LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September 20041 Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.

Slides:



Advertisements
Similar presentations
Questionnaire Response
Advertisements

28 February 2003Paul Dauncey - HCAL Readout1 HCAL Readout and DAQ using the ECAL Readout Boards Paul Dauncey Imperial College London, UK.
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
29 January 2004Paul Dauncey - CALICE DAQ1 UK ECAL Hardware Status David Ward (for Paul Dauncey)
LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory14 September 2000LEB2000 Krakow The Front-End Driver Card for CMS Silicon Microstrip.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
CMS Annual Review September 2004Geoff Hall1 Tracker Off-detector Electronics On-detector electronics production approaching completion procuring spares.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
1 UA9 September 2010 test beam Si telescope hardware status Mark Raymond – 3/9/10.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Instrumentation Department John Coughlan Rutherford Appleton Laboratory14 November 2002 CMS Tracker Readout Effort Requirements in Instrumentation Department.
Design and Performance of a PCI Interface with four 2 Gbit/s Serial Optical Links Stefan Haas, Markus Joos CERN Wieslaw Iwanski Henryk Niewodnicznski Institute.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
FED Overview VME-FPGA TTCrx BE-FPGA Event Builder Buffers FPGA Configuration Compact Flash Power DC-DC DAQ Interface 12 Front-End Modules x 8 Double-sided.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory28 March 2003 FED Project Plan 2003 FED Project aiming to satisfy 2 demands/timescales: Module.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
J. Coughlan et al. 1st October 2003 LECC 2003 Amsterdam The CMS Tracker Front-End Driver 9 th Workshop on Electronics for LHC Experiments Amsterdam J.A.Coughlan,
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
16th July 2003Tracker WeekJohn Coughlan et. al.FED-UK Group Final FED Progress Report CMS Tracker Week 16th July 2003.
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
Instrumentation DepartmentCCLRC Rutherford Appleton Laboratory Clocks Data FEDv1 Final Firmware Subtasks Serial Comms VME LINK VME Bus VME SystemACE System.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
Trigger Meeting: Greg Iles5 March The APV Emulator (APVE) Task 1. –The APV25 has a 10 event buffer in de-convolution mode. –Readout of an event =
09/01/2016James Leaver SLINK Current Progress. 09/01/2016James Leaver Hardware Setup Slink Receiver Generic PCI Card Slink Transmitter Transition Card.
Tracker Week 21st April CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory11 September 2002LEB 2002 Colmar The Front-End Driver Card for the CMS Silicon.
CMS FED Testing Update M. Noy Imperial College Silicon Group.
24th October 2003 M. Noy, Imperial College London0 M. Noy FED Project Status.
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
FED V1 Pulse Shape Issues System Meeting, CERN 14 th -16 th October 2003 M. Noy Imperial College London Pulse Shape Issues for the Tracker FED M. Noy Imperial.
1 UA9 telescope first ideas Rome – 12/3/2010 Mark Raymond –
1 Level 1 Pre Processor and Interface L1PPI Guido Haefeli L1 Review 14. June 2002.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
CMS FED Testing Update M. Noy & J. Leaver Imperial College Silicon Group.
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
FED Temperature Measurements: Greg Iles31 March FED temperature measurements –Will components on FED exceed operating temperature in CMS? Analogue.
Instrumentation DepartmentJ. Coughlan et al.Rutherford Appleton Laboratory23 October 2002Tracker Electronics Meeting The Front-End Driver Card FEDv1 VME.
General Tracker Meeting: Greg Iles4 December Status of the APV Emulator (APVE) First what whyhow –Reminder of what the APVE is, why we need it and.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
ESDG Mtg 15th April CMS-FED Production FEDv1 Productions Jan 2003 : 2 boards. Working. June 2003 : 3.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory18 July 2001 CMS Tracker FED CMS Tracker Two Weekly.
22/06/2016James Leaver Current FED Tester Status.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
The 96 Chann FED Tester: Greg Iles2 September Channel FED Tester Status –Prototype now fully populated with AOHs. –Forced to borrow seven 2-channel.
LECC2003: The 96 Chann FED Tester: Greg Iles30 September The 96 channel FED Tester Outline: (1) Background (2) Requirements of the FED Tester (3)
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Development of the CMS Silicon Strip Tracker Readout
Vertex 2005 November 7-11, 2005 Chuzenji Lake, Nikko, Japan
VELO readout On detector electronics Off detector electronics to DAQ
Example of DAQ Trigger issues for the SoLID experiment
UK ECAL Hardware Status
Optical links in the 25ns test beam
The CMS Tracking Readout and Front End Driver Testing
FED Design and EMU-to-DAQ Test
Presentation transcript:

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Performance of the CMS Silicon Tracker Front-End Driver 10th Workshop on Electronics for LHC Experiments and Future Experiments R. Bainbridge, E. Corrin, C.Foudas, J. Fulcher, G. Hall, G. Iles, J. Leaver, M. Noy, M. Raymond, O. Zorba Imperial College J.A.Coughlan, S.A. Baird, I. Church, C.P.Day, E.J.Freeman, W.J.F.Gannon, R.N.J. Halsall, M. Pearson, G. Rogers, J. Salisbury, S.Taghavirad, I.R.Tomalin CCLRC Rutherford Appleton Laboratory I. Reid Brunel University Presented by Greg Iles:

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Microstrip Tracker readout chain Off Detector (counting room) –Optical links transmit equivalent to kHz trigger rate –440 Front End Drivers (FEDs) On Detector: –9M silicon strips –73k APV25 readout chips –Analogue readout via 43k optical readout links APV MUX 2:1 APV readout chip 128:1 PLL DCU APV readout chip 128:1 Front End Module Detector FED ADC x12 FPGA ADC x12 FPGA x8 FPGA RAM Transition card S-link card DAQ FMM Throttle signals AOH 9U VME back plane x96

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Front End Driver (FED) 96 optical fibres inputs, each a multiplexed pair of APVs 8 front end blocks each driven by a 12 way optical ribbon cable Raw input data rate (all 96 fibres) = 3.4GB/s. Output rate down slink = 50MB/s /% occupancy VME FPGA Front-End data processing FPGA Power S-Link Back End “System” FPGA FE Unit

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Front End (FE) Unit on FED Opto-RX, 12 way 12 x Buffers 3 x Delay FPGA (ADC clk timing) 6 x Dual 40MHz, 10bit ADCs Virtex II, 2M gate FPGA performs signal processing Optical ribbon cable input Analogue circuitry duplicated on secondary side Signal magnitude Digital header 128 analogue values (one for each microstrip) MIP De-multiplexed fibre channel = APV Data Frame To extract hit need to perform: - Common mode subtraction - Pedestal subtraction - Cluster finding - Sync checking Opto-to-electrical conversionDigitise & sync dataFind hit clusters Time

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September FED status At LECC ’03 in Amsterdam –Start ‘03: The first two FEDv1 boards were manufactured –June ‘03: After testing showed there were no major faults a further 3 FEDv1 boards were produced Progress in the last year –Sept. ‘03: Further 6 boards had serious problems –Start ‘04:A further batch of 6 boards manufactured and assembled at different company –Spring ‘04: FEDs distributed to CERN, Pisa, Lyon –June ‘04: Beam test at CERN –Sept. ‘04:FEDv2 should return from manufacture. –End ‘04:Manufacture a further 20 FEDv2 assuming no surprises. Software and DAQ for the CMS Silicon Tracker Front End Driver Poster by Jon Fulcher The Manufacture of the CMS Tracker Front-End Driver Poster by John Coughlan

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Testing in the lab FED –Tested with FED Tester Ensemble FED Tester Ensemble –Drives all 96 FED channels with data similar to that expected in CMS. –100kHz Poisson L1A. –Also provides clock, L1A and throttling from built in Trigger Control System (TCS) –An ensemble is made up of 4 FED Testers. Master FED Tester: Provides clock and control to additional 3 FED Testers FED under test sandwiched between 2 additional FEDs and crate closed to simulate airflow & temperatures in fully populated crate. VME access via SBS 620 PCI-VME bridge

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September The FED Tester DACs System FPGA VME FPGA AOHs x-point switches and buffers on back side Power Master & slave I/O Optical outputs Fibre spools Data for 3 channels loaded into FPGA. Converted to analogue form by 3 DACs. Cross-point switch controls distribution of the 3 unique channels to the 24 channels. 8 three channel TOB type AOHs convert the electrical signal to optical signals. Temp of AOHs controlled to +/-1ºC Provides 24 optical channels & Trigger Control System (TCS)

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Laboratory test set-up Slink Rx Generic PCI Card VME crate PC Slink PC (PCI-X slots) Access VME with SBS620 PCI-VME link LVDS cable FED Simulate Local Trigger Control System FT (master) FT (slave) Slink-Tx VME crate Clock & L1As from FT to FED Throttle signals from FED to FT Merge 96 fibres into 8 ribbons of 12 fibres

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Slink transition card Carrier for slink transmitter –Buffers control and data signals –Buffers throttle signals –FED v1 and V2 compatible Status –Returned from manufacture in August. –S-link verified –Throttle signals still under test DAQ – Slink Transmitter FED Slink data and control signals Throttle signals to FMM VME Backplane

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Slink verification Check –Verify data transmitted by the FED via slink is not corrupted.Set-Up –FED sending test patterns (scope mode, sample size 6) –100 kHz repetitive trigger CPU can only verify data transmitted at ~28 Mbytes/sec Hence FED asserts “BUSY” and trigger rate falls to ~17.1 kHzResults –Verified 1 TB of data in 10.8 hrs No errors –No errors observed so far, however it would take 146 days to guarantee no more than 1 error per week in CMS. However.... –In rate test with transition card borrowed from another sub detector (no signal buffering) we did observe occasional errors. –More tests needed. Add CRC check.

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Slink max data throughput FED configuration –Scope mode, repetitive triggers at 100kHz. –Varied scope sample length to vary event size. Results & Conclusions –Maximum transfer rate = 469MB/s –Observed S-link receiver exerting back pressure for events > 4.88kB –PC rather than FED setting upper limit. –Switched to random triggers at 100kHz OK in scope mode & zero suppressed mode Requirements for CMS –200MB/s Average –400MB/s Peak

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Temperature control Fan direction Air deflector Simple air deflector in centre of card lowers temperature in hottest region by ~10°C OptoRx #7 OptoRx #0 Max temp of OptoRx = 70°C

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Where are Tracker buffers ? Buf 1 Buf 12 Front-End FPGA 1 Buf 1 Buf 12 Chan 1 Chan 12 Head Buf Back-End FPGA Mux BE Buf Bus 1 Bus 8 80MB/s 200 MB/s Avg 400 MB/s Peak 640 MB/s Unlimited APV 40 10bit Chan 1 Chan 12 Laser Driver 40 10bit APV Buffers, ~10 in decon mode controlled by APVE FE Buffers, 4kB, ~250 ZS events BE Buffers, 2MB, ~1000 ZS events Front-End FPGA 8 Header Buffer

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Buffer tests Check FED buffers can handle high rates & occupancies –Want to test “unconstrained” FED Don’t want slink back pressure limiting results Slink throttle disabled. Data sent to slink oblivion –Ideally would like all FED buffers to assert “Busy” or “Warn” when becoming full. If buffer overflow inevitable -> Detect the event, but ignore data Set flag to indicate data loss and record the number of these events –Not possible yet, although BE buffer can assert throttle signals Use different approach. Not perfect, but still informative. No throttling used Count number of triggers before FED hangs

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Buffer test results Conditions: Data taken in Zero Suppression mode Single strip clusters used to create largest event size possible and thus worst case. APV frame occupancy kept constant. - e.g. 6 strips = 4.7% occupancy - Easier to understand results. - Large buffers -> Valid approx Performed 5000 "tests“. Each comprised 100k triggers, 100kHz Poisson distributedResults: FED handles single strip occupancy up to 6.25% (8 single strip clusters)

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Beam Test June ‘04 CERN X5 Area –4 FEDs –252 fibres –65,000 strips –2 FEDs slink –Provided excellent opportunity for system integration –Large complex system useful for finding system weak points. Beam

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September Summary FED v1 –Commissioning tests at RAL, Imperial & CERN continuing well. –Baseline firmware and software operational FED v2 and S-link Transition card –Both back from manufacture in August ’04 –Only preliminary results so far, but everything seems OKFuture –System integration e.g. Calibration of Tracker & Database systems –Production issues e.g. Industrial testing

LECC2004: Performance of the CMS Silicon Tracker FED: Greg Iles13 September More information... Software and DAQ for the CMS Silicon Tracker Front End Driver Poster by Jon Fulcher The Manufacture of the CMS Tracker Front-End Driver Poster by John Coughlan