1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007.

Slides:



Advertisements
Similar presentations
Fabric Management at CERN BT July 16 th 2002 CERN.ch.
Advertisements

Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
TCP Monitor and Auto Tuner. Need Analysis Enable monitoring of TCP Connections Enable maximum bandwidth utilization No such utility available in MONALISA.
Commissioning & Operation of SOLEIL Jean-Claude Besson – Trieste – WAO 2007 COMMISSIONING & OPERATION OF SOLEIL. J.C. Besson, J.F. Lamarre, A. Bence, X.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
8/21/2015J-PARC1 Data Management Machine / Application State Data.
1 Archiving Workshop (Soleil, May 2010) Archiving System Status.
The Future of TANGO or Quo Vadis TANGO ?. TANGO Future The future can be divided into 2 parts : The Realworld The Dreamworld.
Online Database Support Experiences Diana Bonham, Dennis Box, Anil Kumar, Julie Trumbo, Nelly Stanfield.
Admin Tool June 11, Admin Tool Overview Architecture Implementation Dependencies Futures 2.
CAA/CFA Review | Andrea Laruelo | ESTEC | May CFA Development Status CAA/CFA Review ESTEC, May 19 th 2011 European Space AgencyAndrea Laruelo.
7/2/2003Supervision & Monitoring section1 Supervision & Monitoring Organization and work plan Olof Bärring.
Stanford Linear Accelerator Center November 15, 2000Lee Ann Yasukawa1 Archive Data to ORACLE The Prototype PEPII model.
WordFreak A Language Independent, Extensible Annotation Tool.
TANGO on embedded devices: the Bimorph Mirror application case Fulvio Billè Roberto Borghes, Roberto Pugliese, Lawrence Iviani Instrumentation & Measurement.
VirtualBox What you need to know to build a Virtual Machine.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Elletra’s presentation : December 2003 A quick presentation of TANGO.
Slim Ayadi, Majid Ounsy Tango Meeting Mai Mai 2009 Archiving News.
1 20th March 2007 – Tango Meeting – G.Abeillé ICALEPS 2005 Overview architecture of SOLEIL technical solutions for Beam Lines Control « A control system.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
V.Sirotenko, July Status of Online Databases Currently there are 2 online Oracle Databases running on d0online cluster: 1.Production DB, d0onprd,
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Experiment Management System CSE 423 Aaron Kloc Jordan Harstad Robert Sorensen Robert Trevino Nicolas Tjioe Status Report Presentation Industry Mentor:
Process Architecture Process Architecture - A portion of a program that can run independently of and concurrently with other portions of the program. Some.
5-Oct-051 Tango collaboration status ICALEPCS 2005 Geneva (October 2005)
PerfSONAR-PS Functionality February 11 th 2010, APAN 29 – perfSONAR Workshop Jeff Boote, Assistant Director R&D.
NICA control system, beam diagnostics V.Andreev, E.Gorbachev, A.Kirichenko, D. Monakhov, S. Romanov, G.Sedykh, T. Rukoyatkina, V.Volkov VBLHEP, JINR, Dubna.
Franco Carbognani, EGO LSC-Virgo Meeting May 2007 Status and Plans LIGO-G Z Software Management.
Jan 28, 2005Elizabeth_Gallas D0_Trigger_Database 1 D0 Trigger Database Status Elizabeth Gallas Fermilab CD/D0CA Margherita Vittone, Vijay Murthi, and Steve.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Réunion Contrôle Expérience 28/03/ Experiments Controls Vision, ideas, tasks to begin with … Alain Buteau Andy Götz.
1 Tango Meeting (Hamburg, September 2007) Archiving System Deployed at Soleil.
By Douglas Copas and Mark Perry.  Currently available small business based commercial inventory management systems are either prohibitively expensive.
With TANGO S. Poirier – Data management group.
1 Tango Meeting (Elettra, December 2004) Tango Archiving Service What’s new ?
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
MPD Slow Control System historical background, present status and plans D.S. Egorov, R.V. Nagdasev, V.B. Shutov V.B.Shutov /21.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
R. Krempaska, October, 2013 Wir schaffen Wissen – heute für morgen Controls Security at PSI Current Status R. Krempaska, A. Bertrand, C. Higgs, R. Kapeller,
1 COMETE Roadmap – M.Ounsy COMETE Status. 2 COMETE Roadmap – M.Ounsy  Reminder: Comete & ATK Software architecture  Migration status from ATK to Comete.
Accounting in DataGrid HLR software demo Andrea Guarise Milano, September 11, 2001.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
XML 2002 Annotation Management in an XML CMS A Case Study.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
HDB and TDB archiving at MAXlab Y.A.Gaponov, K.Larsson, P.Goryl, A.G.Persson.
TFS / Teamprise for J2EE Development Groups Month 00, 0000 Mac Noland Configuration Management Engineer Saturday, July 02, 2016.
Sergi Rubio Manrique “Archiving System at ALBA”. Tango Meeting. ALBA. October 16 th, MMVIII 1 Archiving ALBA Sergi Rubio Manrique.
LabVIEW Core I with RADE introduction EN/ICE/MTA.
Tango Meeting Grenoble September 5/ Claudio Scafuri, Elettra ELETTRA Status Claudio Scafuri
Overview of TANGO Control system
Archiving development at MAXlab
Presented by Li Gang Accelerator Control Group
FCT and CERN Portuguese Trainee Programme Report
Status and Plans for InCA
Archiving System News Tango Meeting (Elettra, April 2008)
Software Tango Meeting - May 2011 N. Leclercq on behalf of the SOLEIL Computing Team.
Status report SOLEIL May 2009
PLC-based control systems at SOLEIL - ICALEPCS 2017
Archiving System Deployed at Soleil
                                                                       TANGO Collaboration Experience for running a multi-site international software project.
External Collaboration
The EPICS running envirionments in the five accelerator projects
Tango in a Nutshell 31/12/2018.
State of progress Eurostat web site 3 Dissemination WG 29 April 2004
Tango SOLEIL 24/02/2019 G. Abeillé - SOLEIL.
G. Abeillé, A.Buteau, N.Leclercq : SOLEIL
High Level applications development status
Anant Mudambi, U. Virginia
Presentation transcript:

1 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Status report SOLEIL September 2007

2 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Accelerator status Accelerator is now in routine operation Beam is now mainly produced for beamlines There is only 2 day/week for Machine tests since last spring We also have to face short periods of time (about 1 week) for maintenance between runs

3 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005  274h 40; 55%  11h 57; 2%  178h 08; 36%  33h 41; 7% Machine Physics Machine+BL time Beamline RadioProtection Beam statistics during July Run

4 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 BEAMLINES; 02h 28 UTILITIES; 02h 00 OTHER; 01h 59 VACCUUM; 03h 14 LINAC; 00h 18 ID; 00h 21 PS; 00:41 RF; 00:55 RF PSupplies LINAC Insertions Vaccuum Beamlines UTILITIES OTHER Statistics of failures during July Run Tango is not in the statistics !!

5 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Accelerator status : Control facts Software development are still significant for : Insertions devices installation and commissioning Slow and feedforward feedbacks Major Machine operation requests are focused on : Enhancements and bug fixes on DeviceServers, ATK, Archiving systems, starter, statical database, global supervision of Control system Remote access a few applications (MAMBO for instance) through WEB interfaces New Linux Servers have to be installed to support the increase of monitoring applications (trends,alarms,etc.)

6 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Accelerators : next steps  Recovery procedures are to be written for many systems  Architecture for Oracle Database must be extended for HDB and TDB new requirements  More attributes to be stored  Extension of retention period of attributes for TDB  New diagnostics, insertions, and operation tools are still to be developped

7 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Tango facts Last meeting, in March Now in september

8 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Beamlines status  10 beamlines are now beeing commissioned DIFFABS TEMPO ODE SAMBA DESIRS CASSIOPEE PROXIMA SWING SMIS MARS First beam on the MARS beamline

9 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Tango facts on beamlines SWING beamline PROXIMA beamline 12 Tango Control System in operation More than 3000 devices

10 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 Next steps on beamlines  On the major part of the beamlines software installation (i.e DeviceServers, java applications) for « Expert Users » is almost finished First sequence acquisitions have been done We are now preparing the « Regular operation phase » :  GUI acquisition application development  High level process DeviceServers development  Still a difficult period