Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University April 25 2012 KILC12 大邱廣域市 Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,

Slides:



Advertisements
Similar presentations
A Capture Section Design for the CLIC Positron Source A. VIVOLI* Thanks to: L. RINOLFI (CERN) R. CHEHAB (IPNL & LAL / IN2P3-CNRS) O. DADOUN, P. LEPERCQ,
Advertisements

Overview of 300 Hz Conventional e + Source for ILC Truly Conventional Collaboration ANL, IHEP, Hiroshima U, U of Tokyo, KEK, DESY, U of Hamburg NIM A672.
Status of the experiment at KEKB for the hybrid targets Junji Urakawa instead of T.Takahashi KEK Positron Workshop Durham 28 October 2009 First test of.
1 st October 2008 Réunion sur la contribution exceptionnelle de la FrancePositron generation L. Rinolfi (CERN) Contribution exceptionnelle de la France.
GRANULAR VS COMPACT POSITRON CONVERTERS:ADVANTAGES & APPLICATIONS TO HYBRID SOURCES X.Artru (IPNL), R.Chehab (IPNL), M.Chevallier (IPNL), O.Dadoun (LAL),
Introduction Simulation Results Conclusion Hybrid Source Studies Olivier Dadoun A. Variola, F. Poirier, I. Chaikovska,
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
R.Chehab/Posipol2008/Hiroshima, june POSITRON SOURCES USING CHANNELING FOR ILC & CLIC R.Chehab, X.Artru, M.Chevallier, IPNL/IN2P3/CNRS, Universite.
T-980 Crystal Collimation Recent Results T-980 Collaboration: FNAL, SLAC, BNL, CERN, PNPI, IHEP, INFN D. Still CM14 April 27, 2010.
Experiments on beam deflection by crystals Masataka IINUMA Department of Quantum Matter Graduate School of Advanced Sciences of Matter Hiroshima University.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University LCWS/ILC10 Beijing Collaborators: V. Strakhovenko O. Dadoun, R. Chehab, A.Variola,
Measurement of Gas Bremsstrahlung at the Pohang Light Source Hyosang Lee Seoul National University, Q2C Pusan National University, HANUL HNP2011.
1 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, --- BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima: T.Takahashi,
2015/10/261 Present members : KEK: J.Urakawa, T.Omori, T.Suwada, T.Kamitani, BINP, Novosibirsk :Pavel Logachev (BINP), V.M.Strakhovenko, --- Hiroshima:
1 Positron Target R&D at KEK Plan and Status AD&I Meeting 2009/8/27 KEK Hybrid Target Test at KEKB Linac Liquid Lead Target Test at ATF Linac Window Test.
Calibration of the new Particle Identification Detector (PID) Tom Jude, Derek Glazier, Dan Watts.
Assessing Single Crystal Diamond Quality
Radiation Dose for Targets T.Takahashi Hiroshima University.
PrimEx collaboration meeting Energy calibration of the Hall B bremsstrahlung tagging system using magnetic pair spectrometer S. Stepanyan (JLAB)
15 th October CLIC workshop The CLIC/ILC common issues for the sources Jim Clarke and Louis Rinolfi.
Overview of the GlueX Tagger and Photon Beamline..
Lecture 9: Inelastic Scattering and Excited States 2/10/2003 Inelastic scattering refers to the process in which energy is transferred to the target,
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
11/18/2016 Test beam studies of the W-Si tracking calorimeter for the PHENIX forward upgrade Y. Kwon, Yonsei Univ., PHENIX.
Hybrid Target R&D at KEK-LINAC T.Takahashi Hiroshima University 25 Septemer 2012 LCWS2012, Arlington, TX Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
Crystal channeling for electron/position beams T.Takahashi Hiroshima Univ. 28 May 2008 Nanobeam 2008 BINP.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University March 2011 ALPG11 Eugene Collaborators: V. Strakhovenko O. Dadoun, R. Chehab,
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
27 th May 2009 CLIC ACE meetingL. Rinolfi CLIC Main Beam generation Baseline configuration only L. Rinolfi for the CLIC Injector complex team.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
T.Takahashi Hiroshima /11/5 Tohru Takahashi Hiroshima University 高橋 徹 広島大学.
Performance Study of Pair-monitor 2009/06/30 Yutaro Sato Tohoku Univ.
Truly Conventional e + Source for ILC Special Thanks to Takahashi-san: About half of the slides are taken from Takahash-san's talk at ALCPG11 T. Omori.
A_RD_6: Study and optimization of the power deposition density in new positron targets Masanori Satoh (Accelerator Laboratory, KEK) On behalf of collaborators:
28 th August 2011 POSIPOL Workshop – IHEP-Beijing- ChinaL. Rinolfi Louis Rinolfi CLIC e + status.
CHANNELING 2014 COMPTE-RENDU R.CHEHAB R.Chehab/Channeling20141.
Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University 06 Se0temer 2012 POSIPOL2012 DESY Zeutzen Collaborators: V. Strakhovenko O. Dadoun,
R&D ON POSITRON AND ELECTRON BEAMS FOR FUTURE COLLIDERS R.CHEHAB (IPNL) On behalf of I.Chaikovska (LAL), H.Guler (LAL), P.Bambade (LAL), O.Bianco (LAL),
October, 2001 Hybrid Spectrometer for Single Crystal Studies at the Pulsed SNS: an update. n Principal features of the proposed hybrid spectrometer. n.
R.Chehab/FCPPL2010/Lyon1 AN HYBRID POSITRON SOURCE FOR ILC -Collaboration IN2P3-IHEP, with BINP, KEK, Hiroshima-U, CERN- X.Artru, R.Chehab, M.Chevallier.
Spin Tracking at the ILC Positron Source with PPS-Sim POSIPOL’11 V.Kovalenko POSIPOL’11 V. Kovalenko 1, G. Moortgat-Pick 1, S. Riemann 2, A. Ushakov 1.
ROBERT CHEHAB (IPNL/IN2P3/CNRS AND UNIVERSITE LYON 1) ON BEHALF OF ILC_IHEP_IPNL_POSITRON SOURCE GROUP ON BEHALF OF POSITRONS FOR LINEAR COLLIDERS: AN.
Recycler Injection with Carbon Foils Dave Johnson, Alexandr Drozhdin, Leonid Vorobiev September 8, 2010 Project X Collaboration Meeting.
R.Chehab/crystalcollim/Roma1 INTENSE PRODUCTION OF e+e- PAIRS WITH RADIATION FROM CRYSTALS Robert CHEHAB IPNL/IN2P3/CNRS and Université Lyon 1.
Research on a new crystal-assisted positron source for the ILC
T980 STATUS AND CHANGES FOR
Positron production rate vs incident electron beam energy for a tungsten target
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Test of Hybrid Target at KEKB LINAC
AN HYBRID POSITRON SOURCE USING CHANNELING FOR ILC
Status of the CLIC main beam injectors
CLIC e+ status Louis Rinolfi.
CLIC Main Beam Sources and their transfer lines
ILCDR08 10 July 2008 Plan of measuring cloud density in the solenoid field and in the quadrupole field K. Kanazawa (KEK)
REVIEW OF POSITRON SOURCE R&D FOR LINEAR COLLIDERS
Research on a new crystal-assisted positron source for the ILC
Research on a new crystal-assisted positron source for the ILC
Summary for the Sources working group
Parasitic Run Physics Simulations
CEPC Injector positron source
A POSITRON SOURCE USING CHANNELING IN CRYSTALS FOR LINEAR COLLIDERS
CEPC Injector positron source
T.Fujita, K.Umemori, K.Yoshida V.Ababiy, A.P.Potylitsin, I.E.Vnukov
Background Simulations at Fermilab
CEPC injector beam dynamics
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

Status of Hybrid target R&D at KEK-LINAC T.Takahashi Hiroshima University April KILC12 大邱廣域市 Collaborators: V. Strakhovenko O. Dadoun, R. Chehab, A.Variola, L. Rinolfi, O. Dadoun,T.Kamitani, T.Suwada, T.Omori, J.Urakawa,K.Furukawa, K.Umemori,M.Satoh,T.Sugimura,S.Kawada, T.Akagi, Y. Uesugi

Contents Status of previous experiments – ~ same as LCWS2011 Temperature measurement 2012 January Prospects

experimental site KEKB LINAC Switch yard 8 GeV e- ~ nc/bunch upto 25Hz single bunch After the earthquake: beam recovered to 3GeV 8 GeV operation expected later half of 2012

Setup 8GeV e-1mm W crystal Sweeping Magnet 0.96T 0.75m amorphous W 8 mm 18 mm Analyzing magnet 5 ~ 30MeV

pictures e- 8GeV W Crystal on the goniometer Sweeping magnet

pictures movable stage amorphous targets thermocoupoles attached back end

The data Hybrid Conventional e 8GeV sweep mag 1mm W Crystal on axis (aligned to the beam) off axis (not aligned to the beam ) e 8GeV amorphous W 1.75, 3.5, 5.25, 8, 18mm temperature at the end of the targets by thermocouples and infrared camera positrons from the target momentum analyzed 

positron yield (arb. unit) angle of crystal axis w.r.t. beam (mr) rot. in vertical plain e sweep mag 8 mm Rocking curve same for horizontal rotation Preliminary factor 3 enhancement

e+ yield amorphous thickness [mm] e+ detected [a.u] P=20MeV Need simulation for analyzing the magnet collimator, detector to evaluate e+ yeilds

Detector acceptance Simulation of the is in progress by Y.Uesugi

Detector acceptance Simulation of the is in progress by Y.Uesugi

simulation in progress Preliminary 18 mm conventional agreement of data and simulation look fine low acceptance e+/e- takes time for simulation

Temperature measurement w/ thermocouples back plane of amorphous target thermocouple approximately 1mm x 1mm to fast data logger read temperature each 10ms bunch by bunch temperature variation PEDD information by thermocouple temperature at equilibrium total energy deposit

Example of Temperature Measurement Temperature of the 8mm amorphous target for the hybrid case Time from Beam On (Minutes) Temperature (degree Celsius) Base temp ℃  T ~ 32 ℃ Preliminary

T vs total energy deposit hybrid on axis conventional 18mm 8mm T at equilibrium has information for total energy deposit except for 18mm hybrid target is thicker than shower max hybrid off axis T at equilibrium (deg) (simulation) (measured)

time, base T. adjustment 1sec

beam profiles crystalamorphous 3.2m  x=2.0mm  y=2.3 mm  x=0.42mm  y=1.54mm beam divergence  x ~ 0.5mr  y ~ 0.24mr PEDD estimation

bunch by bunch temp. dT provides a measure of PEDD hybrid on axis conventional hybrid off axis Simulation Measured

Making thermo couple array thermocouples temperature distribution of amorphous target bunch by bunch bases design in progress at Hiroshima

temperature measurement January 2012

temperature measurement

summary Systematic data for hybrid target R&D – yield from various target thickness – momentum 5, 10, 20 MeV – G4 Simulation in progress energy deposit/temperature – Thermocouple array works – in progress. G4 simulation is ready. – Systematic data in next experiments – ( but we need to wait for full recovery of KEKB LINAC)