Gulana Hajiyeva WB Safeguards Training Workshop Almaty, December 2012.

Slides:



Advertisements
Similar presentations
MODULE 1: Introduction to Environmental Assessment
Advertisements

Module 4 Planning SP. What’s in Module 4  Opportunities for SP  Different SP models  Communication plan  Monitoring and evaluating  Working session.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Cumulative Environmental Impact Assessment Ankara, Turkey May, 2011 Agi Kiss Regional Safeguards Coordinator Europe and Central Asia Region.
Presented to: 2010 Airports Conference By: Sue McDonald With slides by Tom Klin, CH2M HILL Date: March 3, 2010 Federal Aviation Administration Cumulative.
ENVIRONMENTAL ASSESSMENT SEA Jamie Byfield SEA Technical Officer HRA & EIA Cara Davidson Policy Manager.
BMT Cordah Limited 1 Offshore Wind Energy Strategic Environmental Assessment (SEA) Phase 1 “Progress and Lessons” Mark Jennison and Trevor Baker BMT Cordah.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
Moving towards a more comprehensive planning SEA and indicators Per Christensen Aalborg University Denmark.
Cumulative Impact Assessment for the Wind Energy Sector
Secretariat to the Espoo Convention and its Protocol on SEA
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Policy Responses and Follow-up Session 4.
LINKAGES AND SYNERGIES OF REGIONAL AND GLOBAL EMISSION CONTROL Workshop of the UN/ECE Task Force on Integrated Assessment Modelling January 27-29, 2003.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Integrated thematic assessments: outlook on water, data and.
Vulnerability and Adaptation Assessments Hands-On Training Workshop
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
GREATER MEKONG SUBREGION CORE ENVIRONMENT PROGRAM Component 1: Environmental Planning Systems, Methods and Safeguards Improved Activity Progress and Component.
1. 2  Strategic – BC Hydro Long Term Planning  Project level  Environmental Assessment ▪ Federal - Canadian  Integration 3.
27-28 September, 2005, Bratislava ENERGY AND ENVIRONMENT COMMUNITY OF PRACTICE MEETING Strategic Environmental Assessment (SEA) – Tool for Sustainable.
The model Modelling best practice in SEA a 10-step presentation.
Environmental Impact Assessment (EIA): Overview
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Implementing the Second Pillar of the Aarhus Convention: Problems Identified in the National Implementation Reports Magda Tóth Nagy, Senior Expert Geneva,
ECASA Initial meeting, OBAN, 7th-8th December 2004 WP 2 : Identyfying and quantifying the most relevant indicators of the interactions of aquaculture on.
Wetlands and Poverty Reduction Project Anglophone regional practitioners training course MODULE 3 POLICY SETTING AND ADVOCACY By Teddy Tindamanyire, Isah.
The Federal Resource Management and Ecosystem Services Guidebook Federal Resource Management and Ecosystem Services Guidebook nespguidebook.com ASSESSMENT.
ANCILLARY & INDUCED ACTIVITIES AND INDIRECT & CUMULATIVE IMPACTS SAFEGUARDS TRAINING WORKSHOP ESRA ARIKAN, AGI KISS MAY 2013.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Strategic Environmental Assessment – necessity, principles and specificities Monika Sabeva, University of National and World Economy, Sofia, Bulgaria
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
Vulnerability and Adaptation Kristie L. Ebi, Ph.D., MPH Executive Director, WGII TSU PAHO/WHO Workshop on Vulnerability and Adaptation Guidance 20 July.
Delivering sustainable solutions in a more competitive world Application of Strategic Environmental Assessment (SEA) to the BDP Environmental Resources.
ENVIRONMENTAL IMPACT ASSESSMENT: Managing Hydropower, Mining and Infrastructure Development Impacts on Natural Capital Iain Watson Senior Environmental.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
INTERNATIONAL EXPERIENCE AND TRENDS IN EIA FOR DEVELOPMENT PROJECTS Clive George EIA Centre and Institute for Development Policy and Management University.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
SEA in the Czech Republic Prague, 24 September 2008.
UNFCCC Workshop on the preparation of national communications from non-Annex I Parties General description of steps taken or envisaged by non-Annex I.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
CUMULATIVE EFFECTS ASSESSMENT METHODOLOGY AND TECHNIQUES.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Public Participation and Consultation: The Experiences of Europe Ralf Aschemann Austrian Institute for the Development of Environmental Assessment (An.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
1 Scenario formulation Scenario-based planning is a structured way of thinking about what might happen in the future Scenarios are descriptions of possible.
National Environmental Assessment Requirements and Relation to World Bank Policies Relevance to Central Asia Gulana Hajiyeva WB Safeguards Training Workshop.
Marco Martuzzi World Health Organization Regional Office for Europe Health Impact Assessment as part of SEA.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Environmental and Social Analysis in World Bank Projects Challenges to implementing more strategic approaches Glenn Morgan Regional Safeguards Advisor,
Guidance on integrating climate change and biodiversity into SEA/EIA Commission Group of National EIA and SEA Experts Dublin, April 2012 European.
Convention of the Protection and Use of Transboundary Watercourses and International Lakes Developing a guidance on water and climate adaptation for the.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Strategic Environmental Assessment Patrick White and Nelly Isyagi.
Building WFD into impact assessment Richard Sharp Geomorphology IEMA webinar Thursday 31 March 2016.
Using Analysis and Tools to Inform Adaptation and Resilience Decisions -- the U.S. national experiences Jia Li Climate Change Division U.S. Environmental.
TOOLS FOR MINING DEVELOPMENT POLICY AND IMPLEMENTATION
Legal aspects of public participation in the ecosystem-based water management in the Baltic Sea Region Maciej Nyka Economic Law and Environmental Protection.
Expert Meeting Methods for assessing current and future coastal vulnerability to climate change 27 – 28 October 2010 Draft conclusions.
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
5-b) 2012 Blueprint to Safeguard Europe's Water Resources
5-b) 2012 Blueprint to Safeguard Europe's Water Resources
Relationship between World Bank and Romanian EA requirements
Strategic Environmental Assessment (SEA)
Fitness Check EU Water Policy
Presentation transcript:

Gulana Hajiyeva WB Safeguards Training Workshop Almaty, December 2012

 Strategic Environmental (and Social) Assessment WB (as of March 2011); EU & some national laws: for policies, plans and programs; not a substitute for project-specific EA  Regional or sectoral EA: when the project is likely to have sectoral or regional impacts

 “Upstream” planning tool (input to sectoral or regional planning process)  Helps identify more vs. less sustainable development pathways  Can be OP 4.01 Instrument for programmatic investment ◦ even if Category A projects are included ◦ special emphasis on cumulative impacts  Must include SUBSTANCE, not just process (not same thing as EMF)  Relatively new instrument; limited guidance, limited capacity and experience

SEA Protocol on Espoo Convention UNECE Convention on EIA in a Transboundary Context (July 2010) Objective:  sets out the obligations of Parties to assess the environmental impact of certain activities at an early stage of planning  It lays down general obligation of States to notify and consult on all major projects that are likely to have a significant adverse environmental impact across boundaries

 the scale and timing of SEA  the rigid approach to the scoping  the timing of stakeholders engagement  limited awareness of SEA process; thus, need to clarify early the SEA benefits  the capacity and resources for implementation  identification of stakeholders/main champion  environmental data availability and quality  undertaken in parallel with the planning and preparation of a project, program, strategy or plan rather than after

 Azerbaijan Highway Projects: Regional Environmental Review identifying regional environmental and social impacts and providing framework for detailed EIAs for each road/section  Greater Baku Regional Development Plan (GBRDP): Strategic Environmental Assessment (SEA), identifying potential environmental issues to be considered by any future developmental activities in Bake area

What is Cumulative Impact Assessment? Project A site Project A zone of impact Important Env. Asset Important Cultural Asset Existing Facility B site Facility B zone of impact Zone of impact of planned/reasonably foreseeable development or trend Zone of Impact of directly linked or induced development

Project Level vs. Regional Level CEIA River basin with hydropower projects Existing project Planned future project (licensed approved) Proposed project Ocean

EIA and “CEIA” Minor risk Few other significant impact sources Easily understood impacts and interactions Major risk Numerous other significant impact sources Complex impacts and interactions Cumulative impacts section of EIA prepared without in- depth CEIA exercise In-depth CEIA exercise needed (should be simultaneous and interactive with rest of EIA) EIA should identify potential cumulative impact issues and associated risks:

Why Do CEIA? Because a proposed project is likely to have significant impacts on regional “Valued Ecosystem Components” which are also impacted by other actions/trends (sources) Because the impacts from different sources (stressors) can interact in additive or synergistic ways, not always easy or straightforward to predict, requiring in-depth analysis Because the most feasible and cost-effective mitigation measures might not lie within the context of the proposed project Because impacts from other stressors can undermine the project’s objectives and/or result in unexpectedly severe impacts Because looking at the broader picture might reveal new opportunities for better overall outcomes

What information is needed to determine whether EIA for Project A needs to take Facility B into account? Distance between A and B …. are there circumstances where this information might be enough? Located within same ecological system (river/lake basin, watershed, airshed, wildlife home range) ….. what information is needed to know this? what sources can provide it? Overlapping zones of impact – impact on the same VECs …. what information is needed to know this? what sources can provide it? When to do CEIA? Starting point: Project A has potential off-site impacts (e.g. air or water emissions, erosion/sedimentation, noise, etc.) which cannot be eliminated through realistic mitigation measures

How to do CEIA: Assessment Framework 1. Scoping: Identify issues/assets of concern, at a regional scale – (information sources: spatial plans, experts, public consultation) Select appropriate Valued Ecosystem Components and determine Limits of Acceptable Change for those VECs Identify spatial and temporal boundaries for the study based on VECs Identify other stressors (existing and expected future actions and trends) that may affect the same VECs Identify potential impacts of project and of other stressors – together they make up the cumulative impacts (Red text indicates how CEIA differs from EIA)

3. Potential mitigation measures: Identify potential mitigation measures – for proposed project and where possible, measures to reduce impacts of other stressors Evaluate feasibility and costs, develop realistic mitigation plan -- including costs and institutional responsibilities (some of which may be outside scope of the project) 2. Data Collection and Analysis: Collect baseline data relevant to VECs and potential impacts -- literature, consultation, data collection Assess likely effects of the project on VECs Assess likely effects of other stressors on VECs Evaluate potential cumulative (additive, synergistic) effects to assess total impact; use scenarios and modeling as appropriate

4. Evaluate residual impacts: Compare to pre-determined Limits of Acceptable Change/ objectives/thresholds 5. Follow-up (multi-stakeholder) Monitoring of VECs and mitigation measures (project and other stressors) Adaptive management – process to make changes based on monitoring

Discussion of Cumulative Impacts within EIA VECs may be general and LACs may be presented in qualitative terms Usually rely on existing data Usually use relatively simple analytical tools (e.g. impact matrix) In-depth Cumulative Impact Assessm ent VECs should be specific and LACs mostly expressed in quantitative terms Often requires collection of additional baseline and impact-related data Use more sophisticated and quantitative analytical tools (mathematical or computer modeling of alternative scenarios, dose/response curves, GIS/land use mapping, etc.)

2-matrix tool for simple CIA (example of small HEPP) Matrix 1: potential biophysical and socio-economic impacts of project components Impacts Water speed upstream Water speed downstream Water volume downstream Forest cover Slope stability Etc. Project Component/action Construction of regulator XX Diversion of water flow X Construction of access roads XX Construction of tunnels X Construction of power house X Etc. (Overlapping marks indicate potential cumulative impacts to be considered)

Matrix 2: potential effects of other activities in the area ImpactsWater speedWater volumeForest coverSlope stabilityEtc. Other activities other HEPP XXXX Agriculture X Forestry XX Mining XX Etc.

How to Use CEIA Like all EIA, an input to decision-making Fullest possible information for decision-makers and stakeholders … clarify options and trade-offs Influence siting, design and operation of projects Identify development trends which may require strategic planning Identify most effective and efficient mitigation measures (may be outside of the proposed project)