Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

The Friendly Weapon Be prepared....
Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
EMCal DCS and related Issues with Shutdown/Installation B. S. Nilsen M. Cherney J. Fujita.
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
Status of Electronics and Control System P J Smith University of Sheffield 20 th August 2009.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Phase Difference = Phase Difference = 0.05.
Proton Source Workshop December 7 & 8, 2010 John Reid December 8, 2010.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
General improvements Upgrades Loose collection of items Changed – being changed – to be changed CTF3 working meeting10/02/121.
Take 5 for Safety E. Lessard April 14, Power Disturbance on Sixteen 3-Phase Motors Failed due to “Single Phasing” 2 Arrow pointing to.
Linac Marx Modulator Update Trevor Butler 7/22/2015.
Bipolar Transistor Review
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Booster 15Hz Operation John Reid March 4, Fermilab March 4, 2014J. Reid 2 Scope Brief History of Booster RF systems RF system description Modifications.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Eastern VHF Conf. 4/2006 W2SZ/1 (The MGEF) R. L. Frey - WA2AAU 70 Watts CHEAP !! On 2304 MHz 70 WattsCHEAP !! On 2304 Modifying A 1900 MHz PCS Amplifier.
Booster Bias Supply Upgrade March 13, Three New Ferrite Bias Supplies Two are working and installed. One in MI station #5, one in Booster station.
CSFL upgrade – status report. Purchased parts/ spares Red and white heat shrinks, Kapton tape, flat cable, spare diodes.
PIP Update Feb 11 th Agenda Summary Update – Current Activities – Updates (Tom Kubicki) – Additional Meetings/Notes.
HBD HV Control and Monitoring System PHENIX Manuel Proissl HBD Meeting 12/09/2008.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
PIP Update June 3 rd Agenda Summary Update – Current Activities – Updates Ken Domann – Budget & Schedule Ryan Crawford – Anode Supply Update – Additional.
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire SSD/SDD Proposal Upgrade 30/08/2012
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Detector Status J. Brunner 12/09/2014. Highlights Line 3 Optical Margins Line 5 UPS Situation Data Taking Status Planned Operations.
Design and Detailed Plan for In Vacuum Diamond Sensor for PHIL and ATF2 S. Liu, P. Bambade, F. Bogard, P. Cornebise, I. Khvastnov, H. Monard, C. Sylvia.
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
Booster Bias Supply and Cavity Upgrade November 16 th, 2011.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Upgrade Infrastructure Workshop Calorimeter upgrade Infrastructure Cooling – piping Frédéric Machefert Laboratoire de l'Accélérateur Linéaire.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
August 2007 Booster RF Upgrades J.Reid Booster RF Upgrades West Gallery LCW modifications: – Headers in select locations to be upgraded by.
PIP Update March 6 th Agenda Summary Update – Current Activities/Updates – Startup Schedule Highlights – Upcoming Talks, Reports, Meetings Updates/Talks:
Faculty of Physics, University of Belgrade General meeting, Wroclaw 28 th of January, ToF-L/R HV Upgrade, Status and Plans Jovan Puzović, Faculty.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
650 MHz Solid State RF Power development at RRCAT
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
ILCTA-MDB RF Power Status 4/27/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power 3.9 GHz RF Power Meson Detector Building April 27, 2006 [John Reid]
DESIGN STUDY November 28 th - 30 th 2005First EURISOL Design Study TOWN MEETING High Power RF Amplifiers Development at LNL Fabio Scarpa - INFN LNL.
In House RF Power Option John Reid December 14, 2011.
X-band Mobile Radar Data Update
Why Virtualization (Still) Matters
Electrical and electronic systems projects
RF Status 1 4 High Power Amplifier circuits available CERN(2)
The Big 6 Research Model Step 3: Location and Access
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Series 5300 Lithium Cell Formation System
Detecting phase Alexandra Andersson Jonathan Sladen
Installing A Graphics Card
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Solid State Driver Upgrade Update 1kW Solid State Amplifiers – 32 have been tested and calibrated. – 50 have been built so far. Small heat sinks for the remainder have arrived. Large heat sinks should be in later this week. – Takes about 1 day/amplifier to test and calibrate All 84 amplifiers should be checked out by the end of April.

Solid State Driver Upgrade Update Relay Racks – 5 have been built so far The PO for the remainder of what’s needed should have been ordered. – Grid Bias Supplies All 20 have been built and tested. – Issues with Station 1 installation Found an unsoldered connector on the Fanout Cable going to the SSD Relay Rack. Still issues with phasing the station in, still unclear why there’s such a big difference between 1 and 5 station-station phase compared to station 2 and 6. Weeklong shutdown should allow us to correct this.

Frequency Response of Typical Amplifier

Measurement of 1dB compression point