PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Technical Support /13/08 PHENIX WEEKLY PLANNING 11/13/2008 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
Technical Support /12/08 PHENIX WEEKLY PLANNING 6/12/2008 Don Lynch.
1 1/22/2009 PHENIX WEEKLY PLANNING 1/22/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
Technical Support /11/08 PHENIX WEEKLY PLANNING 12/11/2008 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
Technical Support /21/08 PHENIX WEEKLY PLANNING 8/21/2008 Don Lynch.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
Technical Support /30/08 PHENIX WEEKLY PLANNING 10/30/2008 Don Lynch.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 12/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Technical Support /26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
Technical Support /18/08 PHENIX WEEKLY PLANNING 12/30/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch

Technical Support /28/08 Shutdown ’08 Schedule RPC Factory: Dark Current test standin design due 9/30 Mu Trigger FEE upgrade: Station 2/3 scaffoldingDone Station 1 scaffoldingDone Rack assemblyinstall in North by 8/30, South by 9/30 LV cable prepDone Optical cable prepDone N&S platforms Fabricate & installfabrication complete, North platform is installed, install South by 9/30 (Pearson) Rebuild Bridge & EyebrowComplete by 9/30 Prep work for platforms (water/elec)in progress finish by 8/30 LV cable installationDone optical cable installationDone FEE installation N&S sta’s. 1,2 & 3Station 1 & 2N Done, Sta 3N by 9/15, Sta. 1,2 & 3S by 10/31

Technical Support /28/08 Shutdown ’08 Schedule Mu Trigger FEE Upgrade (cont’d): FEE water and dry air installationStarted finish by 9/30 Install S rack cooling & electricOct.after CM moves north Install FEE’s in MMS for RPC testOct.after CM moves north Rack room electronics, etc.Sep.– Oct. Disassemble station1 scaffoldcomplete by Oct 15 Testing Sep.-Nov. Complete by 11/15 RPC internal reviewSep. RPC proptotype installation: Prep workwait for final installation design move (7) MuID pipes move gap 5 south cable tray Rack prepIn progress complete by Sep 30 RPC prototype gas systemIn progress complete by Sep 30 Move shielding for installationJuly - Sep [Pearson] RPC prototype cable routing & supportAug - Sep Modify crystal palace & vapor barrierJuly – Sep [Pearson] RPC prototype install (RPC2 – PHENIX) Sep. – Oct. (RPC3 – C. Pearson) Sep. - Oct.

Technical Support /28/08 Shutdown ’08 Schedule, cont’d RPC proptotype installation (cont’d): Install rack in tunnel southInstall by 9/30 Replace tunnel shielding/Vapor BarrierNov. [Pearson] Connect electronics/gas Sep. – Nov. MuTr Decapacitations (Sta. 1 N and MMN)North: (Station 1 and 3) done Mike Leitch will be back 9/8/08 Fan Tray maintenancein progress (on going fill-in) PC1 west work (needs planning)Oct. 15 CM Crane Install[postponed indefinitely?] HBD InstallOct. 27 DC East?/West RepairsNov. 15 Remove all inst’n equipment Sta 1 (from south)Remove by 1/15 Sta 2/3 scaffoldsRemove by 11/15 all other testing equipmentRemove by 12/1 Prep for shutdown 2009 Gap 5 N piping and cable tray re-loc.Oct. - Dec Gap 2 N cable tray & crate re-mountsOct. – Dec.

Technical Support /28/08 Shutdown ’08 Schedule, cont’d Prep for run 9 Begin run 9 Prep12/1/09 Install all lampshadesComplete by 11/26 Roll in EC12/22 Pink/White/Blue sheets12/29 Close shield wall 12/31 Cryo Start up1/1/09 Flammable Gas/start shifts 1/11/09 Start physics1/18/09 End Run 96/30/09 Other Work VTX prototype design supportdone, for now NCC prototype design supportIn progress finish in Sep HBD supportas required VTX fabrication tooling designSep – Oct VTX installation designOct - Nov FVTX design/engineering supportas required

Technical Support /28/08 1) Run Power to new MuTrgr FEE racks on MMN and MMS - Final design of the reworked North Muon Power Distribution System is set. Nearly all material acquired eithout cost. Paul is m revising the One-Line electrical drawing. CAD approval required…maybe by next week. Effort should take ~ 1 week. The new power cable feed to the MuTrigger rack is installed (2 cables, 1 spare) with no connection to the panel down below. The new North side power panel is installed on the IR North east corner wall. The new 75 KVA transformer for the entire North Arm service is reconditioned and tested satisfactory. The power for the South RPC tunnel Rack(s) to be taken from an existing (spare) breaker in the Muon Tracker power panel. This should take less than 1 day to install. NO CHANGE 2) Install power feeds to RPC north & south tunnel racks from IR power panels. – Plan is to run the cables from the IR to the North tunnel rack locations. The south RPC rack power can be taken from the existing (spare) breakers in the SMI power panel located on the IR south west wall. These cable runs may take a few days to complete due to new power tray runs required into the tunnel areas. Not done due to lack of manpower – working on other higher priority items. Shutdown ’08 Electrician Work

Technical Support /28/08 Shutdown ’08 Electrician Work, Cont’d. 3) Install new UPS in Gas mixing house. Not done due to lack of manpower – working on other higher priority items. 4) Install power and signal cable tray (ceiling suspended) for new DCM rack row – north of existing DCM racks. - on Hold until new floor plan is determined 5) Assist in signal and LV cable installation for MuTr/RPC upgrades as necessary. Work in progress – Optical and LV cables installed. LV cables (rack end) are coiled on platform deck next to LV rack mount location. Optical patch rack installed with some cables connected into rack. Work on LV rack continues – not expected to be completed until later next week. 6) Upgrade power capacity of Central Magnet power distribution for future bridge rack loads. a) Remove existing 15KVA transformer and install 45KVA unit. b) Install new (larger size) power cable from rack room to Central Magnet distribution breaker panels. - This job is on hold. No new racks in CM this year. 7) Install 120 volt AC power drops into new control room annunciator alarm rack (rack room). Not done due to lack of manpower – working on other higher priority items. 8) Ordering parts for South MuTrigger LV rack. Rack plumbing complete. Internal wiring to start maybe end of next week. 9) Discussions started with Chi and Steve Boose concerning RPC prototype rack for south tunnel.

Technical Support /28/08 New FEE Platforms & Modified Bridge Parts Mike Leitch needs access to eyebrow by 9/8 Install new South MuTrggr FEE rack platform by ??

Technical Support /28/08 MuTrgr FEE South Rack Ready to be installed

Technical Support /28/08 MuTrigger FEE Rack Utilities

Technical Support /28/08 MuTrigger FEE Installation Prep

8/28/0812 MuTr FEE upgrade status Tsutomu Mibe (KEK) for the onsite upgrade team 12

8/28/0813 Chassis Status Chassis Mount Status: – Decided engineering design for Station-1 Bottom Octant (Carter) – Waiting for balcony to access Station-3 Top Octant. – All other chassis were mounted. Water plumbing Status: – John T. (full) & Mike Lenz (30%) + Yuta Sada (support) – Completed Station 2 Oct. 5, 4, 3, 2, 1, 8 – ~5 chassis/day, Takes 4 weeks(?) – All MuTr power locked out during plumbing work. Delaying MuTr calibration/noise study...

8/28/0814 LV Status Station-1 Cables are all installed. New cable supports and guides are mounted by Carter LV Rack Construction is completed by Frank. LV Rack was moved to platform. Distributor Boards are waiting for front panels. LV cables will be cut and connected to LV rack by Frank + Itaru, Murakami, Sada LV control GUI -> Steve

8/28/0815 Optical Cable Station-1 optical cables are installed. Completed chain test. All OK. Two dead trunk cables -> Connectors will be replaced by Frank. Tools are to be ordered 5 more trunk cables to be delivered this Friday Install trunk cables (4 North, 1 South) next week - >Continue Chain test Waiting for beam clock distributor boards.

8/28/0816 Signal cables 200 FEE-ADTX cables are waiting for installation. Need MuTr calibration measurements Planning on working in the evenings and holiday (Sep 1 st ) 109 more cables to come on Sep 8 th. 16

8/28/0817 ADTX board Mass production is ongoing. 20 boards will be shipped on Sep 8 th. QA test set up is being developed at test bench. Start installation from the week of Sep 15? – Start with top four octants in Station 1 – All cables need to be connected and tested before (LV, optical, water). 17

Technical Support /28/08 To match absorber and prototype RPC’s, we need to install new FEE upgrades in these 5 MuTR FEE’s We will develop a plan to access these for installation and testing from a custom work platform (to be designed). MuTrigger FEE upgrades in MMS in support of RPC prototypes

Technical Support /28/08 MuTr Decapacitations MuTr group needs this setup from last year to work on decapacitations in the south magnet

Technical Support /28/08 RPC2 Prototype Installation, cont’d

Technical Support /28/08 RPC Absorber Concept RFQ placed with CS

Technical Support /28/08 Detector upgrade Rack allotments New Platform HBD/RXNP (not shown) MuTrgrFEE N MuTrgrFEE S VTX Power FVTX NCC N NCC S RPC1 S RPC1 N New Platform RPC1 NS VTX FEM No Changes

Technical Support /28/08 Rack Room Reorganization Inventor model in progress

Technical Support /28/08 Safety, Security, etc. C-A requests that this be covered to prevent theft, etc. (Opaque plastic stapled over is OK.) We will need new storage boxes to replace rotted existing boxes. August Injury report is in (see next page) Desk chairs should have 5 legs. 4 legged chairs are unstable.

Technical Support /28/08 Safety, Security, etc. August Injury Report: 6 first Aid cases, 1 DOE reportable, 0 Dart - Employee fell down steps on way out of building  first aid - Employee inspecting crane twisted knee  first aid - Employee installing roof cut forearm  DOE Recordable (dermabond) - Employee cut finger while cutting tape with a razor blade  first aid - Employee using grinder experienced puncture wound  first aid - Employee sat on a chair, chair tipped over injuered leg  first aid - Employee cut hand installing sign  first aid Year to date: 60 first aid, 24 Recordable, 13 DART DOE Targets: n/a first aid, 16 Recordable, 6 DART

Technical Support /28/08 Where To Find PHENIX Engineering Info Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Mystery man at PHENIX Will he keep the MuTrgr FEE project on schedule?