Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project Collaborative Monitoring in the Great Lakes: Revisiting.

Slides:



Advertisements
Similar presentations
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Advertisements

Motivation for the Forum Coordination Tri-State Partnership (on-going cooperation) Tri-State Partnership (on-going cooperation) Corps Watershed Plan Corps.
Cooperative Science and Monitoring Initiative Status Update 2009 Great Lakes Regional Research & Information Network Chicago, IL November 3-4, 2009 John.
LAMP 101 Elizabeth LaPlante US Co-Chair, Superior Work Group US Environmental Protection Agency.
The Lake Allegan/Kalamazoo River Total Maximum Daily Load (TMDL) Plan Implementation by Jeff Spoelstra, Coordinator, Kalamazoo River Watershed Council.
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
Briefing to the Caribbean Fisheries Management Council April 23, 2014.
PROPOSED ROUGE RIVER WATERSHED ROUGE RIVER WATERSHED LOCAL MANAGEMENT ASSEMBLY LOCAL MANAGEMENT ASSEMBLY.
Montana’s 2007 Nonpoint Source Management Plan Robert Ray MT Dept Environmental Quality.
Great Lakes Monitoring Inventory and Gap Analysis: Recommendations for Addressing Shortfalls and Improving Monitoring Coordination in the Great Lakes Basin.
Great Lakes Regional Research Information Network Lake Michigan Coordination Team Brian K. Miller – Illinois-Indiana Sea Grant Jennifer Fackler – Illinois-Indiana.
Presentation Overview Introduction to the Great Lakes Commission The Commission’s Role in Seeking/Administering Grants Practical Advice in Seeking and.
Watershed Management Framework Mission of watershed management –Coordinate and integrate the programs, tools, and resources of multiple stakeholder groups.
International Workshop on Institutional Capacity Development in Transboundary Basins, November 2008, Bonn, Germany Governance and Institutional Arrangements.
National Water Quality Monitoring Network Design Alfred L. Korndoerfer, Jr. Karl Muessig.
Great Lakes Regional Research Information Network Lake Michigan Coordination Team Brian K. Miller – Illinois-Indiana Sea Grant Anders Andren – Wisconsin.
National Aquatic Resource Surveys National Coastal Condition Assessment – 2010 Sarah Lehmann.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Working to improve availability of plant materials for partner organizations Shannon Hatch DEVELOPMENT OF NATIVE PLANT MATERIALS FOR RIPARIAN RESTORATION.
National Water Quality Monitoring Council Recent Activities and Accomplishments: An Update for ACWI September, 2004.
SWRR on the Potomac Rhonda Kranz and John Wells Sustainable Water Resources Roundtable April 25, 2006 Measuring the Sustainability of Water Management.
Lake Huron Initiative: A Work in Process Presented by: Jim Bredin - Michigan Office of the Great Lakes.
Stock Assessment Peer Review: Findings and Actions Shannon Cass-Calay Caribbean Fishery Management Council April 2015 Southeast Fisheries Science Center.
Watershed Planning: Current Status and Next Steps
Activities of the National Water Quality Monitoring Council Gail Mallard, USGS NWQMC Meeting Phoenix, AZ, December 10, 2002.
SRRTTF Technical Activities Where We’ve Been, Where We’re Going Dave Dilks Spokane River Regional Toxics Task Force Workshop January 13,
Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project Collaborative Monitoring in the Great Lakes: Revisiting.
Integrated Regional Watershed Management Plan Presentation – March 12, 2013 HLVRCD.
U.S. Department of the Interior U.S. Geological Survey Dr. Robert M. Hirsch Associate Director for Water April 16, 2007 USGS: Water Resources Program.
1 Survey of the Nation’s Lakes Presentation at NALMS’ 25 th Annual International Symposium Nov. 10, 2005.
Integrated Regional Watershed Management Plan Presentation – November 21, 2013 HLVRCD.
November 7, 2013 WRAP Membership Meeting Denver, CO Tom Moore WRAP Air Quality Program Manager WESTAR Council.
Collaboration and Outreach Workgroup West Palm Beach November 2006.
History and Progress of DEQ’s Mercury Programs Albert E. Hindrichs.
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Benefits of the Redesigned RMP to Regional Board Decision Making Karen Taberski Regional Water Quality Control Board San Francisco Bay Region.
Who We Are What I Do Great Lakes Commission. Great Lakes Basin.
WRAP Update WESTAR Meeting San Francisco April 25, 2011.
Great Lakes Perspective Samuel W. Speck Chair, Water Management Working Group Council of Great Lakes Governors Chair, Great Lakes Commission Director,
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
Evaluating and Enhancing Lake Michigan Nearshore Monitoring John Hummer and Guan Wang Great Lakes Commission Summer Webinar July 24, 2013.
Information and transboundary cooperation – challenges and responses Francesca Bernardini United Nations Economic Commission for Europe.
NWQMC July 26, 2005 Developing A National Water Quality Monitoring Network Design.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
Increasing Momentum in the Formation of State and Regional Monitoring Councils Linda Green, co-chair, Collaboration and Outreach Workgroup, National Water.
Coordinating Monitoring in the Great Lakes Basin Ric Lawson Project Manager Great Lakes Commission National Water Quality Monitoring Council meeting Ann.
OHIO RIVER MONITORING AND ASSESSMENT Program Overview.
Wisconsin’s Nutrient Reduction Strategy for Water Quality Wisconsin Crop Management Conference January 16, 2014 Ken Genskow, PhD Associate Professor, Department.
Lake Michigan Coastal Program Coastal 101 – 2007 Edition.
Chesapeake Bay Program’s Baywide and Basinwide Monitoring Networks: Options for Adapting Monitoring Networks and Realigning Resources to Address Partner.
Proposition 1 Workshop: the Grant Application Process July 2015.
USGS Water Quality Programs and the Water Quality Monitoring Framework CONTACTS: Herb Buxton (609) Tim Miller
Kettle River Watershed Management Plan Stakeholder Advisory Group Meeting #3 – July 19, 2012.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Water Quality Monitoring in Michigan, : A Decade of Program Evolution By: Gerald Saalfeld, MI Department of Environmental Quality.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Status of WRAP Work Plan Tom Moore, WRAP September 19, 2002 WESTAR Fall Technical Conference.
Combining prediction and monitoring for reduction of toxics: the Lake Michigan Mass Balance Study Glenn Warren, Russell Kreis, and Paul Horvatin U.S. EPA,
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
Key Findings from May & July 2008 WRAP Technical Workshops September 30, 2008 Steve Arnold, Colorado DPHE & Bob Kotchenruther, EPA R10 (Co-Chairs, WRAP.
IMPLEMENTATION UPDATE Rice County Local Water Management Plan BOARD PRESENTATION JUNE 16, 2015.
TTWG Report & Technical Topics SRRTTF Meeting Dave Dilks March 16, 2016.
Bow Basin Watershed Management Plan Revised Terms of Reference
Task Force Activities We are working together on a new approach that identifies sources of PCBs and dioxins, directly applies a plan for reduction and.
Lake Erie Environmental Forum 4/19/2016
Watershed Literacy & Engagement
Great Lakes Wind Collaborative: Who We Are and What We Do
Water Quality Planning Division Monitoring & Assessment Section
Presentation transcript:

Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project Collaborative Monitoring in the Great Lakes: Revisiting the Lake Michigan Mass Balance Project John Hummer – Great Lakes Commission Charlie Peters – USGS WI Water Science Center Gary Kohlhepp – Michigan Department of Environmental Quality Steve Westenbroek – USGS WI Water Science Center Judy Beck – U.S. EPA Great Lakes National Program Office National Monitoring Conference May 10, 2006 San Jose, CA

Great Lakes Commission  Binational agency representing Great Lakes states and provinces  Formed in mid 1950s via U.S. state and federal law: provincial associate membership in 1999  Promotes the informed use, management and protection of the water and related natural resources of the Great Lakes Basin and St. Lawrence River

Great Lakes Hydrologic and Political Boundaries

Focus of talk  Lake Michigan Monitoring Coordination Council  Lake Michigan Tributary Monitoring Project Progress to Date Progress to Date Lessons Lessons

Two Issues 1. Information collected according to political boundaries rather than resource boundaries 2. Information collection agencies focused on narrow fields of study

Lake Michigan Monitoring Coordination Council (LMMCC) Background  Inaugural meeting September 1999  First Great Lakes council to be structured along watershed boundaries  Broad ecosystem approach -- not only water quality monitoring

  Serves as a regional forum to coordinate and support consistent, credible monitoring methods and strategies   Purpose: to define a regionally-coordinated agenda for Lake Michigan basin monitoring, with improved collaboration and data comparability   Great Lakes Commission provides technical & organizational support Council Background

 Council Objectives: Document activities, identify gaps and contribute to a monitoring plan for the basin Document activities, identify gaps and contribute to a monitoring plan for the basin Maintain collaborative partnerships Maintain collaborative partnerships Document data quality and comparability Document data quality and comparability Link basinwide information systems Link basinwide information systems Improve awareness of monitoring and Council products Improve awareness of monitoring and Council products

 State Tribal nations/associations (2)  Business, industry and consultants (2)  Agricultural groups (1)  Local volunteer or environmental groups (2)  Sea Grant Programs or university-based institutes (4)  Lake Michigan LaMP Forum (1)  Local government/planning agencies (4)  Great Lakes Fishery Commission (1)  Chair of LaMP Technical Coordinating Committee and Great Lakes Commission (ex-officio members)  agencies (8)  Federal agencies (7) Membership

Workgroups  Air  Aquatic Nuisance Species  Fisheries  Groundwater  Land Use  Collaboration and Outreach Technical coordination Technical coordination Communication/outreach Communication/outreach Workshop/ meeting planning Workshop/ meeting planning  Open Lake  Recreational Waters  Research  Tributaries  Wetlands  Wildlife

Coordinated Tributary Monitoring Goals  Evaluate/compare contaminant loadings from key tributaries  Compare loading rates with loading rates  Incorporate results into Lake Michigan Mass Balance (LMMB) model  Program support (Lake Michigan LaMP, RAPs, SOLEC)

Questions to ask?   What information is important to provide a 10- year snapshot of the LMMB?   Who collects LMMB parameter data?   How can we link ongoing monitoring with minimal new resources to achieve project objectives?   How best can we combine resources?

Development of Lake MI Tributary Monitoring Project  Looked at parameters of the Lake Michigan Mass Balance Study What monitoring parameters and site locations should be considered for this project?What monitoring parameters and site locations should be considered for this project?  Decided to propose a “10-year anniversary snapshot” for key Lake Michigan tributaries  Developed several monitoring options based upon funding availability and statistical viability

Workshop – June 2004  Determined potential monitoring locations and parameters in Lake Michigan for Discussed details of each option Discussed details of each option Finalized parameters to monitor Finalized parameters to monitor Compared specific monitoring protocols Compared specific monitoring protocols Began development of final plan for monitoring event – including site selection Began development of final plan for monitoring event – including site selection

Lake MI Tributary Monitoring Project Objectives  Characterize present-day water column PCB, nutrient, and mercury concentrations at five (5) of the original 11 Lake Michigan Mass Balance sampling sites.  Estimate mass loading for each of the five sampled Lake Michigan tributaries.  Estimate the uncertainty associated with each of the loading estimates.  Compare concentration and loading estimates with the Lake Michigan Mass Balance project. FUTURE WORK

1994 – 1995 Lake MI Mass Balance Tributary Monitoring Stations (12)

1994 – 1995 LMMB Mercury Loads

1994 – 1995 LMMB PCB Loads

Lake MI Tributary Monitoring Project Sites  Lower Fox (WI)  Indiana Harbor Canal (IN)  St. Joseph (MI)  Kalamazoo (MI)  Grand (MI)

Analytes Parameters:  Total PCB congeners (dissolved and particulate for Indiana and Wisconsin Sites)  Total Mercury (particulate and dissolved, total and methylmercury, Fox River only)  Nutrients and solids  Atrazine  trans-Nonachlor ELIMINATED TO MINIMIZE TOTAL PROJECT COST

Coordinated Tributary Monitoring Project Funding  Project Planning and Management In kind funding from USEPA, GLC, MI DEQ, USGS WI WSC In kind funding from USEPA, GLC, MI DEQ, USGS WI WSC  Michigan DEQ Monitoring November, 1998: Clean Michigan Initiative November, 1998: Clean Michigan Initiative For 2005, priorities realigned to allow 12 PCB and mercury samples from the 3 tributaries For 2005, priorities realigned to allow 12 PCB and mercury samples from the 3 tributaries  USGS Monitoring, Data Analyses and Reporting EPA GLNPO funds via Great Lakes Commission EPA GLNPO funds via Great Lakes Commission USGS Cooperative Water Program funds USGS Cooperative Water Program funds

Coordinated Tributary Monitoring Timeline  Project design (April 2004 – March 2005)  Sample collection (April 2005-July 2006)  Sample analysis (July 2005-October 2006)  Data analysis (August 2006-April 2007)  Draft report (June 2007)

Sample Volume and Timing of Collection PCB Sample Volumes:  Indiana Ship Canal: 80 L samples  Fox River: 80 L samples (summer)/ 160 L samples (winter)  St. Joseph, Kalamazoo, and Grand: 160 L samples Sample Timing:  Indiana Ship Canal: 100% scheduled  Fox, Grand, Kalamazoo and St. Joseph: 33% baseflow / 66% high flow

Progress to Date (April 2006)  Fox River: 7 samples / 1 duplicate / 1 blank  Indiana Ship Canal: 6 samples/ 1 duplicate / 1 blank Sampling at the Indiana and Wisconsin sites will be completed by the end of July, 2006 Sampling at the Indiana and Wisconsin sites will be completed by the end of July, 2006  St. Joseph, Kalamazoo, and Grand: 12 samples (complete)

Lessons Learned  Various management objectives require collection of information  Coordinate individual monitoring programs to meet additional objectives  Focus resources/personnel available to coordinate data collection, analysis and reporting  Partners must be willing to compromise (i.e. provide necessary in-kind support)  Central funding source can drive the process A bare-bones budget can still provide a status report on important parameters to measure water quality A bare-bones budget can still provide a status report on important parameters to measure water quality

For More Information  LMMCC website  John Hummer (GLC) or or  Charlie Peters (USGS) or or  Gary Kohlhepp (MDEQ) or or