BPM for Spectromety development status A. Lyapin.

Slides:



Advertisements
Similar presentations
BPM Energy spectrometry, status & future plans at ESA in SLAC Bino Maiheu University College London Yerevan Collaboration Meeting October 2006 Yerevan.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Cavity BPM for Spectromety: progress and plans A. Lyapin.
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
Bob Lill Undulator Systems – Cavity BPM October 12, 2006 Undulator Cavity BPM Status.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Beam Test status and Plans of the ILC Main LINAC BPM
PASI OsC meeting 12th July 2012
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Modify Existing Scanning Electron Microscope (SEM) SEM FE Probe Surface Science Study L. Laurent, S. Tantawi, R. Kirby *This research is funded by the.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
BPM for FF test (ATF2) Vladimir Vogel KEK 2nd Nano Workshop, KEK, December 12, 2004.
CARE SC meeting, CERN, 13th September, Report on SRF Work-packages WP7Power Couplers WP8Tuners WP9 Low level RF WP10Horizontal Cryostat Integration.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
Report and plan of the tilt monitor Daisuke Okamoto Tohoku University.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
Progress report of the tilt monitor Daisuke OKAMOTO Tohoku University.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
WFM electronics Alexandra Andersson. F. Peauger – CTF3 committee – 11/02/10  Wakefield Monitors implemented in two accelerating structures TD24 (tank.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
“CENTRAL SUPPORT FRAME” -
Status of BPMs and Electronics System at KNU.
Re-entrant BPM R&D for ILC Main Linac
Wakefield & Cavity based Monitors: Fermilab BPM Development Plans
CLIC Workshop 2016: Main Beam Cavity BPM
WP02 PRR: Master Oscillator and RF Reference Distribution
BC Technology Education Association
Fabrication of KEK-ATF2 Q-BPM
IP configuration session
BC Technology Education Association
Undulator Cavity BPM System Status
Crab – RFD prototype: Fabrication Status Update
Undulator Cavity BPM Status
Breakout Session SC3 – Undulator
BC Technology Education Association
Presentation transcript:

BPM for Spectromety development status A. Lyapin

WP 4.2 meeting, 13 September Summary  BPM design more or less finalized  Al prototype ≥50% done, need ~2 weeks  Need to test the model and fix the tolerances ~2 weeks, may need to modify the design – got nicer feedthroughs  Test bench is operational  Cu (vacuum) prototype – design ≥50% done  Planning to start cutting copper in October  Material (OFC) purchased  Reference cavity – just started with the electrical design so far  Signal processing electronics – overall layout finalized, looking for components, putting together spreadsheets  Calibration scheme – overall layout finalized, key components found, quotes received (~£2-3k project)

WP 4.2 meeting, 13 September Prototype Al model  MSSL finished working on the waveguides (spark erosion)  UCL workshop to continue this week  Slots, holes for the feedthroughs to be put in, beam pipe to be cut to the dimension, other bits and pieces to be put in

WP 4.2 meeting, 13 September Prototype Al model

WP 4.2 meeting, 13 September Cavity BPM test bench  Test bench is up and running  2.8 GHz oscillator is on its way to UCL  VNA is on its way to RHUL

WP 4.2 meeting, 13 September Cu vacuum prototype  Most of the problems cleared, brazing seems to be ok  DN63 flanges to fit the rest of the ESA beamline, 8 through holes for support  Need to modify the feedthroughs  Reduced the length for easier machining, monopole rejection should be sufficient  Need some input from KEK on tuners

WP 4.2 meeting, 13 September Reference cavity

WP 4.2 meeting, 13 September Electronics

9 Electronics

10 Electronics

WP 4.2 meeting, 13 September Calibration scheme  Probably a final scheme now  Can actually use the drive line power, but want to use it for the LO  Still need to find suitable (high conversion gain) detectors  Passive elements are not a problem

WP 4.2 meeting, 13 September Calibration scheme