Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.

Slides:



Advertisements
Similar presentations
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Advertisements

The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
Ana-Paula Bernardes EN-STI-RBS
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.
Construction and Installation of the CLIC Experimental Area
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
HIE-ISOLDE contribution packages M. Pasini BE/RF.
HIE-ISOLDE Project Status Report Y. Kadi for the HIE-ISOLDE Project Team 49th INTC Meeting CERN, 11 February 2015.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
EN-STI Group meeting 1 st February 2013 EN-STI Group meeting 1 st February 2013 Interventions for LS1 Elodie Macario EN/STI.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
PH Dept News Long shutdown 1: Baseline Project Project Leader Freddy Bordry Injector shutdown Dec 2012-Mar 2014 means 1 year stop for ISOLDE Physics LS2.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
HIE-ISOLDE Project Status Report 52nd ISOLDE & nTOF Technical Committee meeting February 3rd 2016 Y. Kadi On behalf of the HIE-ISOLDE Project Team.
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
Riccardo Raabe (IKS, KU Leuven) for the Collaboration INTC 01/02/2012 INTC-O-014 Storage ring facility at HIE-ISOLDE: Technical Design Report.
Krzysztof Radwan, PJAS, TE/VSC/ICM Interlocks, Controls and Monitoring Section HIE-ISOLDE Vacuum Controls INSTALLATION.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Mid Term Review Meeting, 26 September * Research project supported by a Marie Curie Early Initial Training Network of the European Community’s Seventh.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Richard Catherall EN-STI CERN, 3 rd November 2011 ISOLDE Technical Report for the INTC.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
ISOLDE & HIE ISOLDE Status and Plans Richard Catherall EN-STI ISOLDE Technical Coordinator IEFC Workshop 7 th – 9 th March 2012.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
HIE-ISOLDE Status Report Yacine Kadi on behalf of HIE-ISOLDE project team ISOLDE Annual Workshop, 5 December 2011.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
Status and Future Perspective of the HIE-ISOLDE Project CERN, November 19-20, 2012
PH Department News Discussion with management
Framework Schedule from EYETS 2016 to LS2
Workshop, 10/2012 “The Project”
Status HIE ISOLDE installation and shutdown work
HIE-ISOLDE Report Jose Alberto Rodriguez on behalf of Yacine Kadi and the HIE-ISOLDE project team.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Status of Cryogenics Facilities Design
YETS Dec 2017 – March 2018 LS Experiments requirements / Services (un)availability F.Butin / EN-EA EACM meetings outcome, thanks to all participants.
HIE-ISOLDE Project Status Report
HIE-ISOLDE Project: Planning & Resources
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
HIE-LINAC status report
PH Dept News Long shutdown 1: Baseline Project
Report on HIE-ISOLDE Status
CERN’s MidTermPlan and the consequences for HIE-ISOLDE
CERN-ISCC Meeting “Storage Ring Facility at HIE-ISOLDE”
66th ISOLDE Collaboration Committee meeting
HIE-ISOLDE contribution packages
Beam Transfer Line Stage 1:
Presentation transcript:

Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 2 Abstract Isolde today Hie-Isolde – The Energy upgrade –Planning –Civil Engineering, Cryogenics and Ventilation –Superconducting Linac and Beam Transfer Line User requirements? Impact on Isolde & REX operation User facilities ( under discussion) Future projects

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 3 Isolde Today

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 4 Isolde Today Target Zone

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 5 Isolde Today Separator zones GPS and HRS Separator

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 6 Isolde Today Experimental hall: Beam delivery

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 7 Isolde Today REX post-accelerating Linac Miniball experiment REX post-accelerating Linac

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 8 From Isolde to Hie-Isolde Step by Step

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 9 Hie-Isolde Planning A simplified presentation of the different stages: -What is the impact on operations? Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q Civil Main services Cryo CM 1&2 CM 3&4 5.5MeV/u 10MeV/u Beam Transfer Line CM 5&6

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 10 Civil Engineering Construction starting date: June 2011

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 11 Civil Engineering Removal of the transport hangar

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 12 Civil Engineering Terrain flattening

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 13 Civil Engineering New SAS September 2011

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 14 Civil Engineering Move of the controlled access September 2011

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 15 Civil Engineering Compressor Building Start end September 2011

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 16 Civil Engineering Cold Box Building Civil Engineering finished by July 2012

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 17 Main Services Electrical systems, Cooling & Ventilation

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 18 Electrical systems: July 2012 – March 2013 Cooling & Ventilation: Aug 2012 – March 2013 Main Services

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling Ventil units 19 Cooling & Ventilation

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 20 Cooling & Ventilation

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling Ventilation unit Cooling unit 21 Cooling & Ventilation

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling Cooling units 22 Cooling & Ventilation

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling Cryo equipment 23 Cryogenics Compressors: April 2013 – October 2013 Cold Box & Cryo-line: Jan 2014 – June 2014

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 24 Hie-Isolde New controlled access point

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 25 Hie-Isolde

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 26 Hie-Isolde

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 27 Hie-Isolde

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 28 SC Linac Cutting walls & install tunnel: long 2013 shutdown Cold Line: January 2014 – June 2014 Allowing a normal 2012 REX / Miniball run

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 29 Modular installation Cryo Modules 1 & 2: July 2014 – Oct 2014 REX physics at 5.5MeV/u for 2015 First beam at 5.5MeV/u autumn 2014 High β Low β

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 30 Cryo Modules 3 & 4: January - April 2016 Modular installation High β Low β Final Energy 10MeV/u Cryo Modules 5 & 6: January - April 2017

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 31 Hie-Isolde SC Linac 5.5MeV/u by the autumn of 2014 First 10MeV/u by April 2016 Hie-Isolde SC Linac:

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 32 Beam Transfer Line

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 33 Beam Transfer Line Straight line with 2 branches – July April 2014 Miniball move: Oct 2013 – April 2014 Miniball Actar / Helios Miniball Beam diagnostics Stage 1:

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 34 Beam Transfer Line The bend Spectrometer installation and 2nd Miniball move Miniball Spectrometer Actar / Helios Miniball Stage 2: TSR TSR and beyond.. Stage 3:

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 35 User Requirements Requirements for the experiments Info needed on: Power consumption Cooling & ventilation Cryogenics Alignment & spacing (nr of racks) Sensitivity to radiation, temp & vibrations Transport requirements

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 36 Isolde & REX Operations long shutdown 2013Lin4 major sdsd CM1&2 Isolde & REX Operations: ///// shutdownIsolde & REX perturbationsREX stop Main serv. Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q Civil Main services Cryo CM 1&2 CM 3&4 5.5MeV/u 10MeV/u Beam Transfer Line CM 5&6 Jan 2013 Aug 2014

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 37 User Facilities 1. Increasing the surface of the Solid State Lab in building B.115: For RP safety reasons all solid state activities will be moved from B.275 to B.115 This will suppress the existing workshop in B.115 and courtyard between B.115 and B Replace the existing building 507 by a new full concrete building : Ground floor (only accessible from within the surveyed area): - Labs and workshop First floor (accessible from outside the surveyed area): - Data Acquisition rooms - Visitor Centre - Kitchen Long shutdown 2013? under discussion

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 38 Present situation (ground floor Jura side): Control room User Facilities

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 39 Solid State Lab Increasing the surface of the Solid State Lab in B.115: Control room

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 40 Replace building 507 Control room 2. Replacing the existing building 507 by a new building - Ground floor (only accessible from within the surveyed area):

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 41 Control room 2. Replacing the existing building 507 by a new building - First floor (accessible from outside the surveyed area): Replace building 507

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 42 Hie-Isolde TSR Max Planck Institute Heidelberg LOI submitted Jan 2011 (K. Blaum, Y. Litvinov) Future

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 43 Hie-Isolde Would the TSR fit? No. CH F But could be an option for additional beamlines

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 44 Hie-Isolde

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 45 Hie-Isolde Possible TSR installation above the CERN cable-tunnel. Tilted beamline coming up from the machine.

HIE Infrastructure, Lund 10 March 2011 Erwin Siesling 46 Acknowledgement EN/HDO: YACINE KADI, BE/RF: MATTEO PASINI GS/SE: DANIEL PARCHET, ELISEO PEREZ-DUENAS EN/CV: PAUL PEPINSTER, BENOIT BELLIN-CROYAT EN/EL: RENE NECCA TE/CRG: NICOLAS DELRUELLE, JOS METSELAAR EN/STI: ANA-PAULA BERNARDES, RICHARD CATHERALL EN/MEF: STEPHANE MARIDOR GS/DI: CYRILLE BEDEL TE/MSC: YANN LECLERCQ