MANAGEMENT of INFORMATION SECURITY Second Edition.

Slides:



Advertisements
Similar presentations
Identifying and Responding to Security Incidents in the Law Firm
Advertisements

Introduction Creation of information security program begins with creation and/or review of organization’s information security policies, standards,
1 Continuity Planning for transportation agencies.
Business Continuity Planning (BCP) & Disaster Recovery Planning (DRP)
Business Continuity Planning and Disaster Recovery Planning
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Management of Information Security Chapter 3 Planning for Contingencies Things which you do not hope happen more frequently than things which you do.
Principles of Incident Response and Disaster Recovery
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
Lesson 13-Intrusion Detection. Overview Define the types of Intrusion Detection Systems (IDS). Set up an IDS. Manage an IDS. Understand intrusion prevention.
Planning for Contingencies
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
CSE 4482: Computer Security Management: Assessment and Forensics
Planning for Contingencies
Computer Security: Principles and Practice
Disaster Recovery and Business Continuity Ensuring Member Service in Times of Crisis.
Session 3 – Information Security Policies
Network security policy: best practices
1 Business Continuity. 2 Continuity strategy Business impact Incident response Disaster recovery Business continuity.
Planning for Continuity
Contingency Planning Things which you do not hope happen more frequently than things which you do hope. -- PLAUTUS. (C. 254–184 B.C.), MOSTELLARIA, ACT.
FIREWALLS & NETWORK SECURITY with Intrusion Detection and VPNs, 2nd ed. 12 Contingency Planning By Whitman, Mattord, & Austin © 2008 Course Technology.
ITC358 ICT Management and Information Security
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
Security Baseline. Definition A preliminary assessment of a newly implemented system Serves as a starting point to measure changes in configurations and.
Planning for Contingencies
INFORMATION SECURITY PLANNING & IMPLEMENTATION Today’s Reference: Whitman & Mattord, Management of Information Security, 2 nd edition, 2008 Chapter 3.
Planning for Contingencies
ISA 562 Internet Security Theory & Practice
Asset & Security Management Chapter 9. IT Asset Management (ITAM) Is the process of tracking information about technology assets through the entire asset.
Rich Archer Partner, Risk Advisory Services KPMG LLP Auditing Business Continuity Plans.
How Hospitals Protect Your Health Information. Your Health Information Privacy Rights You can ask to see or get a copy of your medical record and other.
Disaster Recovery & Business Continuity
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Business Continuity and Disaster Recovery Planning.
Principles of Incident Response and Disaster Recovery
INCIDENT RESPONSE IMPLEMENTATION David Basham University of Advancing Technology Professor: Robert Chubbuck NTS435.
Developing Plans and Procedures
Lesson 9-Information Security Best Practices. Overview Understanding administrative security. Security project plans. Understanding technical security.
Disaster Recovery and Business Continuity Planning.
INFORMATION SECURITY MANAGEMENT L ECTURE 3: P LANNING FOR C ONTINGENCIES You got to be careful if you don’t know where you’re going, because you might.
INFORMATION SECURITY MANAGEMENT L ECTURE 3: P LANNING FOR C ONTINGENCIES You got to be careful if you don’t know where you’re going, because you might.
Contingency Planning.
Phases of BCP The BCP process can be divided into the following life cycle phases: Creation of a business continuity and disaster recovery policy. Business.
TEL2813/IS2820 Security Management
SecSDLC Chapter 2.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Principles of Incident Response and Disaster Recovery Chapter 8 Disaster Recovery: Operation and Maintenance.
Role Of Network IDS in Network Perimeter Defense.
Business Continuity Disaster Planning
Dr. Mark Gaynor, Dr. Feliciano Yu, Bryan Duepner.
CBIZ RISK & ADVISORY SERVICES BUSINESS CONTINUITY PLANNING Developing a Readiness Strategy that Mitigates Risk and is Actionable and Easy to Implement.
MANAGING INCIDENT RESPONSE By: Ben Holmquist. 2 Outline Key Terms and Understanding Personnel and Plan Preparation Incident Detection Incident Response.
Disaster Recovery Planning (DRP) DRP: The definition of business processes, their infrastructure supports and tolerances to interruptions, and formulation.
Security Methods and Practice Principles of Information Security, Fourth Edition CET4884 Planning for Security Ch5 Part II.
Contingency Planning. Objectives Upon completion of this material, you should be able to: –Recognize the need for contingency planning –Describe the major.
Information Security Crisis Management Daryl Goodwin.
Contingency Management Indiana University of Pennsylvania John P. Draganosky.
Business Continuity Planning 101
Business Continuity Steven S. Keleman, CPM. Emergency Management Prevention Response Preparation Mitigation Recovery.
Computer Security: Principles and Practice First Edition by William Stallings and Lawrie Brown Lecture slides by Lawrie Brown Chapter 17 – IT Security.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
INFORMATION SECURITY MANAGEMENT L ECTURE 3: P LANNING FOR C ONTINGENCIES You got to be careful if you don’t know where you’re going, because you might.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition
CompTIA Security+ Study Guide (SY0-401)
MANAGEMENT of INFORMATION SECURITY, Fifth Edition
CompTIA Security+ Study Guide (SY0-501)
MANAGEMENT of INFORMATION SECURITY Second Edition.
Presentation transcript:

MANAGEMENT of INFORMATION SECURITY Second Edition

Management of Information Security, 2nd ed. - Chapter 3 Slide 2 Learning Objectives  Upon completion of this material, you should be able to: –Understand the need for contingency planning –Know the major components of contingency planning –Create a simple set of contingency plans, using Business Impact Analysis –Prepare and execute a test of contingency plans –Understand the combined contingency plan approach

Management of Information Security, 2nd ed. - Chapter 3 Slide 3 Introduction  This chapter focuses on planning for the unexpected event, when the use of technology is disrupted and business operations come close to a standstill  Procedures are required that will permit the organization to continue essential functions if information technology support is interrupted  Over 40% of businesses that don't have a disaster plan go out of business after a major loss

Management of Information Security, 2nd ed. - Chapter 3 Slide 4 What Is Contingency Planning?  The overall planning for unexpected events is called contingency planning (CP)  It is how organizational planners position their organizations to prepare for, detect, react to, and recover from events that threaten the security of information resources and assets  The main goal is the restoration to normal modes of operation with minimum cost and disruption to normal business activities after an unexpected event

Management of Information Security, 2nd ed. - Chapter 3 Slide 5 CP Components  Incident response planning (IRP) focuses on immediate response  Disaster recovery planning (DRP) focuses on restoring operations at the primary site after disasters occur  Business continuity planning (BCP) facilitates establishment of operations at an alternate site

CP Components (continued)  To ensure continuity across all of the CP processes during the planning process, contingency planners should: –Identify the mission- or business-critical functions –Identify the resources that support the critical functions –Anticipate potential contingencies or disasters –Select contingency planning strategies –Implement selected strategy –Test and revise contingency plans Management of Information Security, 2nd ed. - Chapter 3 Slide 6

Management of Information Security, 2nd ed. - Chapter 3 Slide 7 CP Operations  Four teams are involved in contingency planning and contingency operations: –The CP team –The incident recovery (IR) team –The disaster recovery (DR) team –The business continuity plan (BC) team

Management of Information Security, 2nd ed. - Chapter 3 Slide 8 Putting a Contingency Plan Together  The CP team should include: –Champion –Project Manager –Team Members Business managers Information technology managers Information security managers

Management of Information Security, 2nd ed. - Chapter 3 Slide 9 Contingency Planning  NIST describes the need for this type of planning as: “These procedures (contingency plans, business interruption plans, and continuity of operations plans) should be coordinated with the backup, contingency, and recovery plans of any general support systems, including networks used by the application. The contingency plans should ensure that interfacing systems are identified and contingency/disaster planning coordinated.”

Management of Information Security, 2nd ed. - Chapter 3 Slide 10 Figure 3-1 Components of Contingency Planning

Management of Information Security, 2nd ed. - Chapter 3 Slide 11 Business Impact Analysis (BIA)  Provides the CP team with information about systems and the threats they face  First phase in the CP process  A crucial component of the initial planning stages  Provides detailed scenarios of the impact each potential attack can have

Management of Information Security, 2nd ed. - Chapter 3 Slide 12 Figure 3-2 Major Tasks in Contingency Planning

Management of Information Security, 2nd ed. - Chapter 3 Slide 13 Business Impact Analysis (BIA) (continued)  BIA provides information about systems and threats and provides detailed scenarios for each potential attack  BIA is not risk management, which focuses on identifying threats, vulnerabilities, and attacks to determine controls  BIA assumes controls have been bypassed or are ineffective, and attack was successful

Management of Information Security, 2nd ed. - Chapter 3 Slide 14 Business Impact Analysis (BIA) (continued)  The CP team conducts the BIA in the following stages: 1.Threat attack identification 2.Business unit analysis 3.Attack success scenarios 4.Potential damage assessment 5.Subordinate plan classification

Management of Information Security, 2nd ed. - Chapter 3 Slide 15 Threat/Attack Identification and Prioritization  An organization that uses a risk management process will have identified and prioritized threats  These organizations update threat list and add one additional piece of information: the attack profile  An attack profile is a detailed description of activities that occur during an attack

Management of Information Security, 2nd ed. - Chapter 3 Slide 16 Table 3-1 Example Attack Profile

Management of Information Security, 2nd ed. - Chapter 3 Slide 17 Business Unit Analysis  The second major BIA task is the analysis and prioritization of business functions within the organization

Management of Information Security, 2nd ed. - Chapter 3 Slide 18 Attack Success Scenario Development  Next create a series of scenarios depicting impact of successful attack on each functional area  Attack profiles should include scenarios depicting typical attack including: –Methodology –Indicators –Broad consequences  More details are added including alternate outcomes—best, worst, and most likely

Management of Information Security, 2nd ed. - Chapter 3 Slide 19 Potential Damage Assessment  From detailed scenarios, the BIA planning team must estimate the cost of the best, worst, and most likely outcomes by preparing an attack scenario end case  This will allow identification of what must be done to recover from each possible case

Management of Information Security, 2nd ed. - Chapter 3 Slide 20 Subordinate Plan Classification  Once the potential damage has been assessed, and each scenario and attack scenario end case has been evaluated, a related plan must be developed or identified from among existing plans already in place  Each attack scenario end case is categorized as disastrous or not  Attack end cases that are disastrous find members of the organization waiting out the attack, and planning to recover after it is over

Management of Information Security, 2nd ed. - Chapter 3 Slide 21 Incident Response Plan  The IRP is a detailed set of processes and procedures that anticipate, detect, and mitigate the impact of an unexpected event that might compromise information resources and assets  Incident response (IR) is a set of procedures that commence when an incident is detected

Management of Information Security, 2nd ed. - Chapter 3 Slide 22 Incident Response Plan (continued)  When a threat becomes a valid attack, it is classified as an information security incident if: –It is directed against information assets –It has a realistic chance of success –It threatens the confidentiality, integrity, or availability of information assets  It is important to understand that IR is a reactive measure, not a preventative one

Management of Information Security, 2nd ed. - Chapter 3 Slide 23 During the Incident  Planners develop and document the procedures that must be performed during the incident  These procedures are grouped and assigned to various roles  The planning committee drafts a set of function- specific procedures

Management of Information Security, 2nd ed. - Chapter 3 Slide 24 After the Incident  Once the procedures for handling an incident are drafted, planners develop and document the procedures that must be performed immediately after the incident has ceased  Separate functional areas may develop different procedures

Management of Information Security, 2nd ed. - Chapter 3 Slide 25 Before the Incident  Planners draft a third set of procedures, those tasks that must be performed in advance of the incident  These procedures include: –Details of data backup schedules –Disaster recovery preparation –Training schedules –Testing plans –Copies of service agreements –Business continuity plans

Management of Information Security, 2nd ed. - Chapter 3 Slide 26 Figure 3-3 Incident Response Planning

Management of Information Security, 2nd ed. - Chapter 3 Slide 27 Preparing to Plan  Planning requires a detailed understanding of the information systems and the threats they face  The IR planning team seeks to develop predefined responses that guide users through the steps needed to respond to an incident  Predefining incident responses enables rapid reaction without confusion or wasted time and effort

Management of Information Security, 2nd ed. - Chapter 3 Slide 28 Preparing to Plan (continued)  The IR team consists of professionals capable of handling the information systems and functional areas affected by an incident  Each member of the IR team must know his or her specific role, work in concert with each other, and execute the objectives of the IRP

Management of Information Security, 2nd ed. - Chapter 3 Slide 29 Incident Detection  The challenge is determining whether an event is routine system use or an actual incident  Incident classification is the process of examining a possible incident and determining whether or not it constitutes an actual incident  Initial reports from end users, intrusion detection systems, host- and network-based virus detection software, and systems administrators are all ways to track and detect incident candidates  Careful training allows everyone to relay vital information to the IR team

Management of Information Security, 2nd ed. - Chapter 3 Slide 30 Incident Indicators: Possible Indicators  Presence of unfamiliar files  Presence or execution of unknown programs or processes  Unusual consumption of computing resources  Unusual system crashes

Management of Information Security, 2nd ed. - Chapter 3 Slide 31 Incident Indicators: Probable Indicators  Activities at unexpected times  Presence of new accounts  Reported attacks  Notification from IDS

Management of Information Security, 2nd ed. - Chapter 3 Slide 32 Incident Indicators: Definite Indicators  Use of dormant accounts  Changes to logs  Presence of hacker tools  Notifications by partner or peer  Notification by hacker

Management of Information Security, 2nd ed. - Chapter 3 Slide 33 Occurrences of Actual Incidents  Loss of availability  Loss of integrity  Loss of confidentiality  Violation of policy  Violation of law

Management of Information Security, 2nd ed. - Chapter 3 Slide 34 Incident Response  Once an actual incident has been confirmed and properly classified, the IR team moves from the detection phase to the reaction phase  In the incident response phase, a number of action steps taken by the IR team and others must occur quickly and may occur concurrently  These steps include notification of key personnel, the assignment of tasks, and documentation of the incident

Management of Information Security, 2nd ed. - Chapter 3 Slide 35 Notification of Key Personnel  As soon as an incident is declared, the right people must be immediately notified in the right order  An alert roster is a document containing contact information on the individuals to be notified in the event of an actual incident either sequentially or hierarchically  The alert message is a scripted description of the incident  Other key personnel must also be notified of the incident only after the incident has been confirmed, but before media or other external sources learn of it

Management of Information Security, 2nd ed. - Chapter 3 Slide 36 Documenting an Incident  As soon as an incident has been confirmed and the notification process is underway, the team should begin documentation  It should record the who, what, when, where, why, and how of each action taken while the incident is occurring  It serves as a case study after the fact to determine if the right actions were taken, and if they were effective  It can also prove the organization did everything possible to deter the spread of the incident

Management of Information Security, 2nd ed. - Chapter 3 Slide 37 Incident Containment Strategies  The essential task of IR is to stop the incident or contain its impact  Incident containment strategies focus on two tasks: –Stopping the incident –Recovering control of the systems

Management of Information Security, 2nd ed. - Chapter 3 Slide 38 Incident Containment Strategies (continued)  Disconnect the affected communication circuits  Dynamically apply filtering rules to limit certain types of network access  Disable compromised user accounts  Reconfigure firewalls to block the problem traffic  Temporarily disable the compromised process or service  Take down the conduit application or server  Stop all computers and network devices

Management of Information Security, 2nd ed. - Chapter 3 Slide 39 Incident Escalation  An incident may increase in scope or severity to the point that the IRP cannot adequately contain the incident  Each organization will have to determine, during the business impact analysis, the point at which the incident becomes a disaster  The organization must also document when to involve outside response

Management of Information Security, 2nd ed. - Chapter 3 Slide 40 Initiating Incident Recovery  Once the incident has been contained, and system control regained, incident recovery can begin  The IR team must assess the full extent of the damage in order to determine what must be done to restore the systems  The immediate determination of the scope of the breach of confidentiality, integrity, and availability of information and information assets is called incident damage assessment  Those who document the damage must be trained to collect and preserve evidence, in case the incident is part of a crime or results in a civil action

Management of Information Security, 2nd ed. - Chapter 3 Slide 41 Incident Recovery  Once the extent of the damage has been determined, the recovery process begins –Identify and resolve the vulnerabilities that allowed the incident to occur and spread –Address the safeguards that failed to stop or limit the incident, or were missing from the system in the first place, and install, replace, or upgrade them –Evaluate monitoring capabilities (if present) to improve detection and reporting methods, or install new monitoring capabilities

Management of Information Security, 2nd ed. - Chapter 3 Slide 42 Incident Recovery (continued) –Restore the data from backups as needed –Restore the services and processes in use where compromised (and interrupted) services and processes must be examined, cleaned, and then restored –Continuously monitor the system –Restore the confidence of the members of the organization’s communities of interest

Management of Information Security, 2nd ed. - Chapter 3 Slide 43 After Action Review  Before returning to routine duties, the IR team must conduct an after-action review, or AAR  The after-action review is a detailed examination of the events that occurred  All team members review their actions during the incident and identify areas where the IR plan worked, didn’t work, or should improve

Management of Information Security, 2nd ed. - Chapter 3 Slide 44 Law Enforcement Involvement  When an incident violates civil or criminal law, it is the organization’s responsibility to notify the proper authorities  Selecting the appropriate law enforcement agency depends on the type of crime committed: federal, state, or local

Law Enforcement Involvement (continued)  Involving law enforcement has both advantages and disadvantages –They are usually much better equipped at processing evidence, obtaining statements from witnesses, and building legal cases –However, involvement can result in loss of control of the chain of events following an incident Management of Information Security, 2nd ed. - Chapter 3 Slide 45

Management of Information Security, 2nd ed. - Chapter 3 Slide 46 Disaster Recovery  Disaster recovery planning (DRP) is the preparation for and recovery from a disaster, whether natural or man made  In general, an incident is a disaster when: –The organization is unable to contain or control the impact of an incident –The level of damage or destruction from an incident is so severe the organization is unable to quickly recover  The key role of a DRP is defining how to reestablish operations at the location where the organization is usually located

Management of Information Security, 2nd ed. - Chapter 3 Slide 47 Disaster Classifications  A DRP can classify disasters in a number of ways  The most common method is to separate natural disasters from man-made disasters  Another way of classifying disasters is by speed of development –Rapid onset disasters –Slow onset disasters

Management of Information Security, 2nd ed. - Chapter 3 Slide 48 Planning for Disaster  Scenario development and impact analysis are used to categorize the level of threat of each potential disaster  DRP must be tested regularly

Planning for Disaster (continued)  Key points in the DRP –Clear delegation of roles and responsibilities –Execution of the alert roster and notification of key personnel –Clear establishment of priorities –Documentation of the disaster –Action steps to mitigate the impact –Alternative implementations for the various systems components Management of Information Security, 2nd ed. - Chapter 3 Slide 49

Management of Information Security, 2nd ed. - Chapter 3 Slide 50 Crisis Management  Crisis management is a set of focused steps that deal primarily with the people involved taken during and after a disaster  The crisis management team manages the event: –Supporting personnel and their loved ones during the crisis –Determining the event's impact on normal business operations –When necessary, making a disaster declaration –Keeping the public informed about the event –Communicating with outside parties

Crisis Management (continued)  Two key tasks of the crisis management team are: –Verifying personnel status –Activating the alert roster Management of Information Security, 2nd ed. - Chapter 3 Slide 51

Management of Information Security, 2nd ed. - Chapter 3 Slide 52 Responding to the Disaster  Actual events often outstrip even the best of plans  To be prepared, DRP should be flexible  If physical facilities are intact, begin restoration there  If organization’s facilities are unusable, take alternative actions  When disaster threatens the organization at the primary site, DRP becomes BCP

Management of Information Security, 2nd ed. - Chapter 3 Slide 53 Business Continuity Planning (BCP)  BCP ensures critical business functions can continue in a disaster  BCP most properly managed by CEO of organization  BCP is activated and executed concurrently with the DRP when needed  While BCP reestablishes critical functions at alternate site, DRP focuses on reestablishment at the primary site  BCP relies on identification of critical business functions and the resources to support them

Management of Information Security, 2nd ed. - Chapter 3 Slide 54 Continuity Strategies  Several continuity strategies for business continuity, determining factor is usually cost  Three exclusive-use options: –Hot sites –Warm sites –Cold sites  Three shared-use options: –Timeshare –Service bureaus –Mutual agreements

Management of Information Security, 2nd ed. - Chapter 3 Slide 55 Exclusive Use Options  Hot sites –Fully configured computer facility with all services  Warm sites –Like hot site, but software applications not kept fully prepared  Cold sites –Only rudimentary services and facilities kept in readiness

Management of Information Security, 2nd ed. - Chapter 3 Slide 56 Shared Use Options  Timeshares –Like an exclusive use site but leased  Service bureaus –Agency that provides physical facilities  Mutual agreements –Contract between two organizations to assist  Specialized alternatives –Rolling mobile site –Externally stored resources

Management of Information Security, 2nd ed. - Chapter 3 Slide 57 Off-Site Disaster Data Storage  To get any BCP site running quickly, organization must be able to recover data  Options include: –Electronic vaulting - bulk batch-transfer of data to an off-site facility –Remote Journaling - transfer of live transactions to an off-site facility –Database shadowing - storage of duplicate online transaction data

Management of Information Security, 2nd ed. - Chapter 3 Slide 58 Figure 3-4 Incident Response and Disaster Recovery

Management of Information Security, 2nd ed. - Chapter 3 Slide 59 Figure 3-5 Disaster Recovery and Business Continuity Planning

Management of Information Security, 2nd ed. - Chapter 3 Slide 60 Figure 3-6 Contingency Plan Implementation Timeline

Management of Information Security, 2nd ed. - Chapter 3 Slide 61 Business Resumption Planning  Because the DRP and BCP are closely related, most organizations prepare them concurrently, and may combine them into a single document, the business resumption plan (BRP)  Although a single planning team can develop the BRP, execution requires separate teams

Management of Information Security, 2nd ed. - Chapter 3 Slide 62 Table 3-3 Contingency Plan Template

Management of Information Security, 2nd ed. - Chapter 3 Slide 63 Table 3-3 Contingency Plan Template (continued)

Management of Information Security, 2nd ed. - Chapter 3 Slide 64 Table 3-3 Contingency Plan Template (continued)

Management of Information Security, 2nd ed. - Chapter 3 Slide 65 Sample Disaster Recovery Plan 1.Name of agency 2.Date of completion or update of the plan and test date 3.Agency staff to be called in the event of a disaster 4.Emergency services to be called (if needed) in event of a disaster

Sample Disaster Recovery Plan (continued) 5.Locations of in-house emergency equipment and supplies 6.Sources of off-site equipment and supplies 7.Salvage priority list 8.Agency disaster recovery procedures 9.Follow-up assessment Management of Information Security, 2nd ed. - Chapter 3 Slide 66

Management of Information Security, 2nd ed. - Chapter 3 Slide 67 Testing Contingency Plans  Once problems are identified during the testing process, improvements can be made, and the resulting plan can be relied on in times of need  There are five testing strategies that can be used to test contingency plans: –Desk check –Structured walkthrough –Simulation –Parallel testing –Full interruption

Management of Information Security, 2nd ed. - Chapter 3 Slide 68 Final Thoughts on Continuous Improvement  Iteration results in improvement  A formal implementation of this methodology is a process known as continuous process improvement (CPI)  Each time the plan is rehearsed it should be improved  Constant evaluation and improvement leads to an improved outcome

Management of Information Security, 2nd ed. - Chapter 3 Slide 69 Summary  Introduction  What Is Contingency Planning?  Components of Contingency Planning  Putting a Contingency Plan Together  Testing Contingency Plans  A Single Continuity Plan