Bill Christie For the STAR Collaboration January 5, 2016 1 Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.

Slides:



Advertisements
Similar presentations
Bill Christie For the STAR Collaboration MARCH 24,
Advertisements

STAR W.B. Christie, BNL RHIC/AGS Users Meeting June 4, STAR Goals and Performance, 2009 Run Outline Summary of STAR Goals for RHIC Run 9 Brief Summary.
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
Mar RHIC Planning Meeting Tuesday (Mar. 1) 12pm - Sun (Mar. 6) 8pm: 128 hours Data Taking time: 39.5 hours = ~84% Beam time with collisions (including.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
RESEARCH POSTER PRESENTATION DESIGN © The RHIC Beam Energy Scan (BES) was proposed to search for the possible critical.
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
STAR Ready to move on to 7.7 GeV Bill Christie For The STAR Collaboration April 13, Please N.B. All data plots shown in this presentation are online.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 5 April 2011 Time Meeting, BNL.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
Sampling luminosity Sampling efficiency ~66% Uptime ~79% STAR Time Meeting Report April 01, 2014 Salvatore Fazio 04/01/14S. Fazio1 STAR is up and smoothly.
May 12, 2009Włodek Guryn1 Physic Program with Tagged Forward Protons at STAR Single Diffraction Dissociation (inclusive SDD cross section, leading  0.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
10/15/2007Dunlop, Welcome and Overview, Analysis Meeting Analysis Meeting 2007: Welcome and Overview James Dunlop Brookhaven National Laboratory.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
STAR W.B. Christie, BNL STAR Collaboration meeting Michigan State University August 13, Summary of the FY03 Run, the Shutdown work, and plans for.
1 Guannan Xie Nuclear Modification Factor of D 0 Mesons in Au+Au Collisions at √s NN = 200 GeV Lawrence Berkeley National Laboratory University of Science.
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
Bill Christie For the STAR Collaboration June 15,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Non-Prompt J/ψ Measurements at STAR Zaochen Ye for the STAR Collaboration University of Illinois at Chicago The STAR Collaboration:
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
2007 Physics Run Status STAR Collaboration mtg June 12, 2007, Berkeley California Bill Christie Outline Overview of BUR/Goals for Fy07 Run Collider Performance.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
RUN16 Status Y. Akiba (RIKEN/RBRC) 2016/05/27 Radiation lab meeting.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
LHC schedule.
Run16 Y. Akiba.
Heavy Ion Physics in RUN14-16
Katarzyna Kowalik (LBNL) For the STAR Collaboration
Y. Akiba (RIKEN/RBRC) 2016/04/21 Radiation lab meeting
Run-5 Cu-Cu Integrated Luminosity
Presentation transcript:

Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run 16 AuAu STAR Schedule Summary

FMS/FPSFMS/FPS Roman Pots ISTIST PXLPXL SSTSST TPCTPCMTDMTDMagnetMagnetBEMCBEMCBBCBBCEEMCEEMCTOFTOF Heavy Flavor Tracker

3

RunEnergyDurationSystemGoalsprioritySequence 16  s NN =200 GeV  s NN =62 GeV  s NN =19.6 GeV 13-wk 4-wk 1-wk Au+Au Au+Au d+Au  c, D v 2, R AA, ϒ R AA 10nb -1, 2 billion MB evts 1.5B MB (1B w/ HFT) 100M MB

Limitation of options in operation mode <55KHz to reduce deadtime and LU rate Store length for optimized luminosity Perform dynamic beta* squeeze Projection from this mode: 1.8nb -1 /week delivered for MTD and 2 billion MB for HFT requires 13 weeks of operation run14 Run16 projection RHIC Machine Efficiency not Luminosity, STAR Operation and Optimization Are keys to achieve these goals.

6 <84%> <87%> <74%> Very good overall running efficiency. Mantra “Every minute counts” To first order: (0.84 uptime)(0.87 livetime) = 0.73 ~ Sampled L.

7 Jets/High- Dimuons Roman Pots Heavy Flavor (base rate)/10 TPC DAQ limit 1800 Hz polarization measurement s example fill 18882

Magnet checkout & Heat run, TPC HV check Install & light check BBCs STAR ready for Cosmic Ray testing Start 2 person Shifts Detector commissioning and Cosmic Ray running

9 STAR is on schedule. STAR is on schedule. STAR will be ready to start Commissioning and Cosmic Ray running next Tuesday, January 12 th STAR will be ready to start Commissioning and Cosmic Ray running next Tuesday, January 12 th Two person Shifts will begin on Jan. 12 th, and we plan to start the flow of flammable gases into the detector. Two person Shifts will begin on Jan. 12 th, and we plan to start the flow of flammable gases into the detector. We’ll continue accumulating Cosmic Ray data until collider commissioning with beam begins. We’ll continue accumulating Cosmic Ray data until collider commissioning with beam begins. One of STAR’s Run 16 top energy AuAu data set goals is to accumulate 2 billion minimum bias events. This will require a large “Physics ON” fraction per week of running from the Collider, as well as very efficient STAR operations. One of STAR’s Run 16 top energy AuAu data set goals is to accumulate 2 billion minimum bias events. This will require a large “Physics ON” fraction per week of running from the Collider, as well as very efficient STAR operations.

10 Figure 6-2 (From BUR): ZDC rates for requested beam profile. The green curve shows the scaled ZDC rate (luminosity for 10b cross section) as the expected maximum luminosity, and the red a luminosity profile with a dynamic beta*. ZDC rates for requested beam profile. The green curve shows the scaled ZDC rate (luminosity for 10b cross section) as the expected maximum luminosity, and the red a luminosity profile with a dynamic beta*. Red indicates what can be delivered if beta* is changed from 1.2 early in the store to 0.5 late in store In the proposed scenario the delivered luminosity is ~0.17 nb -1 per store. In the Run14 Au+Au at 200 GeV the average physics-on hours per day were 13.5 hours i.e per week. Thus RHIC can deliver ~94.5/9*0.17 ~ 1.8 nb -1 /week in this running mode. Even though the delivered luminosity is not the maximum that can be delivered, it still allows STAR to reach the proposed goals for both the minimum bias goals (2 Bevts) and the high luminosity goals (10 nb -1 ) given sufficient weeks of running. kHz Run 14 HFT Running 40 kHz