Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION BY: ROY HANNAFORD
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 7500 Amp HTS Lead SOLDER BOX MOUNTING PLATE 7500 AMP.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 7500 Amp HTS Lead ROUTING AND BEND RADIUS FOR CABLE.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 7500 Amp HTS Lead Layout with four cables in solder box.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 7500 Amp HTS Lead Assemble cables and solder in box.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 7500 Amp HTS Lead Place aluminum push block over the top piece of conductor.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 7500 Amp HTS Lead Install top plate to hold tension while soldering.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 7500 Amp HTS Lead Insert cartridge heater and heat joint to 240 C and tighten clamp bolts.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 7500 Amp HTS Lead Clean joint install voltage taps and insulate cables.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 600 /120 Amp Lead Remove Kapton insulation and prep joint for soldering.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 600 /120 Amp Lead Tin wire and insert into solder fixture.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 600 /120 Amp Lead Assemble wire and lead into solder fixture.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 600 /120 Amp Lead Install solder fixture top plate.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 600 /120 Amp Lead Insert cartridge heater and heat joint to 240 C, tighten screws on fixture.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 600 /120 Amp Lead Clean joint install voltage taps and insulate wire.