TOTEM Roman Pot Upgrade Project Pots design, tests and timeline production CERN 11 July 2013 D.Druzhkin (NIKIET, Moscow, Russia) 1 & 20th LTEX Meeting.

Slides:



Advertisements
Similar presentations
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
Advertisements

NEW DESIGN FOR RF FINGERS C. Garion 5 June, 2012TE-VSC1 Acknowledgements to A. Lacroix and H. Rambeau for materials and help.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Progress on the MICE 201 MHz Cavity Design Steve Virostek Lawrence Berkeley National Lab RF Working Group Fermilab August 22, 2007  automatic.
Non-welded Window Option Edgar L. Black IIT August 15,2003.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Vacuum, Surfaces & Coatings Group Technology Department Glassy Carbon Tests at HiRadMat 14 March 2014 C. Garion2 Outline: Introduction Context: Transparent.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Gueorgui ANTCHEVNEC’2013 – Varna, Bulgaria 1 The TOTEM Experiment Consolidation and Upgrade G. Antchev * On behalf of the TOTEM Collaboration * INRNE-BAS,
The First 1 ½ Years of TOTEM Roman Pot Operation at the LHC M. Deile, G. Antchev, I. Atanassov, V. Avati, J. Baechler, K. Eggert, J. Kašpar, F. Lucas Rodriguez,
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Forward physics pertinent ECRs Mike Lamont, Samy Chemli.
HAMBURG BEAM PIPE POSSIBLE LAYOUT AND MANUFACTURING JANUARY 2012.
ALCPG11-Peterson1 Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
1 Tehniline ülevaade uusimast füüsikast CERN’is Endel Lippmaa 20. Detsember 2006, TTÜ.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Alice overview New detector and chamber ALICE TC.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Impedance of the TOTEM Roman Pots Nicola Minafra, Benoit Salvant, Nicolò Biancacci, …
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
2 nd PH-DT Training Seminar CERN TODAY An introduction to rapid prototyping techniques by C.Bault, PH-DT-EO NEXT on 3 th October at 11:00 Overview.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
AFP-HPS /03/ D. D. INFN To/CERN PH UCM HPS240. Integration of Moving Beam Pipe and detector box. 1. Re-collection Layout of moving beam pipe.
Gennaro Ruggiero CERN, PH Depart. Planar Edgeless Detectors for the TOTEM Experiment On the behalf of the TOTEM Collaboration
The integration of 420 m detectors into the LHC
LHC forward detectors EN/MEF roles & responsibilities MEF group meeting, 24 th November 2010 A. L. Perrot- EN/MEF-LE.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Introduction to mechanical design of the SPES RFQ Ferrari Luigi, Technical Review, 09/21/15 Design review, 09/21/20151.
Sergio Calatroni TS/MMETS Workshop, Archamps RF Fingers for Secondary Collimators What is that? Constraints for design Choice of materials:
ATLAS Forward Proton Detectors ATLAS Forward Proton Detectors Michael Rijssenbeek for the ATLAS Collaboration Physics summary: Physics withSingle and Double.
Engineering Design of Raon SC Cavities Myung Ook Hyun SCL Team Myung Ook Hyun SCL Team.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Vacuum System P. Chiggiato TE-VSC
Jaak Lippmaa HIP, Helsinki University
LBNF CAD models, Drawings and Component list
Preliminary analysis for the dressed LHC RF cavity (2) April 28th 2016 – EDMS L. Dassa, L. Mettler.
new straw end plug: D=10.6 mm straws support frame Levan option
The Budker Institute of Nuclear Physics
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
PANDA Yoke of the Magnet
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Preliminary Y-chamber specifications – First draft
SILICON PIXELS DETECTOR
Design of Distribution Feedbox at LHC P7
Discussion on the TDI impedance specifications
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Status of CMS-PPS timing detectors
Possible positions for automatic wear compensation
BGC Collaboration Meeting –
Presentation transcript:

TOTEM Roman Pot Upgrade Project Pots design, tests and timeline production CERN 11 July 2013 D.Druzhkin (NIKIET, Moscow, Russia) 1 & 20th LTEX Meeting

New Roman Pot station with one horizontal Pot Timing detectors based on QUARTIC L-bars LSS Outgoing beam Roman Pot station with two horizontal Pots Upgrade proposal for LS1 1. Horizontal Roman Pot a) mech. Structure – VACUUM PRAHA sr.o (present design & safety); b) housing – CERN (new design); c) timing detector. 2.Frame – VACUUM PRAHA sr.o (modified design) 3.Support plate – CERN (present design) 4.Bellows – CERN (Standard BP bellows 300mm) Horizontal Roman Pot Frame Support plate Bellows

PP (as for RP 147m) Layout in the tunnel (LSS ~216m from IP5)

Roman Pot Vacuum chamber Timing detector LHC vacuum chamber Bellows LHC vacuum chamber Roman Pot Housing Timing detector inside Roman Pot Housing 1bar pressure load Ferrite ring Ø195/162x5

5x5 QUARTIC L-bars 3x3mm Placement of Timing detector in the Housing and in the RP vacuum chamber

First prototype Placement of Timing detector in the Housing and in the RP vacuum chamber housing RP vacuum chamber

10σ position

Garage position

10σ position

Placement of Timing detector in the Housing and in the RP vacuum chamber NEG coating (?)

New (cylindrical) housing design

The design and technology of PROTOTYPE are adjusted; the material is ordered for 4 PROTOTYPE housings (for follow-up inspection and tests); expected date of performance ~ august D. Perini and F. Bertinelli.

For produced housing the following tests are planned: 1) Geometry verification (flatness of windows; surface roughness; tolerances, …); 2) Strength structural tests for 1 bar; deflection measurement; cycles loading test; 3) Gas permeability (diffusion through the window material); 4) Mechanical tests in assembly with the Roman Pot (moving test, safety mech., compensation mech., stoppers, and the like). Adjustment and tuning. 10um copper (?)

316LN (20˚C) Σ 0.2 = 607 MPa; Σ U = 812 MPa; E = 193 GPa. Stress; Inner pressure 1 bar Thin window 0.3mm Stress; Outer pressure 1 bar Crush test (as for present rectangular housing)

316LN (20˚C) Σ 0.2 = 607 MPa; Σ U = 812 MPa; E = 193 GPa. Thin window 0.2mm Inner pressure 1 bar Guillaume Maitrejean simulation taking into account cyclical load