Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication Complete for SN1 à Simulation Work.

Slides:



Advertisements
Similar presentations
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
Advertisements

Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
1 Team M1 Enigma Machine Milestone March, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Zavo Gabriel (M13) Mike Sokolsky (M14) Design Manager:
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Slide 1 Control Software for the CMS Pixel Readout 28 April 2004 R.Stone, Rutgers (J.Doroshenko, DW.Kim, U.Joshi, L.Perera, J.C. Yun, et al) CMS Pixel.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Automation of the 805MHz cavity conditioning procedure Ajit Kurup MuCool Test Area RF Workshop, Fermilab 22 nd August 2007.
Helicopter Data Acquisition System ECE 4522 Senior Design II.
Eye Detector Project Midterm Review John Robertson Roy Nguyen.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Development of a 20 GS/s Sampling Chip in 130nm CMOS Technology Jean-Francois Genat On behalf of Mircea Bogdan 1, Henry J. Frisch 1, Herve Grabas 3, Mary.
Implementing LabVIEW in an Intermediate Physics Laboratory Steven Sahyun Physics Department, University of Wisconsin - Whitewater, Whitewater, Wisconsin.
Physics 145 Introduction to Experimental Physics I Instructor: Karine Chesnel Office: N319 ESC Tel: Office hours: on appointment.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Mark Raymond /10/051 Trip-t testing brief status report test setup description - hardware and software some very early results.
Low Cost Infrared Touch Screen Bezel for POS Systems Rohan Verma, Jeremy Taylor, Freddie Dunn III Georgia Institute of Technology School of Electrical.
e-learning in Electronics
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Status of Detector Prototype (for Hawaii meeting at Big Island) August 24, 2002 Yee Bob Hsiung For Koji Ueno, Yuri Velikzhanin Yanan Guo and Eddie Huang.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Napoli October 2007 WG3 - Pierre Edelbruck FAZIA WG3 – Front End Electronics.
Miguel Contreras IME 458 – Advanced Microelectronics and Electronic Packaging Spring 2014 Infrared Sensitive Lights (ISL)
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
“Magic Rainbow” Music Visualizer The Colors of Sound Group Jamaal Merriweather Justin McDevitt Weston Bell Robert A. Hicks II Georgia Institute of Technology.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
SPEED RACE BY LEARNING ON THE WHEEL How to make the hardware.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
USB Project Ian Coulter. USB Interface USB Menu -Download HEX File -Send Trigger -Start DAQ.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Bottom half – ch 0-5 placed & routed FE PS PROC FIFO TRIG OSC RX/SHAP ADC DAC VME.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
Wind Turbine Energy Conversion System Design and Integration
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication/ Test –Gate Generator (Jimmy) à Synchronized.
May E906 Work and Status TDC readout – One full TDC board, 4 ECL cables/modules KTEV UCLA LV PS – Thanks Dave N.! – +/- 5V, 18A each – Spade /10-12AWG.
CDMS II Shielding To Installation To Construction From Design.
May 5, 2004Slide 2 OmnAuto TMS Solution May 5, 2004Slide 3 OmnAuto TMS Dataflow.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
全面推开营业税改征 增值税试点政策培训. 什么是营改增? “营改增”中的“营”指的是营业税,“ 增”指的是增值税。对大多数企业来说,增 值税所带来的税负远低于营业税。 减税本身就是积极的财政政策。营改增所 实现的减税,不仅规模大、范围广,它本质 上是一种“结构性减税”,从而构成“结构 性改革”攻坚战中的实招。
Spanggaard BE-BI-EA(1)EA Lectures February, 2016 Introduction to Beam Instrumentation (in the Experimental Areas of the SPS, the PS and the AD)  EA -
1 Status Report on ADC LPC Clermont-Ferrand Laurent ROYER, Samuel MANEN Calice/Eudet electronic meeting London 2008.
Electronics and DAQ status Frontend - covers – Preparation of the final cover version and production Design finished Mounting of RJ45 verified using selective.
Intro to USB-6009 DAQ.
Monitoring system commissioning
ETD meeting Electronic design for the barrel : Front end chip and TDC
CMS EMU TRIGGER ELECTRONICS
Status of the EUDET Prototype
Data Acquisition (DAQ)
Presentation transcript:

Slide 1 UCSB CDMS Group Neutron Trigger

Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication Complete for SN1 à Simulation Work Continues à Waiting for in-system testing à New Trigger Enable Input added

Slide 3 UCSB CDMS Group Neutron Trigger SN1 Final NIM Prototype Module Package USB Control NIM Trigger In Global Trigger Out Test Trigger In Status Lamps à Trigger à Live Trigger Enable (in rear)

Slide 4 UCSB CDMS Group Hardware Trigger Enable DAQ Dead Time reduction à LabView 16hz à A/D is 30hz alone New DAQ A/D End of Conversion as input à Low,High to Low à CMOS à Must drop low to allow next global trigger

Slide 5 UCSB CDMS Group LabView VI Panel

Slide 6 UCSB CDMS Group Future Plans Continue Trigger Simulation à Optimize Dead Time à Uncover design flaws Complete Schematic for SN2 à PC Layout à Clean NIM Module Package Design new LED Pulser à USB Control of light level à Attempt to achieve very fast pulse

Slide 7 UCSB CDMS Group USB LED Pulser