ATHENA - Module Construction P. Riedler, J. Rochet.

Slides:



Advertisements
Similar presentations
M. Jones, A. Boston, M. Chartier, B. McGuirk, P. Nolan, R.D. Page, P. Pusa, D. Seddon, J. Thornhill, D. Wells and the ALPHA collaboration Department of.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ATLAS Module building at Glasgow
Silicon Preshower for the CMS: BARC Participation
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Silicon /pcb assembly R Thompson, J Freestone LAL 3 June 08.
Pixel 2000 Workshop Christian Grah University of Wuppertal June 2000, Genova O. Bäsken K.H.Becks.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
WP6 status report A. Di Mauro (CERN) ITS plenary meeting
Low Mass Rui de Oliveira (CERN) July
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Sensors Pixel dimension 300 x 300 μm2 Standard p-in-n sensors
The STS-module-assembly:
The workflow of module assembly for the CBM Silicon Tracking System
Alignment of the CMS Tracker
T. Bowcock University of Liverpool
Update on Pavia MM mechanical prototype
Ladder Assembly All tools and jigs produced Glue dispensing works
FCAL R&D towards a prototype of very compact calorimeter
Micro Vertex Detector of PANDA Strip Detector
Ladder Assembly All tools and jigs produced Glue dispensing works
LumiCal mechanical design, integration with LDC and laser alignment
CFD-Team Weekly Meeting - 8th March 2012
Equipment for Assembly – UK Experiences
Angela Gligorova on behalf of the AEgIS and Medipix collaborations
Module/Ladder Assembly
Setup for testing LHCb Inner Tracker Modules
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

ATHENA - Module Construction P. Riedler, J. Rochet

1. ATHENA ATHENA is an experiment at the CERN antiproton decelerator (AD). The first run took place in August Goals: Antihydrogen production Longterm goal (2-3 years): CPT-test with a precision of (spectroscopy of 1S-2S) Unambiguous detection Study of recombination

A detector system surrounds the recombination zone to detect H via its annihilation signals: Charged pions 2 x 511 keV  “back-to-back” Silicon strip detectorsCsI crystals + photodiodes Determine the charged vertex and check the collinearity of the 2  within a time-window (~1µs). 2. ATHENA Vertex Detector

Petra’s activities (Nov March 2001) in ATHENA: Silicon Vertex Detector: Strip detector design and design checks for 77K Tendering and industry contact for production of silicon detectors Testing and QA Development of module design for 77K environment Construction of all ATHENA silicon strip modules Beamcounter: Development of ultra-thin silicon beamcounter (6-67µm) for 5.3MeV antiprotons at 10K (5x10 7 mips per µm)

Cylindrical symmetry Outer diameter: mm Inner diameter: 75 mm Length: mm Temperature: 77K Vacuum: mbar 16-fold symmetry 2 layers Si strip-detectors 192 CsI crystals with Si photodiodes 8960 read-out channels Schematic cross-section of the ATHENA vertex Detector

Outer layer

Inner layer

3. Modules

4. Constraints Double sided strip detectors o handling o connections on both sides required Temperature range: 77 K-300 K o mechanical stability (different TEC) - BUS! o glue Two layers of double sided detectors within 37.5mm radius o bonds o mounting

5. Gluing and matching of the module components Glue: araldite W106 low temperature mixture (50:50) (Advice from the group of M. Hominal at CERN) Temperature cycling (300K-77K-300K)

Reliable Regular Repeatable Commercial glue dispenser + Alignment setup with microscope 5.1 Glue Deposit:

Final setting glue drop for 18s every 10.6mm, 3bar N 2 Alignment hole on the jig for needle

Tests to define: Duration Needle diameter Pressure Step width Weight Silicon Glas Always weigh the two components of the glue!

Production of prototypes: Prototype 0: 160 mm Si + PCB hybrid + capton (V0) Prototype 1: 162 mm Si + alumine hybrid + alumine bus (V1) Prototype 2: 162 mm Si + alumine hybrid + glass (D263) bus (V1) Prototype 3: 162 mm Si + alumine hybrid + alumine bus (V1) Prototype 4: 162 mm Si + alumine hybrid + glass (AF45) bus (V1) Prototype 5: 162 mm Si + alumine hybrid + carbon bus (V1) Prototype 6: 162 mm Si + alumine hybrid + silicon bus (V1) 5.2 Material matching

Tests with lN 2 Alumine bus - prototype module seen from the side at lN 2 temperature Glass bus - prototype module seen from the side at lN 2 temperature The silicon detectors did not break!!!

Thermal expansion coefficients: Capton~30 ppm/K Alumine ppm/K Glass D ppm/K Glass AF ppm/K Carbon2.1 ppm/K Silicon ppm/K (~40µ deviation) Bus: Produced on 200mm Si wafer (400µ) Chr-Al-Ti-Ni-Au on 10µ polyimide (bonding tests!) Laser-cutting NEW!

Precision: <100µm over the full detector length required (164 mm) Align the detectors to one reference line on one jig no alignment in z required! Microscope reference: n+ implantation edge 6. Module Construction

1. Align first detector to setup

2. Align second detector to referene line measure deviation over full length Distance piece for bus Reference line

3. Apply glue Weigh the two components (Mettler-Toledo)

4. Bus mounted control if pads on detector and bus are well alined mount fixation (recheck alignment) Remove chuck from alignment station (store 24 hours)

Cals put onto lense-paper on top of the bus (1.125 kg)

5. Gluing jig for hybrids

5. Bonding

Built 37 modules in 24 days hours work on the alignment setup per module Parallel work on the hybrid mounting (0/0) n+ implant edge