9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Status of DCS for TDAQ racks Y. Ermoline et al. ATLAS TDAQ Week, CERN, 27 April 2005.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
Ivan Pogrebnyak Supervisors: Paramonov, Drake, Proudfoot ATLAS, MSU, Argonne Tile week upgrade session June 10, 2015 TileCal requirements for ELMB upgrade.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
19/2/2002Ivan Hruska EP/ATE LV power supply for TILECAL News –Market survey is close to the final state PS requirements for whole box Bricks specification.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
ECFA Sep 2004Paul Dauncey - CALICE Readout1 CALICE ECAL Readout Status Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Status of NA62 straw electronics Webs Covers Services Readout.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Chris Booth Sheffield 29th March 2006
LKr status R. Fantechi.
FTK infrastructure in USA15 Status and plans for 2015 A
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
T1 Electronic status Conclusions Electronics Cards:
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Mini-drawers, FE-ASIC , Integrator
G. Carboni for the Muon Group
Electronics: Demod + 4Q FE
University of California Los Angeles
Presentation transcript:

9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary for production Next few pieces with implemented changes ordered LV supply prototyping

9/12/2003Ivan Hruska2 Remote control PCB –Designed in July ’03 Readout via ELMB Control via current loops & ELMB DAC Central clock for converters –Components already assembled –6 layer PCB LV supply prototyping

9/12/2003Ivan Hruska3 Fuse holder PCB –Assembled –Ready –Distributes 200VDC to bricks LV supply prototyping

9/12/2003Ivan Hruska4 LV supply prototyping Box assembly –All PCBs fits the box –Cabling work have started

9/12/2003Ivan Hruska5 LV supply prototyping Next steps & needs –Box mechanics Final design in progress Next few pieces ~ 1 month Full production 300 boxes ~ 2 months to deliver from the order Price of box mechanics incl. heatsink max. 250CHF

9/12/2003Ivan Hruska6 LV supply prototyping Next steps & needs – cont. –DCDC converter bricks Ready to debug & “bring it to the work” Work already started –Transformers One sample of new type ready Needs redesign of PCB for 3.3V version Looking for the best technology to cut out secondary windings –ELMB motherboard Ready to test functions Francisca will start software test 22 nd of Sept. Need to design converter clock transmitter Need to build the “USA15 like” infrastructure

9/12/2003Ivan Hruska7 LV supply prototyping Next steps & needs – cont. –Cabling of box In progress ( work is done by Z. Kotek ) Output will be: –Pinout of connector –Cable descriptions - documentation

9/12/2003Ivan Hruska8 Fuse holder PCB –Assembled –Ready –Distributes 200VDC to bricks LV supply prototyping

9/12/2003Ivan Hruska9 LV supply – technical questions “Sense” wires –We have to see what is the voltage inside drawer especially most current consuming channels –Drawer “sense” wiring is independent from LV box –We should not use the “sense” wires for LV brick feedback ! DANGER !

9/12/2003Ivan Hruska10 LV supply – technical questions Technical problem –Leak of residual water from connector to the electronics –Cannot be fitted by box or its components –Possible solutions: Sponge around connector Blotter paper Fixed tubes and connectors outside of box

9/12/2003Ivan Hruska11 LV supply pre-series 100 bricks production –Components ordered –PCB needs changes till the end of September to reach 15 Oct start of assembly –Alumina bars confirmed for middle of October –Transformers ? –Production ready first week of November 12 Remote control boards –Design phase – prototype ready to test –End of September should be tested –Changes necessary –End of october could be ready 12 Fuse boards –Ready –No problem to produce 12 pieces in one week

9/12/2003Ivan Hruska12 LV supply pre-series 12 Boxes –Estimation of time of delivery – End of October Cabling of boxes –In development –12 sets of cables should be ready within 3 weeks since approval –1 week to cable all boxes Cabling of drawers –Repining of connectors –Adding of 200V connector, aux connector & CANbus connector Emulated USA15 infrastructure –Need to be developed and produced Distribution boxes Clock source Current sources Power supplies Software

9/12/2003Ivan Hruska13 LV supply pre-series Putting things together –Bricks Burn-in necessary to do in the oven Test setup needed for 8 – 10 bricks test in parallel –Must be designed –Final mount –Box test Dummy load ready Test setup should be designed 6 hours of run with 130% of nominal load is minimum

9/12/2003Ivan Hruska14 LV supply for TILECAL What is the goal of project ? –256 working LV boxes in the pit –10 years of reliable operation Reliability – High level of quality of design & production LV box pre-series for cosmic test –Nice but delay for final solution –Could lead to lower reliability of result

9/12/2003Ivan Hruska15 LV supply for TILECAL Schedule in MS Project –Still lot of unknown responsibilities –Unknown dates of delivery and production of some pieces –Most of the points based on estimations –Don’t forget about complexity of system, brick is not only the part !

9/12/2003Ivan Hruska16 HV comments TRACO news –8 TRACOs dead during 2 years –TRACO company agrees that problem is on theirs side –They started to produce so called “2003 series” which is based on our experience and fulfills specs –No will to replace TRACOs used in HV supply for free –But statistics ( 8 pieces from 280 wrong during 2 years) enables to use HV supplies as they are with standard spare procedure and then repair damaged card by new version.