Date Event Global Design Effort 1 Cryomodule Technical System Review N. Ohuchi, H. Carter, C.Pagani.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
Project Management Workshop. Nick Cook  Citigroup Corporate and Investment Bank  European Technology Business Office Manager Edinburgh University April.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
CHAPTER 5 SUPPLY.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
D.Proch, Thin film Workshop, Legnaro, Oct SC RF cavity technology: the possibility of mass scale production, a global review Remarkable production.
RF Cavity / Coupling Coil Module
US Cavities Status and Plan Mark Champion 01 October 2009.
Industrial Studies of ILC Cavities & Component Production in the Americas IPAC 11 – Kyoto, Japan May 23, 2010 Science Projects Homeland Security Medical.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
High Level RF Technical System Review GDE Cost Review July Vancouver Canada Shigeki Fukuda & Ray Larsen For the HLRF Cost Team C. Adolphsen,
Global Design Effort U.S. ILC Cost Translation R. Stanek, et al. Vic Kuchler 1/26/07.
Report from GG5, Dec. 20, 2005 Report from ILC GG 5: Cost and Engineering (Updates since Snowmass) Wilhelm Bialowons, Peter Garbincius and Tetsuo Shidara.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
Economics Chapter 5: Supply Economics Chapter 5: Supply Supply is the amount of a product that would be offered for sale at all possible prices in the.
Present status of TTF-cryomodules short overview Bernd Petersen DESY MKS March, 7, 2005 Main design features of TESLA-cryomodules Design changes for XFEL-cryomodule.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Chapter 14 Global Production, Outsourcing and Logistics 1.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
VLCW July Global Design Effort1 Installation Global System Review F. Asiri W. Bialowons, T. Shidara Acknowledgment: C. Hauviller, R. Sugahara C.
19 July 2006 Vancouver Global Design Effort 1 Cryogenic Systems Review Tom Peterson for the cryogenics global group.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
Assembly Organisation and Duration. Work Site Organisation STORAGE SMA18 UNLOADING CLEAN ROOM CERN-SITE CLEANING MANUFACTURE DIRTY TRIAL ASSEMBLY ISO7.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
1 ILC Internal Cost Review Major Points from External Reviewers T. Elioff, J. Marx, V. Soergel, M. Yoshioka, and A. Yamamoto, (C. Wyss, absent) To be presented.
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
Jim Kerby 23 May 2010 SCRF Cavity Technology and Industrialization SCRF Cavity Technology and Industrialization Workshop / Kyoto.
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
Proton Driver Resources & Schedule (R&D Plan) Rich Stanek May 10, 2005.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
Tests on production cryomodules Bob Kephart Sept 30, 2006.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
The Evolving ILC Project
Meeting for S1-Global module design Cryomodule and Cryogenics
Uppsala Commitment to ESS and FREIA Planning
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
WG-1 Session Cavity Performance Cryomodule Performance
(Additional materials)
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Presentation transcript:

Date Event Global Design Effort 1 Cryomodule Technical System Review N. Ohuchi, H. Carter, C.Pagani

Date Event Global Design Effort 2 Outline: Cryomodule Cost Estimate KEK cryomodule cost estimate U.S. region cost estimate European region cost estimate---even though we don’t have anything specific

Date Event Global Design Effort 3 Status: Engineering & Cost Estimate KEK cryomodule cost estimation model (1) –The cost estimation by KEK covers Cold mass components (material and machine processing cost) in the one cryomodule –Vacuum vessel and vacuum bellows –Gas Return Pipe (GRP) and support system of cavity helium vessel –Pipes and bellows for supplying liquid helium, and cooling pipes for thermal shields. –Thermal radiation shields –Support posts and connection parts between posts and vacuum vessel Assembly cost of the cold mass and cavities into one cryomodule Mass production effect on the cryomodule cost by the learning curve Cryomodule tests during the period of mass production (5 years)

Date Event Global Design Effort 4 Status: Engineering & Cost Estimate KEK cryomodule cost estimation model (2) –Conditions of the cryomodule cost estimation For the mass production, we assume the 700 cryomodules, not 2100 cryomodules. Following the production profile by the US group (700 model), the maximum construction rate is 200 cryomodules per a year. We are dealing with the non-quadrupole cryomodule for the cost estimation. The studied cryomodule is basically the Type III. No complete design of Type IV cryomodule for ILC. –We consider that the cryomodule components of Type IV are close to those of the Type III cryomodule for the cost estimation. In the cost estimation of the cryomodule test, the water and electrical power are not included.

Date Event Global Design Effort 5 Description of Cost Methodology Strategy of the cryomodule cost estimation by KEK –Making the cost table of the cold mass components of one unit cryomodule with two Japanese companies Hitachi –Making the cost table (material and manhours of the component processes) of the cold mass components of the STF-Phase-1 cryomodule. –Design of the STF-Phase-1 cryomodule is based on the TTF Type III cryomodule. The cryomodule cross section is very close to the TTF Type III cryomodule. –Estimating the cost of the ILC cryomodule based on the STF-phase-1 cryomodule cost. Toshiba –Making the cost table of the TTF Type III cryomodule (under construction). –Assembly cost Studying the assembly processes and man powers from DESY #6 cryomodule assembly. Making the table of the processes and man powers for the STF cryomodule by Hitachi and the TTF type III cryomodule by Toshiba.

Date Event Global Design Effort 6 Description of Cost Methodology –The profile of the material, component process and assembly costs for the ILC cryomodule by Hitachi 24% 58% 18% More than 75 % of the cryostating cost is the labour cost of machine- processing components and assembling the cold mass.

Date Event Global Design Effort 7 Description of Cost Methodology –Learning curves The unit cost decrease with a constant ratio every time when the total accumulated number of the manufactured items becomes double. Y=Y 1  P^(LogX/Log2) Y: Production manhour at the x-th cryomudule Y 1 : Production manhour at the 1-st cryomudule X: Accumulated total number of the cryomodule P: Learning ratio This learning curves are applied on the material and process costs for the components and the cryomodule assembly. –Risk factors The risk factors are not introduced for the cryomodule cost estimation. The value of the risk factor strongly depend on the perfection of the cavities. When making the parameter clear, we apply the value on the assembly cost of the cryomodule.

Date Event Global Design Effort 8 Description of Cost Methodology –Cryomodule test The tests of 200 cryomodules per a year following the production profile proposed by US Gp. –In the cost estimation by KEK, it is assumed that 20 cryomodules should be tested during the 5 weeks, and the tests are continued for 50 weeks per a year. –Required refrigerator: 1.6 kW at 4.4 K and 3 kW at 80 K. Cost profile of the cryomodule test 36% 21% 11% 10%

Date Event Global Design Effort 9 Next Steps (KEK) Next steps for the cost estimation –this workshop We have to confirm the studying items and the strategy of the cost estimation between three regions. –between this and the Valencia workshop Making the optimized mass production model of the 700 and 2100 cryomodules with estimating the actual works and positioning the components in the factories. The learning ratio should be studied more and be applied separately on each subject. Making the list items of the components and the process including facilities almost same level for the cost estimation between three regions. –It is OK that the cost values are secret, however the study items and components should be clear between three regions. The cost estimation of the cryomodule component is based on the STF cryomodule design. The cost model of the cryomodule and assembly process should be improved by being referred to the component design of the TESLA cryomodule. –For example, thermal radiation shielding plates, finger welding process. –Introducing auto-welding machine for assembly as much as possible.

Date Event Global Design Effort 10 Status of the US Cost Model Effort Cost estimate developed by a team led by Rich Stanek (FNAL) and Warren Funk (JLab) Estimate is inclusive of all aspects of cryomodule con- struction, using a combination of inputs from JLab (dressed cavities) and FNAL (string & cryomodule assembly) It is a work in progress that will get refined using feedback from the DCB/GDE at this meeting Prior to the Valencia meeting we plan to incorporate a true dynamic Simulation Model Have not attempted to fit this estimate into any “standard” DCB-generated WBS format yet (Excel based estimate at this time) Still need to generate the risk/probability distribution The current estimate assumes a 40% contingency added to the total cost

Date Event Global Design Effort 11 Work Breakdown Structure WBS has three Level 2 elements: –Project Management Overall PM Office => An estimate of the effort and cost associated with “running the cryomodule project” including incorporating sound project management techniques and preparing for reviews –Infrastructure Facilities required to produce/process/assemble/test/store components and finished assemblies (twelve facilities in total) –Cryomodules M&S and SWF (touch labor) costs are captured on a per unit basis and multiplied by the number of cryomodules required

Date Event Global Design Effort 12 Cost Model Assumptions Duration => Seven year project Takes 2-3 years to build up infrastructure Operate infrastructure (keep it functional) for the next 4-5 years –Time assumptions will get revisited and optimized when the Simulation Software is implemented One vendor Ramp Rates are not included yet –Working with average rates Learning Curves –Used in cavity part of model, not yet in cryomodule assembly Starting Point –At the start of the Project we know what we want to build (all R&D is complete) and how we want to build it Extra cryomodules –Included in the model to allow for a failure rate during final test

Date Event Global Design Effort 13 Inputs to Model Total Number & Type of cryomodules Total years available to fabricate cavities & cryomodules –assume it takes 2-3 yrs to put infrastructure in place –assume there is an offset between time for cavity fabrication and time to assemble cryomodules (currently 1 year but adjustable) Unit Prices & Labor Estimates for components This is where learning curves & quantity discounts would be applied # of shifts required per stage of cavity and cryomodule fabrication, processing, assembly and test Several different yield factors % of cavities that fail vertical qualification test % of failed cavities that require additional electro-polish % of cavity strings that need to be reworked % of cryomodules that fail final qualification test

Date Event Global Design Effort 14 Cost Model Integration (JLab & FNAL) Worksheets from Warren Funk (JLab – Dressed Cavities) were added to the FNAL base workbook to complete the Total Cryomodule Estimate Sheets/cells are referenced to one another as part of integration Parameter Page was developed to capture key inputs and assure that both parts of the model used the same numbers Tried to keep as much commonality as possible Differences in philosophy still exist but are being discussed to gain consensus (weekly meetings) Cavity string assembly was estimated by both Labs and proved to be beneficial in identifying all costs

Date Event Global Design Effort 15 Project Management M&S estimated as 1% of sum of Total Infrastructure + Total Cryomodule costs SWF estimated based on 10 person Project Management Team for full 7 year duration This is an area that will see more refinement as the model continues to be developed

Date Event Global Design Effort 16 Infrastructure Tried to identify and cost every facility required Quite probable that Some facilities would be established by the vendors Several of these facilities would be combined into one Facilities are referenced to a particular configuration (one facility unit produces x units in this amount of time) and then scaled for actual model inputs (that’s why some quantities are not integers) Each facility has three L4 elements Building (used base cost of $250/sf) Equipment (# and type of task specific equipment) EDIA construction, maintenance & oversight Labor estimates are to construct maintain and oversee operation of the facility, not touch labor on the cryomodules, except in case of storage/prep buildings (function is clearly defined) Cost of infrastructure is affected by inputs/assumptions to the model –# of cryomodules, years available for fabrication, shift operation…

Date Event Global Design Effort 17 Cryomodules Different types and quantities of cryomodules have been included –Four types (cells for final 3 types all referenced off first unit) Standard with quad Standard without quad Special (6 cavities / 6 quads) Special (8 cavities / 2 quads) All M&S and SWF costs on a per unit basis have been captured and then multiplied by the number of units Some costs are “common” and independent of exact number of units All the “touch labor” associated with a cryomodule as well as EDIA on a per unit basis has been captured –Coupled with using FTE Yr units => create very small numbers We used agreed upon # of shifts (from May DESY meeting) for assembly steps inside/outside clean room

Date Event Global Design Effort 18 Next Steps Continue to validate and refine the model –Check inputs and logic Does the output of the model make physical sense? –Can we really build infrastructure in 2-3 yrs? –Is the labor estimate correct? –Reexamine discounts & learning curves –Clean up the model to better match DCB needs Incorporate a dynamic simulation of the process –Create ramp ups and training curves Want to continue to quantify the effect of various input changes and assumptions on the final cost estimate Rent vs. Buy, raw material escalation, more or less cavity processing, cost versus fabrication time analysis, etc. Integrate input from US Industrial Studies Generate a solid Basis of Estimate Create a Dictionary to better define terms/acronyms

Date Event Global Design Effort 19 U.S. Cost Estimate Conclusion Have gotten a good start on a cost model for cavities and cryomodules –can vary key inputs and look at different scenarios Model is quite inclusive and may need to get “trimmed back” as things become clearer Integration of cavity (JLab) and cryomodule (FNAL) costs is going well (weekly meetings) –Need to communicate with SLAC on rf system model Although more work is needed, we’re optimistic that this model can play a role in helping to determine a U.S. cost estimate for the ILC

Date Event Global Design Effort 20 European Region Cost Estimate Cryomodule cost estimate based on original TESLA TDR numbers for the Type III+ design, and supplemented by the numbers for the XFEL

Date Event Global Design Effort 21 Possibilities for Cost Reductions Cryomodule component-level cost reduction strategies Incorporation of U.S. industrial cost study information may result in better cost numbers (hopefully lower) Cryomodule design-level cost reduction strategies At the SLAC LCFoA meeting it was suggested that early involvement of industry in the design phase of the program might result in cost savings through design for manufacturability. We need to explore this fully.

Date Event Global Design Effort 22 Towards the TDR Present cryomodule cost estimate based on the Type IV design Next generation CM design (Type V or ILC prototype) will incorporate design for manufacturability and cost reduction Efforts at industrialization must ramp up and involve more vendors in order to stimulate competition and perhaps lead to unit cost reductions