Technology Department. ZS Ion Trap Development G. Raffaele and R.A. Barlow Acknowledgements: B. Balhan, M.J. Barnes and B. Pinget 21/04/2015 TCM: ZS Ion.

Slides:



Advertisements
Similar presentations
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Advertisements

Designing a EMC Compatible Electronic Meter using AD7755 a.
Atomic Emission Spectroscopy
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 20 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits and.
Field Emission Measurements with CERN DC-Spark System Tomoko MURANAKA Hebrew University / CERN.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Problem Solving Part 2 Resonance.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
Characterization of the electrical response of Micromegas detectors to spark processes. J.Galan CEA-Saclay/Irfu For the RD51 meeting.
CERN DC Spark System Capabilities Anders Korsbäck, BE-RF-LRF University of Helsinki.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Introduction to beam impedance O.Berrig 23/
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
SQUID Performance in a HV Environment
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
A mass-purification method for REX beams
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
THE LHC INJECTORS UPGRADE (“LIU”) PROJECT R. Garoby for the LIU Project Team LIU-2011November 25, 2011CERN.
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
LIU and (E)YETS LIU-SPS Coordination Meeting 28/01/15 David Mcfarlane
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
DC Spark Developments Nick Shipman - Thursday, 16 August
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
SEPTA and spares follow-up J. Borburgh for SEpta section.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
POTENTIAL EN-MME DESIGN JOBS IDENTIFIED BUT CURRENTLY NO REQUEST FROM EQUIPMENT OWNERS TO EN-MME EDMS B.RIFFAUD On behalf of EN-MME design team.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
Managed by UT-Battelle for the Department of Energy Vector Control Algorithm for Efficient Fan-out RF Power Distribution Yoon W. Kang SNS/ORNL Fifth CW.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
TILC Electron Source Update A. Brachmann, J. Sheppard, F. Zhou -SLAC – M. Poelker - Jlab - TILC, Tsukuba, April 2009.
RF measurements during floating MD in Week 40 3 rd of October 2012 LIU-SPS BD WG 25/10/2012 Participants: T. Argyropoulos, H. Bartosik, T. Bohl, J. Esteban.
1 CAN WE KEEP THE CURRENT SYSTEM FOR LIU BEAMS ? Francesco Cerutti, Alessio Mereghetti, Joao Saraiva LIU-SPS Beam Scraping System Review 2013 Jan 22 contributions.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
Copyright © 2009 Pearson Education, Inc. E Determined from V.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
Introduction High Voltage!!.
CT Hardware Overview and Issues
Sparking of SPS electrostatic septa in presence of e-cloud
MECH 373 Instrumentation and Measurements
EC Activities Status for the LIU
LIU–PLI report LIU SPS meeting.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Possible causes for SPS ZS2 misalignment
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
Hao Zhai, Hao Yi, Zhirong Zeng, Zhenxiong Wang, Feng Wang, Fang Zhuo
Special Magnets Controls
Impedance working group update
TPC Paul Colas Technical meeting, Lyon.
Also on behalf of V. Senaj & L. Ducimetière
Perturbation of Focusing Field Profile due to HV Support Tube
Wednesday 14:30 Fill 2011 dumped.
Presentation transcript:

Technology Department

ZS Ion Trap Development G. Raffaele and R.A. Barlow Acknowledgements: B. Balhan, M.J. Barnes and B. Pinget 21/04/2015 TCM: ZS Ion Trap HV Box 2 TE - ABT

21/04/2015 TCM: ZS Ion Trap HV Box 3 TE - ABT Content Present system and why upgrade Specification and Gantt Chart SPS ZS HV breakdown signals collection PSpice electrical modelling studies New ion trap HV box design

21/04/2015 TCM: ZS Ion Trap HV Box 4 TE - ABT  The ZS has sparked since introducing LHC type beam. High spark rates damage the ZS and reduce their lifetime. [1]  ZS outgassing represents another important limiting factor affecting the vacuum. It depends strongly on beam parameters, especially the bunch length. [1]  In 2011 the cathode power supply was set to -100kV in order to reduce sparking. It makes difficult to achieve fast multi-cycling due to the high voltage and long equivalent time constant of the system (~8s). [2]  A system of interlocks is needed to guarantee reliability. Present system and why upgrade Influencing factors  Beam parameters  ZS main electric field and ion trap fields  Electron cloud  System impedance (image current)  Scrubbing and surface conditioning (beneficial).

21/04/2015 TCM: ZS Ion Trap HV Box 5 TE - ABT Specification and Gantt Chart  An official document is located in EDMS ( ) concerning the technical specification for the new Ion trap HV box design.  A Gantt Chart has been devised to provide a roadmap for the design process.

21/04/2015 TCM: ZS Ion Trap HV Box 6 TE - ABT HV breakdown signals collection An official document is located in EDMS ( ) providing an overview of the HV breakdown signals collected in BA2 (ZS1 and ZS2), BA6 ZS6 and in the 867 ZS test bench during LS1 (Jan. 2015).  Cathode waveforms do not change significantly in BA2 and BA6, suggesting the occurrence of cathode sparks with different kinds of anode coupling.  Despite grounded anode, waveforms could still be observed on the anode sensing circuit.  The anode sensing circuit in 867 is provided with a 1:25 attenuator since signals collected show a higher amplitude w.r.t. those measured in BA2 and BA6. Possibly it is due to the effect of the length of the cables.  Signals collected in 867 display rapid oscillations both on the cathode and on the anode sensing circuit. It is mainly due to the effect of the cable length and possible source and/or load impedance mismatch.  Extremely difficult to deduce relationships between measured waveforms and operational conditions of the ZS and Ion trap system.

21/04/2015 TCM: ZS Ion Trap HV Box 7 TE - ABT PSpice electrical modelling studies COUPLINGMODELCOUPLINGMODEL

21/04/2015 TCM: ZS Ion Trap HV Box 8 TE - ABT PSpice electrical modelling studies

21/04/2015 TCM: ZS Ion Trap HV Box 9 TE - ABT PSpice electrical modelling studies  The achieved coupling model is speculative, but however demonstrates reliable empirical results: the same topology is used for each kind of spark event and it is possible to reproduce some of the real world measurements through careful choice of component values.  Very interesting scientific paper: “High Voltage vacuum discharge characteristics” [3] suggests the occurrence of a pinched plasma column during the breakdown event. An inductive component is to be taken in to account which could be related to the coupling model devised for the ZS.  System model seems to be reliable to evaluate effects of hardware modifications for the Ion trap. Actions  Collect more signals in BA2 (especially for ZS3, ZS4 and ZS5), BA6 and 867 when possible.  Cable analysis with vector signal analyzer.  Source/Load impedance mismatch to be investigated.

21/04/2015 TCM: ZS Ion Trap HV Box 10 TE - ABT New Ion trap HV box design  Experience from the past showed that the redesign of the Ion Trap circuit was tricky: several ZS damaged despite good results in the lab [4].  New version of HV box circuit is being devised and candidate components identified.  A test bench is set up (HV cage1 lab, 865-2D-17) with a spare HV box.  An FSU job is to be planned to suits the need for new hardware. Improvements planned:  Anode grounding.  Reduce Ion trap 1MΩ impedance.  Umon up and Umon down signals to be acquired.  Spark Ion trap up and spark Ion trap down signals to be acquired.  Oil suppression. NEW SIGNALS ACQUISITION IMPEDANCE REDUCTION ALARA

21/04/2015 TCM: ZS Ion Trap HV Box 11 TE - ABT References  [1] – M.J. Barnes, “LIU-SPS ZS Electrostatic Septum Upgrade Review”,  [2] – B. Balhan, “Design and operation of existing ZS”, LIU meeting  [3] – S.K. Handel, F.R. Nordhage, “High voltage vacuum discharge characteristics”, European Physical Journal of Applied Physics n.15/2001 (pp ).  [4] – J. Borburgh, “Possible ZS improvements”, LIU meeting