Carmen A. Medina-apparently recovering from pneumonia-but you can also find her on recoveringfed.com and follow her on

Slides:



Advertisements
Similar presentations
1 Joint U.S.-Canada Power System Outage Investigation Interim Report Causes of the August 14 th Blackout in the United States and Canada.
Advertisements

Prof Dr NAGWA El HOSSEINY
Business Plug-In B4 MIS Infrastructures.
Reliability of the electrical service Business Continuity Management Business Impact Analysis (BIA) Critical ITC Services Minimum Business Continuity Objective.
Empowering Excellence in Real-Time Business Performance Tyler Bryson | General Manager | Microsoft.
Utility Management Providence Health System - Oregon Environment of Care.
Preparing for Power Outages Like any other part of the infrastructure, electrical power to the campus can fail, either as an isolated incident (e.g., tripped.
Leadership and HRO Becoming the Culture We Want.
Emergency Preparedness
The Mathematics of the Great U.S. Blackout August 14, 2003 Ralph Fehr, P.E. Engineering Consultant.
Recovery Planning A Holistic View Adam Backman, President White Star Software
August 14, 2003 Blackout Final Report
1539pk 2003 MAJOR POWER GRID BLACKOUTS IN NORTH AMERICA AND EUROPE Copyright © P. Kundur This material should not be used without the author's consent.
A Brief Guide to the Management of Building Waste in Emergencies DRAFT 1.
Service Design – Section 4.4 – Availability Management.
1 Procedural Analysis or structured approach. 2 Sometimes known as Analytic Induction Used more commonly in evaluation and policy studies. Uses a set.
Northwestern University Information Technology System Management Issues for the Future Real-Time University Environment Tom Board September 22, 2004 Northwestern.
Lesson 18-Internet Architecture. Overview Internet services. Develop a communications architecture. Design a demilitarized zone. Understand network address.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
September 2014 Lesson Learned Summary. September 2014 LLs 2 Three NERC lessons learned (LL) were published in September 2014 LL Redundant Network.
Introduction to Classroom Management Pertemuan 1 s.d 2 Matakuliah: G0454/Class Management & Education Media Tahun: 2006.
Oracle Database Administration. Rana Almurshed 2 course objective After completing this course you should be able to: install, create and administrate.
Getting the electricity from the plant to the light switch
IT Outsourcing Chad Doiron / Michael Saunders April, 2007.
Introduction to ModelingMonte Carlo Simulation Expensive Not always practical Time consuming Impossible for all situations Can be complex Cons Pros Experience.
Cloud Computing How secure is it? Author: Marziyeh Arabnejad Revised/Edited: James Childress April 2014 Tandy School of Computer Science.
1 Blackout 2003 See:
August 14 th NE Blackout and Common Roots of Blackouts Damir Novosel, PhD President KEMA Inc., T&D Consulting BLACKOUT AMERICANO E ITALIANO:
Chapter 8.  Network Management  Organization Management  Risk Assessment & Management  Service Management  Performance Management  Problem Management.
BLACKOUT POWER OUTAGE By Masih Madayeni Class 3/6 English Presentation.
1 Fault Tolerance in the Nonstop Cyclone System By Scott Chan Robert Jardine Presented by Phuc Nguyen.
San Francisco, CA 10/17/2012 Beyond the patient: Studying whole healthcare systems using claims data.
Dale Carnegie Training ® ISO-405-PD-EV-1503-V1.1 Mentoring : Creating a Partnership.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
Figures – Chapter 14. Figure 14.1 System layers where security may be compromised.
Fundamentals of Information Systems, Third Edition2 Principles and Learning Objectives Artificial intelligence systems form a broad and diverse set of.
hydroAMP asset management framework
4S-1 Chapter 4S Reliability –The ability of a product, part, or system to perform its intended function under a prescribed set of conditions –Reliability.
Clinical Application. The Problem Clinical Systems are extremely complex IT configures and deploys best practices (best guesses) about what users want.
Mission Critical Application Architecture and Flash August MDCFUG Chafic Kazoun, Founder and CTO Atellis: | Weblog:
1 Chapter Overview Managing Object and Container Permissions Locating and Moving Active Directory Objects Delegating Control Troubleshooting Active Directory.
Adaptive Leadership in collaborations Liz Skelton Director: Collaboration for Impact & The Adaptive Practice 20th October 2015.
NERC Lessons Learned Summary LLs Published in September 2015.
IT-Secrurity Cookbook Enter your login: Enter your password:
S ystems Analysis Laboratory Helsinki University of Technology 1 Decision Analysis Raimo P. Hämäläinen Systems Analysis Laboratory Helsinki University.
Standby-redundancy-models.PPT Building Standby Redundancy Models Last revised 12/06/2006.
Network management Network management refers to the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance,
VDI AND DAAS – SAY WHAT?!? Bob Marshall, MD MPH MISM FAAFP Faculty, Valley Family Medicine Residency Faculty, DoD Clinical Informatics Fellowship.
Jennifer Rexford Fall 2010 (TTh 1:30-2:50 in COS 302) COS 561: Advanced Computer Networks Energy.
Welcome to Business Lincolnshire Business Continuity e-awareness Follow the team as they find out more about what Business Continuity is and what they.
Taking your Business Technology Further. First Communications: At A Glance Technology Provider since 1998, serving thousands of Businesses throughout.
Business Continuity Awareness Steve Lambert Biscon Planning Ltd.
Cascading failures of loads in interconnected networks under intentional attack Yongxiang Xia Department of Information Science and Electronic Engineering.
Recovery from the earthquake Takashi Sasaki. Disaster recovery “Disaster” comes from human error or hardware failure was considered before We were preparing.
Roads to Resilience?!.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Rebuilding Trust after Fukushima Christopher Hobson Assistant Professor, Waseda University Web:
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
PERSPECTIVE OF HUMAN RESOURCE MANAGEMENT
IT Service Transition – purpose and processes
System Management Issues for the Future Real-Time University Environment Tom Board September 22, 2004 Northwestern University Information Technology.
Oracle Database Administration
Points To Consider While Buying Data Center Services In 2018.
D-Link Router Customer Care Number
PREVENTIVE MAINTENANCE By: Mary Solomon Inyang. DEFINITIONS Preventive maintenance refers to regular, routine maintenance to help keep equipment up and.
Joint U.S.-Canada Power System Outage Investigation
Chapter 7 System Protection
Pacific Power Seismic Preparedness Update
Transformers No not these guys…...
Move your data to the cloud with Azure Social media graphics
Presentation transcript:

Carmen A. Medina-apparently recovering from pneumonia-but you can also find her on recoveringfed.com and follow her on

Are determined to avoid failure, so they think about failure a lot. They study it carefully when it happens. Do not simplify easily or prematurely. They're OK with messy. They worry more about jumping to conclusions. Are designed for resilience--multiple eyes, 360 degrees awareness. Are operations and process-oriented. They care about the means--the ends can never justify the means because you are always striving to identify predictable, reliable causal relationships. Defer to knowledge and expertise, i.e. not just to organizational relationships and hierarchy. High Reliability, High Risk Organizations....

from mikerbaker.com

1215: MISO operator forgets to turn the STATE ESTIMATOR back on. THINKING THE SYSTEM HAS BEEN SUCCESSFULLY RESTORED, THE ANALYST WENT TO LUNCH. 1331: EASTLAKE 5 OHIO GENERATION PLANT TRIPS AND SHUTS DOWN. 1402: The STUART/ATLANTA LINE FAILS 1420: REMOTE CONSOLES BEGIN TO FAIL. IT STAFF PAGED. 1414:FIRST ENERGY'S ALARM AND LOGGING SOFTWARE FAILS. 1427: STAR/SOUTH CANTON LINE TRIPS. 1441: PRIMARY SERVER FAILS AT FIRST ENERGY. IT STAFF PAGED. 1454: BACKUP SERVER FAILS AT FIRST ENERGY. IT STAFF PAGED. 1505: THE THIRD LINE, THE HARDING/CHAMBERLAIN LINE, FAILS due to tree contact. 1532: THE HANNA/JUNIPER LINE SAGS INTO A TREE AND FAILS. 1541: THE STAR/SOUTH CANTON LINE, OWNED BY FE AND AEP, FAILS AND BLOWS A CIRCUIT BREAKER CONNECTING THE TWO GRIDS. MANY OTHER LINES FAIL. 1546: THE TIDD/CANTON CENTRAL LINE TRIPS. 1605:57: THE SAMMIS/STAR LINE FAILS.

Cleveland must be sacrificed!!!!!

Dealing with the Normal Dealing with Complexity Reducing Redundancy Promoting Ownership Modeling Success and Failure Utilizing Spare Capacity Making Better Use of Talent Seeing the Whole

Dealing with the Unusual Sensitive to Weak Signals Accommodate Irrationality Exercise Emergencies

Dealing with Knowledge Reduce mental errors Create Exponential Wisdom Weakest Links?

There are Downsides... New styles for managers New types of employees New roles and expectations New performance metrics, system analytics Theoretical Deficiencies

Comprehensive Diverse Redundant Scaleable Quick and Agile Transparent Preferred Qualities of Terrorism Threat Analysis