drawing 4) Main Procedures 1. Determination.
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
COMPONENT SELECTION COMPONENT SELECTION PUTTING THE PARTS TOGETHER (SOLDERING) PUTTING THE PARTS TOGETHER (SOLDERING) MAINTENANCE AND REPAIR MAINTENANCE.
Graphic Communication
General meeting LAGUNA LAGUNA – Fréjus site
Detector Cooling Project Thermosiphon Project Status Report
4/5/2005FLARE Cryogenics, RLSchmitt1 Argon Refrigeration Supply Purity.
ACC/Site Safe/DoL Height Safety Seminars June 2009 Auckland Wellington Christchurch.
1. Outline:  Introduction.  Architectural Design.  Structural Design.  Environmental Design.  Mechanical & Electrical Design.  Safety Design. 
GEO-MECHANICS (CE2204) Direct Shear Test Lecture Week No 2 Mdm Nur Syazwani Noor Rodi LINTON UNIVERSITY COLLEGE SCHOOL OF CIVIL ENGINEERING.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
FLARE Constructing the detector First FLARE Workshop November 4-6, 2004 Rafael Silva Fermilab / PPD / MD Fermilab Liquid Argon Experiments.
Application – Identifying, Listing Equipment, and Documentation
SAFETY AND ECONOMIC CONSIDERATIONS To ensure no overflow in treatment tank – Another pipe will be installed on the gutter To ensure continuous supply of.
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
Mine Fresh Air Base.
Working with Resistive Heating Tape.
COOLING BY EVAPORATION OF PERFLUOROCARBONS Why evaporate? 1. To enhance the heat transfer per unit area The heat transfer coefficient increases significantly.
Town of East Greenbush Waste Water Treatment Plant Project Monthly Update – September 2014.
CARGO TANK MOTOR VEHICLES
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
PRESENTATION for future Partners.
Development of The SF6 Circuit Breakers
Pressure Control Philosophy
TCL WATER DISPENSERS 2017.
12 to 100 gallons Simplex or duplex Optional controls package
The LHCb Installation Story
Perforated Casing Pipe. Stainless Steel Perforated Casing.
International Building Materials and components
Progress Report 11/10/11.
Name____________________________ Tutor Group _____
Fire Hose, Nozzles, Streams, and Foam
Perforated Casing Pipe. Stainless Steel Perforated Casing.
Committee on Refinery Equipment
Water Dispensers RRP: 189€ RRP: 169€ TY-LWYR33 RRP: 139€ TY-LYR70
House Construction Budget Plan
Fueling the Future of the Fairbanks North Star Borough
26. Flow Measurement and Safety Devices
DP: € 72 DP: € 95 Tcl Water Dispensers TY-LYR70 TY-LWYR63T/WW
APP-3 CHAMBER Insulation DESIGN PROBLEM
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

4/5/05FLARE Detector Tank, RLSchmitt1 Detector Tank Description

4/5/05FLARE Detector Tank, RLSchmitt2 LNG Storage Many in service Excellent safety record Last failure 1940, inappropriate material

4/5/05FLARE Detector Tank, RLSchmitt3

4/5/05FLARE Detector Tank, RLSchmitt4

4/5/05FLARE Detector Tank, RLSchmitt5 Basic Tank Scope 1) Design, supply of fabricated material and construction of the API 620, Appendix Q double wall tank, complete with insulation, internal piping, normal nozzles and manways. Approximate size of the inner tank is 132' dia.X 96" high. 2) Design is based on single containment with 9% Ni. inner tank and mild steel outer tank. 3) External painting 4) Spiral stairway to the top of the tank, with roof walkways and platforms for access to roof manways and relief valves. 5) Relief Valves 6) Level Gage 7) Ringwall foundation (We assume a pile foundation is not required). 8) Foundation heating Budget price $11 million, +/- 20%, single or double roof. Information from Woody Bliss of CBI, November 2003