NMP / EO-1 NMP EO-1 LE&O HANDBOOK 1 - 1 September 24-26, 2000 Section 1 Master Timeline (Day 1-10)

Slides:



Advertisements
Similar presentations
EIS/Solar-B: 3. Electrical Interface to MDP EISMDP PIM HK PIM DHU DR analog data (temperature, current, etc.) S/C bus image compression status data command.
Advertisements

Lightning Imager and its Level 2 products Jochen Grandell Remote Sensing and Products Division.
M100 M100 Overview Preparation & Testing. M100 Overview  The M100 is a computerized tabulator that optically reads then counts and totals specially designed.
® IBM Software Group © 2010 IBM Corporation What’s New in Profiling & Code Coverage RAD V8 April 21, 2011 Kathy Chan
Superior Solar Conjunction Planning May 8, 2014 Dan Ossing STEREO Mission Operations Manager (240)
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
PHEOS PSRR Concept of Operations. 2 Scope The purpose of the PCW-UVI Concept of Operations (ConOps) is to communicate how mission systems will operate,
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
AAE450 Senior Spacecraft Design Dorrie Byford Week 1: January 18 th, 2007 Communications Group Leader / Autonomous Rendezvous Team Member / Website Designer.
GOES-8 to GOES-12 Transition Direct Readout Conference Cindy Hampton NESDIS/Office of Satellite Operations.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
COMPUTER MANAGEMENT. System start-up Before switching on a computer, make sure that all the components are properly connected. The computer must be connected.
5 - 1 June 4, 2002 Earth Observing-1 GSFC Systems Engineering Seminar: EO-1 Results Section 5 Spacecraft Technologies.
5 Space Technology “Paving the Way for Future Micro-Satellite Missions” 1 NASA’s Space Technology 5 Mission NSF workshop on Small Satellite Missions for.
Launching, Orbital Effects & Satellite Subsystems
Initial Early Orbit Checkout (IOC) Review
AMSAT Fox-1 Overview AMSAT Engineering Team 2011 Space Symposium.
CBPM System Overview (Part I?) 19 September 2012Beam Instrumentation Meeting1.
XYZ 9/11/2015 MIT Lincoln Laboratory ALI Solar Calibration Aperture Selector Failure Overview J. A. Mendenhall Tiger Team Findings Brief to NASA/GSFC.
ISUAL Long Functional Test H. Heetderks. TRR December, 20012NCKU UCB Tohoku ISUAL Long Functional Test Heetderks Basic DPU Function Verify Power on Reset.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
Solar-B Launch Operations Scenarios ISAS/JAXA Solar-B project Prepared by T. Shimizu For Wallops face-to-face meeting.
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
An Overview of the Recent HST Safings An Overview of the Recent HST Safings Ken Sembach TIPS Presentation September 20, 2007.
MG 1/10/01 1 PCS SMOV-3B Review Objectives Overview Activity Descriptions Requirements.
NMP EO-1 TECHNOLOGY WORKSHOP Section 9 Spacecraft Technologies u Wideband Advanced Recorder / Processor (WARP) u X-Band Phased Array Antenna.
CHIPSat Cosmic Hot Interstellar Plasma Spectrometer Spacecraft Julius-Maximilians-Universität Würzburg S: Telematik in der Raumfahrt Prof. Dr. Schilling.
Page 1 of 35 Achieving Over-The-Horizon Requirements Using Low Earth Orbit Satellites (LEOS) Presented by Eric Saikin.
Dr. Aprille Ericsson Eric Stoneking June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Attitude Control Systems.
LRO Mission Concept of Operations Summary Version 1.0 (Preliminary) April
The Handy Board Bryan Valentini General Robotics 2003.
C osmic R Ay T elescope for the E ffects of R adiation CRaTER Pre-Environmental Review (I-PER) Environmental Test Planing Bob Goeke September 10-11, 2008.
Final Version Dick Bolt Code 302 May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Success.
THEMIS FDMO CDR Peer Review − L&EO and Normal Operations 1June 1-2, 2004 L&EO and Normal Operations Manfred Bester.
START NICMOS COOLING SYSTEM ACTIVITY SUMMARY. 1/25/01Ken Pulkkinen2 START NCS ACTIVITY Applicable SMOV Requirements: J NICMOS Cooling System.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
Flight Software Overview
PPI-8255.
Telemetry Constraints during Early Operations The STEREO telemetry rate is restricted during the phasing orbits due to S/C RF interference with each other,
Final Version Kequan Luu May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Flight Software.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
Hardware, 010 – Revision notes Scales use Controller board O/Ps for Feed Control (FCE’s) Flow meters use their own on board O/Ps for Feed Control (FCE’s)
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
Spacecraft Systems Henry Heetderks Space Sciences Laboratory, UCB.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
Section 19.1 Mission Operations Steve Odendahl Honeywell Technology Solutions, Inc. 5 Space Technology “Tomorrow’s Technology Today” GSFC ST5 PDR June.
TRIO-CINEMA 1 UCB, 2/08/2010 Mission Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
From you host … Dr. H. Introduction In the present project, communications design forces us to think about the overall arrangement of the system and its.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
National Aeronautics and Space Administration Attitude and Pointing Concepts for ISS Payload Operations NASA/JSC Marcella Mendoza Attitude & Pointing Office.
TRIO-CINEMA 1 UCB, 2/08/2010 FSW & Operations Winter Summary Seyoung Yoon KHU EE Team.
00:00:00 Standby 3.0L.
CINEMA System Engineering
Data Utilization Reset
GLAST Large Area Telescope:
SDO Flight Dynamics Subsystem
LRO Mission Operations Concept
Launch and On-orbit Checkout
CubeSat vs. Science Instrument Complexity
Solar and Lunar Eclipses
LAT Operations Scenario Subsystem Meetings
Instrument Commissioning SDO SOWG - January 18-19, 2007 Purpose/Goal:
Charles Sommer October 21st, 2019
Presentation transcript:

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Section 1 Master Timeline (Day 1-10)

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day-By-Day Key Activities Description... Joe Howard

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 1 u Launch –Fairing Separation u First Acquisition through TDRSS at 2k from ATS Non_Coherent –Test Command through TDRSS u AOS McMurdo –Test Command through McMurdo u LOS McMurdo ATS goes to TDRSS –Separation From Launch Vehicle into B-dot Mode –Solar Array Deployment u AOS Norway at 2k Send Command to switch rate to 32K –Switch to ATS Buffer B –Playback SSR Launch Data –Close Data Set I u Monitor B-dot u Orbit 3 –Drop off TDRSS coverage but keep transponder on and configured between GN passes u Orbit 4 –Verify sun pointing acquisition –Turn on ALI outgas heater –Turn on IRU heater –Turn on AST –Turn on GPS u Orbit 6 –Allow ACS to use Kalman filter if converged u Night Orbits –Check TDRS 4,6,8 Kbps telemetry

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 2 u Orbit 12 –Update M5 time if needed u Orbit 14 –Move Solar Array 10 deg off index –Start ACE Safehold –Monitor safehold control u Orbit 16 –Exit safehold –Turn back on IRU heaters –Turn back on AST power –Turn back on GPS power –Turn back on ALI outgas heater –Use Kalman filter u Orbit 17 –Acquire Earth pointing mode u Orbit 18 –Use GPS for timing in M5

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 3 u Orbit 20 –Load ATS –Turn off Slew control for safety u Orbit 28 –Enable slew logic u Orbit 29 –Pitch Slew out Settle 15 minutes and return (Execute from ATS)(TDRSS) u Orbit 31 –Yaw Slew out and back (from ATS)(TDRSS) u Orbit 32 –Roll Slew out and back (from ATS)(TDRSS) u Orbit 34 –Enable EFF in Monitor mode

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 4 u Orbit 45 –Turn on X-band RSN –Turn on X-band RF without WARP RF exciter –Playback S-band WARP RS422 data u Orbit 46 –Dump WARP files X-band (Norway and SGS overlap) u Orbit 49 –Re-dump WARP X-band data (Wallops) u Orbit 50 –WARP Memory test u Orbit 37 –Load ATS u Orbit 41 –Update any Power parameters –Turn off ALI radiator heaters –Allow DeltaV logic to execute u Orbit 42 –Monitor 60 second thruster burn from ATS (over Wallops) u Orbit 43 –Turn back on the ALI rad heaters u Orbit 44 –Turn on WARP and format memory –RS-422 test

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 5 u Orbit 60 –Enable RTSs for ALI cover opening DCE via ATS u Orbit 61 –One 8 second and two 30 sec DCE execution out of ATS (out of view) –Move cover to outgas position –Turn Heaters on to outgassing mode –Turn on Radiator Heaters u Orbit 62 –S-band dump of 8 sec DCE –Another 30 sec DCE via ATS u Orbit 64 –X-band dump of all ALI data u Orbit 52 –Load ATS u Orbit 55 –Turn on ALI –Turn off ALI radiator heaters u Orbit 56 –ALI comprehensive test u Orbit 57 –8 second ALI lamp cal –S-band WARP replay –30 second test pattern ALI data collect u Orbit 58 –X-band WARP playback u Orbit 59 Release Launch Latch for ALI Cover Release Launch Latch for ALI Diffuser Open ALI Cover Close ALI Cover

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 6 u Orbit 76 –AC Dark Earth image at TEC 1 for S- band downlink u Orbit 77 –AC image at TEC 1 for S-band downlink u Orbit 78 –AC Dark Earth image at TEC 1 for X- band downlink u Orbit 79 –AC image at TEC 1 for X-band downlink –Test TDRSS pass at 4 Kbps u Orbit 80 –Test TDRSS pass at 6 Kbps u Orbit 82 –Test TDRSS pass at 8 Kbps u Orbit 83 –Load ATS –X-band playback of AC data u Orbit 66 –Load ATS u Orbit 70 –Close ALI cover –Turn off ALI radiator heater u Orbit 71 –Increase FDC limits in prep for Delta V –Allow for Delta V to execute u Orbit 72 –Monitor 13 minute Delta V via ATS (TDRSS scheduled as needed) u Orbit 73 –Reset FDC limits u Orbit 74 –Re-open ALI cover –Re-turn on ALI radiator heaters u Orbit 75 –Turn on ALI

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 7 u Orbit 84 –Power on Hyperion –Release WARP files with AC data u Orbit 85 –Test ASPs –Test HYP Lamps u Orbit 86 –HYP short internal cal u Orbit 87 –HYP Cryo static drive test –S-band playback of short cal u Orbit 88 –HYP heater test u Orbit 89 –Heaters back to normal u Orbit 90 –Cover open full –Cover open to sun cal position –cover close

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 8 u Orbit 92 –Load ATS u Orbit 99 –HYP full length cal u Orbit 100 –Close ALI cover –Turn off ALI radiator heater –X-band dump of Hyperion data –Allow for Delta V to go u Orbit 101 –12 min Delta V from ATS u Orbit 103 –Open ALI cover –Turn on ALI radiator heater –Release Launch Latches on LFSA –Deploy LFSA u Orbit 104 –Another full length Hyperion cal u Orbit 107 –X-band playback of Hyperion data to Wallops

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 9 u Orbit 109 –Load ATS u Orbit 114 –Close ALI cover –Turn off ALI radiator heater –Allow for Delta V to execute –Monitor 9 minutes Delta V u Orbit 115 –Return ACS to 60 second burn limit u Orbit 116 –Open ALI cover –Turn on ALI radiator heater u Orbit 117 –HYP Cryo check start u Orbit 118 –HYP Cryo check stop u Orbit 119 –Hyperion heaters on for outgassing

NMP / EO-1 NMP EO-1 LE&O HANDBOOK September 24-26, 2000 Day 10 u Orbit 121 –Load ATS u Orbit 129 –All instrument DCE (Procedure or ATS) u Orbit 130 –X-band downlink (Alaska) u Orbit 131 –X-band downlink (Wallops) u Orbit 132 –All instrument short DCE u Orbit 133 –S-band dump of short DCE