Closing Report IEEE Media Independent Handover Services Session #23 Atlanta, Georgia Vivek Gupta
2 Agenda Accomplishments Comment Resolution Update Teleconference update Study Group Updates Future Locations
3 Accomplishments Resolved all comments in Sponsor Ballot Updated Draft D8.0 to be produced by Editor SB Recirculation to be initiated before Dec-15 Study Group Extensions approved by 802 EC Security Study Group Multi-Radio Power Conservation Management SG WG Approved ad hoc meeting in February 2008
4 Revised Timeline (July 2007) IEEE ECSG formed – March 2003 IEEE WG formed – March 2004 Requirements development – September 2004 Call for Proposals – October 2004 Harmonized Single Proposal Confirmed by the WG – May 2005 Ongoing WG Comment Resolution started – July 2005 WG Comment Resolution completed – January 2006 Start of WG Letter Ballot – March 2006 Start of IEEE 802 Sponsor Ballot –(July-07) IEEE 802 Draft Standard sent to RevCom – March 2008 Ongoing Interaction with Other Standards Organization (3GPP, 3GPP2, IETF, , , 802.3) - adoption of it depends on the timeline of work items within these groups
5 SB Comment Resolution Progress SectionStart #End #Resolved #Total Comments Annex Total: 650 Comments Includes Editorials (Total: 127) Many Duplicate comments ~100
6 Teleconferences Dec 13: 9 AM EST: MRPM SG Dec-18 : 9 AM EST: Security SG SB Comments: Jan 8: 9 AM EST
7 Study Group Reports
8 Security SG - Accomplishments Two meeting slots: Nov. 17 (Mon) AM2, Nov. 15 (Thu) PM2 4 TR (Technical Report) contributions All contributions address Security Signaling Optimization during Handover (SSOH) One contribution also addresses MIH-level Security Mechanism (MIHS) One contribution for performance evaluation on SSOH One contribution for combining security signaling and QoS resource reservation Discussed PAR and 5C issues There will be 2 nd call for TR contributions before Jan-08 meeting Details available at Securty_SG_Report.ppt Securty_SG_Report.ppt
9 Security SG Milestones November 2007 All contributions intended to be included in the TR need to be submitted before the meeting Detailed submission guidelines will be posted to the reflector PAR/5C discussion January 2008 All major studies are expected to be done PAR/5C discussion February 2008 Submit PAR/5C to IEEE 802 EC to create a TG March 2008 Completion of TR Discuss feedback on PAR/5C Joint Meeting with Link Security Task Group
10 Multi-Radio PM SG – Accomplishments Two meeting slots: Nov. 13 (Tue) AM1, Nov. 15 (Thu) PM1 Officers Chair: Behcet Sarikaya Editor: Behcet Sarikaya Secretary: Junghoon Jee Technical contributions Policy issues: policy engine at the paging controller on when to page the mobile, etc. Measurements on various platforms on sleep/idle mode, powered off states and returning back to idle state WiMAX chips sets, Cellular chip sets Draft 5C Detailed Report available at MRPM_SG_ClosingReport.ppt MRPM_SG_ClosingReport.ppt
11 Multi-Radio PM SG – Timeline Next steps Teleconference in December Thu. Dec. 13, details to be announced January 2008 All major studies are expected to be done PAR/5C discussion and approval at the Interim February 2008 Submit PAR/5C to IEEE 802 EC to create a TG by Feb. 14, 2008 March 2008 Completion of TR Approval of PAR/5C by EC PAR Submission to IEEE-SA Standards Board
12 Future Sessions
13 Future Sessions Interim: Jan 13 th – 18 th, 2008 (Taipei, Howard Plaza Hotel ) Meeting co-located with all 802 groups Plenary: March 16 th – 21st,2008, Orlando, Florida Co-located with all 802 groups Interim: May 11 th – 16 th, 2008 (Jacksonville) Meeting co-located with /15/18/19/20/22 Plenary: July 13 th – 18 th,2008, Denver, Colorado Co-located with all 802 groups Interim: Sept 7 th – 12 th,2008, (Big Island, Hawaii) Meeting co-located with /15/18/19/20/22 Plenary: Nov 9 th – 14 th,2008, D allas, TX Co-located with all 802 groups
14 Future Sessions Interim: Jan ???? Meeting co-located with /15/18/19/20/22 Plenary: March Rome/Vancouver??? Co-located with all 802 groups Interim: May ???? Meeting co-located with /15/18/19/20/22 Plenary: July ???? Co-located with all 802 groups Interim: Sept ???? Meeting co-located with /15/18/19/20/22 Plenary: Nov ???? Co-located with all 802 groups