Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.

Slides:



Advertisements
Similar presentations
1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
Advertisements

June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
December 18, 2007 TPTF How ERCOT Websites and Applications Handle MIS Public, MIS Secure and MIS Certified Information Kate Horne.
QSE/RE Transmission Facilities Outage Coordination Workshop.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
Lead from the front Texas Nodal 1 Registration Deep Dive Overview / Kick Off Sept 25, 2008.
ROS Feb 2006 The Model Curtis Crews Network Model Engineering Supervisor
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
March 20, 2008 TPTF CIM Update Raj Chudgar Program Director for Market Redesign.
June 27, 2008 NDSWG ERCOT and TSP activities discussion for SEM Go-Live.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Lead from the front Texas Nodal 1 Registration and RARF Update to TPTF August 27, 2007.
1 Nodal Single Entry Model (SEM) Go-Live WMS Update May 18, 2009.
Lead from the front Texas Nodal 1 Registration Data Collection June Window May 22, 2009 Kick Off Meeting.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Network Model Management System (NMMS)
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call May 30, 2008.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call June 20, 2008.
1 Market Trials Outage Scheduling Weekly Update August 20, 2010.
9/12/2006 TPTF MIS / Training Status & Update Pat Harris A portal is a web site or service that offers a broad array of resources and services such as.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
ERCOT Guideline for Interim Updates to the Network Operations Model Excerpted from the “Modeling Expectations” whitepaper D.W. Rickerson.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Registration Data Update Aug 25, 2008.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Resource Registration Update Dana Showalter Patrick Coon May 5, 2008.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Lead from the front Texas Nodal 1 Current Telemetry Dashboards NDSWG March 24, 2009.
1Texas Nodal Update on Disclosure Issues, including NMMS/RARF Data Discussion ERCOT Staff October 27, 2009.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
October 2, 2008 TAC Texas Nodal Market Implementation: Program Update Ron Hinsley.
Lead from the front Texas Nodal 1 MP10 / MP11 Registration Data Update Oct 14, 2008 TPTF.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 26, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Registration meeting- RARF Question &Answer Matt Mereness August 9 th, 2007.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
Nodal Planning Go Live Austin, TX February 3, 2011
Presentation transcript:

Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT

Texas Nodal 2 Posting of Network Operations Model Definition of Network Operations Model Content of NMMS Network Operations Model Protocol requirements for model-related postings Market Feedback summary Appendix

Texas Nodal 3 Definition of Network Operations Model Definition - Section 2.1 of the Nodal Protocols Network Operations Model A representation of the ERCOT System providing the complete physical network definition, characteristics, ratings, and operational limits of all elements of the ERCOT Transmission Grid and other information from TSPs, Resource Entities, and QSEs

Texas Nodal 4 Content of NMMS Network Operations Model The Network Operations Model contains the system network topology plus Resource data Resource data is submitted to ERCOT via the Resource Asset Registration Form (RARF) All Resource Entities submitted nodal RARFs (replacement of zonal GARF) RARF captures detailed operational characteristics of Resources Almost all RARF data is consumed by the Network Model Management System (NMMS) RARF template posted on Nodal Readiness center:

Texas Nodal 5 Content of NMMS Network Operations Model The Network Operations Model is posted to MIS Secure from NMMS per nodal protocols MIS Secure- represents the file being posted behind a digital certificate, and available to all registered ERCOT Market Participants (TSP, QSE, RE, etc) Model posting contains Resource data such as: –Resource Operational Minimum and Maximum output limits –Seasonal and Emergency Min/Max Output limits –Reactive Curves, Ramp Rate Curves –Minimum On-line and Off-line time, Max number of starts/week –Private Use Network Load Profile –Transmission equipment for resource –Appendix includes more detail Model posting does not include any financial data –Heat Rate curves –Verifiable costs –Start-up costs –Offers/bids from any market

Texas Nodal 6 Protocol requirements for model-related postings Nodal Protocol references: Section (3), Time Line for Network Operations Model Change Requests [footnotes to table] 2. Network Operations Model data changes and preliminary fidelity test complete by using the Network Operations Model test facility described in paragraph (3) of Section , ERCOT Responsibilities. The test version of the Network Operations Model will be available for market review and further testing by Market Participants. Section 3.10, Network Operations Modeling and Telemetry (8) ERCOT shall track each request received from TSPs and Resources via the NOMCR process, through implementation and final testing of the change. ERCOT shall notify each NOMCR requestor when the requested change is processed and implemented in accordance with Section , Time Line for Network Operations Model Change Requests, and ERCOT shall also provide the submitting TSP a link to a network model containing the change for verifying the implementation of the NOMCR and associated one-line displays. ERCOT shall post all NOMCRs on the MIS Secure Area within five Business Days following receipt of the NOMCR, consistent with Critical Energy Infrastructure Information (CEII) standards. Section 4.2.3, Posting Forecasted ERCOT System Conditions No later than 0600 in the Day-Ahead, ERCOT shall post on the MIS Secure Area, and make available for download, the following information for the Operating Day: (a) The Network Operations Model topology that includes known transmission line and other Transmission Facilities outages in the Common Information Model (CIM) format for the minimum Load hour and the peak Load hour;

Texas Nodal 7 Posting of Network Operations Model Nodal Protocol references (cont’d) Section , ERCOT Responsibilities (4) …. ERCOT shall acquire model comparison software that will show all differences between the next production model and production environment model and shall post this information on the MIS Secure Area within one week following test completion. This comparison shall indicate differences in device parameters, missing or new devices, and status changes. (8) ERCOT shall make available to TSPs and other Market Participants, consistent with applicable policies regarding release of CEII, the full transmission model used to manage the reliability of the transmission system as well as proposed models to be implemented at a future date. ERCOT shall provide model information through the use of the EPRI and NERC-sponsored CIM and web-based XML communications. Section Modeling of Transmission Elements and Parameters (2) … ERCOT shall provide all names and parameters of all Transmission Elements to Market Participants posted on MIS Secure Area by 0600 each day. Section , Transmission and Generation Resource Step-Up Transformers (5) ERCOT shall post to the MIS Secure Area information regarding all transformers represented in the Network Operations Model. Protocol reference related to confidentiality Section , Items Considered Protected Information “Protected Information” is information containing or revealing any of the following: […] (k) Resource-specific costs, design and engineering data

Texas Nodal Market Feedback Summary Comments from Market were mixed on the consideration of RARF elements to be disclosed. –No comments on certain RARF data being public and certain being private Calpine, NRG, PSEG – –RARF data should be protected prior to and after Nodal Market Go-Live, limited to only ERCOT and TSPs Luminant and REP Nodal group- –include RARF for transparency for an effective market TIEC and Dow –all RARF related to Load/PUN should be protected Oncor –Transmission data in RARF needs to be in model for TSP view