HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008.

Slides:



Advertisements
Similar presentations
HBD HV Control and Monitoring System HV, P/T and Gain Variations Manuel Proissl HBD Meeting 04/06/2010.
Advertisements

Measuring Cosmic Ray Flux with a trigger and CAMAC readout - Page 1 Connect the Fluke 415 HV supply output to the input of the voltage distribution box.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 2 – Manuel Proissl HBD Meeting 06/23/2009.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.
HV system migration to USB interface Presented by Korolev M.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
HBD Operation in Run 9 Thomas K Hemmick for the HBD Crew.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
HBD HV Control and Monitoring System A Gain vs. HV study throughout Run-9 – PART 1 – Manuel Proissl HBD Meeting 06/16/2009.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
HBD HV Control and Monitoring System INSTALLATION Manuel Proissl HBD Meeting 11/18/2008.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
1 HBD HV Status Update Jason for the HBD crew Jan 30, 2007.
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
1 HBD Update Itzhak Tserruya DC meetingJune 10, 2009 June 10, 2009.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 09/30/2008.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
The Adventures of Sparky LeCroy TK Hemmick for the Stony Brook Crew and Maxim.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
HBD HV Control System Development Manuel Proissl HBD Meeting 09/18/2007.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 03/04/2008.
Suppress our data? Deepali and Takao. Issue now Event size for HBD is large at HV=3500V –Is not very much appreciated. –Needs to set higher zero-suppression.
1 HBD Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
HBD HV Control and Monitoring System RUN-9 UPDATE Manuel Proissl HBD Meeting 04/08/2009.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
ElComandante An ELaborate Computer Operated Modular Accessible Nested Data Aggregation Network Testing Environment.
Baby-Mind SiPM Front End Electronics
G.Thomas & D.Davids (CERN) & O.Holme (ETH Zurich)
BNL electronics: first tests
Large CMS GEM with APV & SRS electronics
Pierluigi Paolucci - I.N.F.N. Naples
Programs for the calibration of TOF measurement with the new pulser
Presentation transcript:

HBD HV Control and Monitoring System RESISTORS, CALIBRATION & CO. Manuel Proissl HBD Meeting 12/23/2008

OUTLINE  Project: dV = 0 Step 1: Calibration of LeCroy PS Step 2: Resistors on Divider Step 3: Mesh Voltage Sweep vs. ADC Readout  Project Progress Calibration Routine / Curves  Calibration Program in HV Control  Divider(s) Resistor Measurements on HBD  Cable Coding (…)  Coming Up Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23 rd, 2008 HBD HV Control & Monitoring System Manuel Proissl Page 2 of 6

PROJECT: dV = 0  Step 1: In order to accomplish the project’s goal, the fundamental prerequisite is knowing the ACTUAL voltage we’re applying… Issue:Difference between DV, MV (mainframe) & actual voltage supplied Solution:Calibration Curves for all channels  Step 2: What voltage ends up being supplied to the GEM/Mesh? Issue:Resistor values only known by color code (…) Solution:Measurement of all resistors installed on divider board  Step 3: What is going to be The Mesh Voltage for RB?  Issue:Who knows?  Solution:1+1 Mesh Voltage Sweep during +/- config and ADC readout files for every sweep voltage  analysis  peak of PE vs. Mesh V. HBD HV Control & Monitoring System Manuel Proissl Page 3 of 6 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23 rd, 2008

PROJECT PROGRESS  Under IR Access > MF Calibration, HV Control runs a calibration procedure automatically for every channel, while the Fluke via divider records every second (FlukeView) the output voltage of the particular channel on the LeCroy  After initial non-linearity problems (unknown current development), further calibration work will be done (…)  ALL resistors have been measured with Fluke in nS through FlukeView with 20 stable events each for average calculation These will be out shortly… available in the hvdb database  ALL take-out resistors have been labeled with an unique position code From now on, any future changes can be done safely without any mix-up! HBD HV Control & Monitoring System Manuel Proissl Page 4 of 6 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23 rd, 2008

THE RESISTOR CODEC HBD HV Control & Monitoring System Manuel Proissl Page 5 of 6 EW View from IR Front ES3 ES4 ES5 EN3EN5 EN4 WS3 WS4 WS5 WN3WN5 WN4 ES1 ES2 EN2 EN1 WS1 WS2 WN2 WN1 SNSN Resistor ID Code HV Box (1-8) Module Num. (1-5) GEM (T, M, B) Layer (1-3) Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23 rd, 2008

COMING UP  Resistor Values into hvdb database Connecting to config system in HV Control HV remote testing until Jan 2 nd  Correction Curves for 1471N Calibration: new divider setup…  Distribution / Installation Files for Linux & XP/Vista Platform independence Final installation files with Installation Wizard  HV remote testing / system improvements until Jan 2 nd HAPPY HOLIDAYS!!! HBD HV Control & Monitoring System Manuel Proissl Page 6 of 6 Upgrades For Run9 | PHENIX, BNL HBD HV Control System HBD Meeting :: December 23 rd, 2008