Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN,

Slides:



Advertisements
Similar presentations
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013.
Advertisements

O. Pirotte, A.Perin, TE/CRG, 4 th LHC Splice Review, Page 2 4 th LHC Splice Review, July 22-24, 2013 O. Pirotte (TE-CRG), A. Perin (TE-CRG)
Cold Powering of the HL-LHC magnet system WP6 Motivation Work Package description Tasks Partners & resources Amalia Ballarino HL-LHC Design Study – 3 rd.
Improved anchoring of SSS with vacuum barrier to avoid displacement Ofelia Capatina (speaker), Katy Foraz (coordinates all the activities), Antonio Foreste,
February 2009 Summary of Chamonix 09 Steve Myers.
LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Quality control of LHC electrical interconnections to be produced during the 2009 shutdown Since the functional properties of the LHC electrical interconnections.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Overview of SMACC-QA 1.Recall of SMACC-QA organization 2.Tuning the procedures 3.Main results from the QC teams 4.Auditors findings Ranko Ostojic 23 July.
Status of SMACC-QA 1.Recently resolved issues 2.Update from QC teams 3.Statistics S56 and S67 4.Auditors findings 5.4th Splice Review – 22/24 July Ranko.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Alfa-Omega Team Coordination LS1 Collaboration Seminar, 27 th November 2014 Anna Chrul, IFJ PAN Kraków.
LHC machine Schedule, coordination & WAT K. Foraz March 22 nd, 2011 IMWG - LHC machine1.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Beam Vacuum Quality Control Outline  VSC consolidation  VSC support  Organization  Status Cédric Garion on behalf of TE-VSC Cédric Garion TE/VSC Beam.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Introduction to availability modelling in ELMAS Arto Niemi.
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
Technology Department 1 Visit to Hall 180: Presentation of the consolidation process Third LHC Splice Review, November 12, 2012.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
Session 6 - LHC Installation Chamonix XV January 2006 T.Pettersson EDMS: Installation – some issues.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project … Courtesy ….
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
Latest on the Schedule K. Foraz LMC October 7th, 2009 Wednesday, Oct. 7th 2009K. Foraz - LMC.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
Quality Assurance Overview Ranko Ostojic 12 Nov 2012.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
TE-CRG Activities D. Delikaris, TE-CRG.
Roberto Saban TS HC Review bis Outline  Interviews of all the Group Leaders loosely or tightly concerned by hardware commissioning proposing them.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
A. Perin, TE/CRG, DFBA LSC Page 2 LHC Long Shutdown 1 Committee June 14 th, 2013 A. Perin (TE-CRG) On behalf of the DFBA splices consolidation.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
LHC Risk Review Installation Progress Francesco Bertinelli – TE/MSC 5 March, 2009 (20 minutes) On behalf of - and with several contributions from – the.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
Third LHC Splices Review SMACC Organisation Scope of work (What’s new since Nov 2011) Organization chart update Human resources Budget Unforeseen? Unexpected?
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
First LHC Splice Review Introduction
CERN Construction Planning and Scheduling (LHC installation)
SMACC Tenth report [15 min] 13/09/2013
Installation of an Instrument on a CERN machine
Safety in Construction and Upgrade Phases
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
Cutting and welding First internal LHC Dipole Diode Insulation Consolidation Review 10 Oct 2017 G. Favre / A. Amorim Carvalho G. Favre EN-MME.
Long Shutdown for the LHC: Vacuum Beam Pipes
LHC-TS3 Coordination meeting #3
Consequences of warming-up a sector above 80 K
MPE main activities planned for LS2
Renovation of the 45-year old PS magnets
CRG activities for EYETS 2016
LS3 Study & Readiness Meetings
Presentation transcript:

Work Organisation for Splice Consolidation Francesco Bertinelli 20 minutes presentation, 10 minutes discussion: 12 slides First LHC Splice Review, CERN, October 18-22, 2010  The global picture: activities to be performed for splice consolidation  Planned resources and time schedule  Organisation of coordination and Quality Control

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 2 What activities are necessary?

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 3 What activities are involved for IC work?

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 4 (some) other activities involved before & after

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 5 How long will IC work take? The size of this new task compares to series production: will not require some activities (e.g. jumpers, N-line) … but will require to « undo » before « redoing » (e.g. cut welds, desolder, busbar surface machining): repair ≠ new on the good side: all magnets are in place (except if …) Resources used in IC series production: IEG (Main Contractor) ~100 workers activities were organised for 40 IC/week CERN ~100 workers for coordination, QC (including ELQA and VAC), troubleshooting, special activities years Resources used in IC shutdown: CERN ~100 workers

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 6 Series soldering experience 30 IC/week Courtesy P. Fessia

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 7 Duration of IC work  at 50 IC/week (!!!) for critical activities,  14 weeks for 1 st sector, 5 weeks later for 2 nd sector, 49 weeks for 8 sectors  2 shift work (on different activities), some overlap: 6h–10h/break/11h-15h 12h-16h/break/17h-21h  no learning curve, no built-in contingency, no account for holiday/closure periods  must work sequentially to adjacent sector, without access constraints (i.e. first cool-down and HWC powering)  big concern is the “other activities” to be done in parallel: more realistic is to consider an additional 2-3 months

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 8 Estimate of IC resources needed (i/ii)

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 9 Estimate of IC resources needed (ii/ii)  cf Chamonix 2010: respectively 46 and 72 for IC work alone  New consolidation activities (e.g. Surfacing busbars), more non-standard activities (within same time...)  Connected activities: Vacuum Cryo-thermometers Survey ELQA and QPS RP and general safety  “Missing resources” to be found inside CERN (e.g. stop of Injector operation), Project Associates, FSUs: need to start this commitment.

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 10 The current scenario  1 “train” only for standard activities  A Special Intervention team to prepare non-standard work before the arrival of the train

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli 11 Organisation  Magnet/interconnections work coordinators: between groups involved and with overall Shutdown coordination weekly meeting between groups continuous presence in tunnel 8h-12h30 to 13h30-18h  Quality Control (independent from production) and management of non-conformities: Specific to single electrical connections Specific to welding EN-MME Leak testing and ELQA overall integration to be organised / optimised Simplified traceability: recent contacts with MTF team

18 October, 2010 First LHC Splice Review - Work Organisation - F. Bertinelli Speed of work In the 300 K sectors 1-2, 3-4, 4-5, 5-6 and 6-7 we estimated the mean amount of work made per day and per team thanks to the date of welding: 12.2 splices/day. As for the bad splices observed with R16 measurements, the ratio is 30% higher: 15.9 splices/day. Hence a potential guideline for future work is to be attentive to the negative effect of high production speed on quality. ANALYSIS OF 13 kA MAGNET INTERCONNECTION SPLICE QUALITY WITH RESPECT TO PRODUCTION TRACEABILITY F. Bertinelli, C. Lorin, E. Todesco / TE Department Internal Note Speed warning …