LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 LLRF for the FLASH 9mA Program S. Simrock DESY, Hamburg, Germany.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
J. Branlard ALCPG11 – March 2011 – Eugene OR, USA Results from 9mA studies on achieving flat gradients with beam loading P K |Q L studies at FLASH.
Lorentz force detuning measurements on the CEA cavity
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Review of LLRF system based on ATCA standard, Dec 3-4, 2007 Piezodriver and piezo control.
1 9 mA study at FLASH on Sep., 2012 Shin MICHIZONO (KEK) LCWS12(Sep.24) Shin MICHIZONO Outline I.Achievement before Sep.2012 II.Study items for ILC III.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech CICHALEWSKI, DMCS-TUL ATCA Review, Monday, Dec , High Level Applications.
LLRF System for Pulsed Linacs (modeling, simulation, design and implementation) Hooman Hassanzadegan ESS, Beam Instrumentation Group 1.
ORNL/SNS Spallation Neutron Source Low-Level RF Control System Kay-Uwe Kasemir, Mark Champion April 2005 EPICS Meeting 2005, SLAC.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Stefan Simrock, DESY LLRF-ATCA Review, Dec. 3, 2007 Requirements for the ATCA based LLRF.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Tomasz Czarski, Maciej Linczuk, Institute of Electronic Systems, WUT, Warsaw LLRF ATCA.
Jan 30, 2008MAC meeting1 Linac4 Low Level RF P. Baudrenghien with help from J. Molendijk CERN AB-RF.
RF Cavity Simulation for SPL Simulink Model for HP-SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgement: CEA team, in particular O. Piquet.
LLRF Cavity Simulation for SPL
Grzegorz Jablonski, Technical University of Lodz, Department of Microelectronics and Computer Science XFEL-LLRF-ATCA Meeting, 3-4 December 2007 XFEL The.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
1 FNAL SCRF meeting 31/10/2015 Comments from LLRF Shin Michizono (KEK) Brian Chase (FNAL) Stefan Simrock (DESY) LLRF performance under large dead time.
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
1 SPL Collaboration Meeting dec 08 - WG1 Introduction First SPL Collaboration Meeting Working Group 1 High Power RF Distribution System Introduction.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
Wojciech CICHALEWSKI, DMCS_TUL, Seminarium KMiTI LLRF in FEL System sterowania parametrami fali stojącej z zakresu częstotliwości mikrofalowych.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Review of LLRF system based on ATCA standard, Dec 3-4, 2007 Piezodriver and Piezo Control.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Review of LLRF system based on ATCA standard, Dec 3-4, 2007 Piezodriver and piezo control.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Review of LLRF system based on ATCA standard, Dec 3-4, 2007 Piezodriver and Piezo Control.
Preparation for Sept 9mA studies: Follow-up items from February J. Carwardine, 22 May 2012.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
John Carwardine 29 October, mA meeting 1. Agenda 9mA workshop Data analysis DAQ refresher / online database 2.
John Carwardine 13 th April, 2011 Report on the 9mA program.
FLASH 9 mA Workshop, 2009/01/16Lars Fröhlich (MPY), Martin Staack (MCS4) Machine Protection: Status + Outlook Status of the fast protection system Beam.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
BCC-35 A.K. Bhattacharyya, A. Butterworth, F. Dubouchet, J. Molendijk, T. Mastoridis, J. Noirjean(reporter), S. Rey, D. Stellfeld, D. Valuch, P.Baudrenghien.
John Carwardine January 16, 2009 Some results and data from January studies.
1 LLRF requirements/issues for DRFS Shin MICHIZONO (KEK) BAW1 (Sep.8, 2010)
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Project X ICD-2 Low Level RF Brian Chase Project X Collaboration Meeting September 11-12, 2009.
BE-RF-FB THE LINAC4 LOW LEVEL RF 02/11/2015 LLRF15, THE LINAC4 LOW LEVEL RF2 P. Baudrenghien, J. Galindo, G. Hagmann, J. Noirjean, D. Stellfeld, D.Valuch.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Director’s Review of the Project X Cost Range Estimate: Low Level RF Brian Chase Project X Director’s Review March 16, 2009.
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
John Carwardine TDR Writing: FLASH 9mA Experiment.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
2 Introduction ● Goals/deliverables: – Developed applications that will support LLRF controller work, operation and commissioning efforts as well as other.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
ESS LLRF and Beam Interaction
MicroTCA Development and Status
Overview and System Design for ESS LLRF Systems
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
ILC LLRF Status Ruben Carcagno, Brian Chase
LLRF systems status update
Injectors BLM system: PS Ring installation at EYETS
Planning the Experiment
Outlook of future studies to reach maximum gradient and current
WP02 PRR: Master Oscillator and RF Reference Distribution
LLRF Functionality Stefan Simrock How to edit the title slide
Beam dynamics requirements after LS2
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Presentation transcript:

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 LLRF for the FLASH 9mA Program S. Simrock DESY, Hamburg, Germany

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Scope of work and anticipated degree of difficulty for LLRF M.Grecki

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Operating parameters Bunch Charge: 3 nC Bunch repetition time: 3 MHz Number of bunches: 2400 Beam energy > 700MeV RF pulse length (flattop): 800 μs

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Problems to get these conditions Pushing machine up to the limits requires exception detection that does not exist and cannot be implemented in current DSP based LLRF controller –No real time quench detection for individual cavities –No klystron linearization –No real time beam loading compensation from toroid measurement

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Beam losses Field instability lead to beam losses that triggers BIS and disables RF operation

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Cavity quench High gradient may cause cavity quenches

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Klystron Difficulties: Kly. 4 high voltage tripped -> 6:30 h - 7:08 h -> 0.5 h down

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 What must be done? (1)‏ Installation of SmconDSP based LLRF system in ACC456 as parallel system Cabling (splitting signals) – partially done already, but some signals were never used by LLRF (e.g. BLM)‏ Crate with 9xSimconDSP – can we put 9 SimconDSP in a single crate? Downconverters – will we have new downconverters ready for this test? Communication between 9 SimconDSP boards – it was never tested before Piezo control – partially done already

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 What must be done? (2)‏ Software –SimconDSP firmware – was tested in FLASH, but not with all required features Beam loading compensation not tested with such high beam loading Loaded Q and detuning measurements Quench detection –DOOCS server for this system is needed (what, if the system will not fit in single crate?)‏ –Matlab scripts for HL algorithms (VS calibration, AFF, klistron linearization, etc.)‏ –Exception handling (quench detection, klystron trips)‏

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Expected problems MPS interlocks and recovery procedure Cavity quenching during long pulses with high gradient Klystron saturation Klystron HV stability during long pulses with heavy beam loading Lorentz force detuning of the cavities during long pulses with high gradient (poor flatness of the field leading to beam losses)‏ High rate of klystron trips – recovery automation

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Present LLRF system in ACC456 Proposal for SIMCON-DSP in ACC456 Installation of SIMCON DSP Procedure for trip recovery Prerequisites

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Presently installed DSP System

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Limitations of DSP System DSP real time computational capacity exhausted –No real time quench detection for individual cavities –No klystron linearization –No real time beam loading compensation from toroid measurement Number of real time channels limited to 32 –No real time action on forward and reflected power –Forward and reflected power separately measured by ADC Limited to 1 MHz sampling rate –No averaging for noise reduction Application must be implemented in DOOCS servers –Only pulse to pulse actions possible, 5 Hz difficult

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Operational limitations Downtime Beam loss Cavity Quench Klystron trip Coupler trip Vacuum trip Machine protection Field regulation Klystron saturation VS calibration Beam current fluctuations Cavity tuning Procedure Errors Loop phase/gain set VS calibration (rot. matr.) Resonance control Beam loading compensation Feedforward table set Error limits table (VS except.)

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Main Problem BEAM LOSS RF UNSTABLE

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Possible improvements with SIMCON-DSP Real time applications –Cavity quench detection and handling –Klystron linearization –Toroid based beam loading compensation –Piezo tuner control (! Pulse to pulse) –Adaptive feedforward (rf + energy) Other applications to assist operators –Loop phase and loop gain –Vector-sum calibration with heavy beam loading Requires corrected/calibrated V_inc, V_ref –Loaded Q and detuning measurement during pulse Improved field measurements –High IF and faster sampling rate (averaging !)

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Configuration of SIMCON-DSP in ACC1

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Procedures 1.Setup rf with long pulses 10% from gradient limit 2.Establish optics for few bunch operation, 3nC, 3MHz 3.Increase number of bunches 4.Adjust optics for minimum beam loss 5.Adjust feedforward in rf system based on energy measurement and beam loss profile 6.Adjust threshold for beam loss trip according to dose rate measurement 7.Repeat 3. through 6. until 2400 bunches 8.Increase gradient until trip occurs (  beam/rf inhibit) 9.Recover from trip 10.Repeat 8. and 9. until maximum gradient is reached 11.Operate for several hours

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Exisiting prerequisites 1.A sufficient number of SIMCON-DSP boards (9 boards are needed to control 24 cavities) are available. It was planned to use them with cavity simulators in the lab but installation at FLASH would allows software development with real signals. The development would take place open loop. Some time at FLASH needs to be negotiated to close the loop. 2.In ACC4,5,6 the connections for probe, forward and reflected power are already in preparation using power splitters for the ATCA evaluation. The directional couplers are already available and waiting for installation. Cabling has been partially installed. The space for the VME crate exists in one of the high power rf racks. 3.An LO generation box for the high IF scheme is prepared by Petr Morozov for ACC1 and can be duplicated for ACC4,5,6.

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Existing prerequisities 4.A SIMCON-DSP based hardware platform has been installed in ACC1 and is ready for software application development. The same framework can be used in ACC4,5,6. 5.Control of ACC4,5,6 has been already successfully demonstrated with 9 SIMCON-DSP boards. Three SIMCONs have been used for control, the others for detuning measurements and piezo control using forward and reflected power. 6.There is a strong synergy between software needed for the 9mA test and the LLRF development for the XFEL. Some priorities may have to be revised.

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Missing 1.Downconverters (10 boards) will be needed. The plan is to buy the ATCA compatible downconverters (mezzanine cards for RTM carrier module) from Cryoelectra (will be needed for the ATCA system). For the setup with SIMCON additional adaptors (available) will be needed. 2.The MCS group (Kay Rehlich) should assume responsibility for the DOOCS servers needed for this system. MSK has no dedicated personnel available for the DOOCS server development and maintenance. Most of the existing servers have been developed by students and future maintenance is unclear. 3.The installation work (planning, organisation, maintenance) for the LLRF system has been traditionally assigned to Thomas Froelich. Since his availability is very limited (due to increasing work with klystron) he will need some help.

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Missing 4. Need timing module from the MCS group. 5.Some cabling is needed a)Cabling from ACC4,5,6 to the BIS system is required. b)Cabling from SIMCON-DSP System to vector- modulator c)9 MHz FLASH timing signal (from MCS) d)Toroid signal for beam loading compensation e)Klystron forward power (for linearization) 6.LLRF team needs a few more people (see Project Progress Review June 2008). This includes the collaboration agreements. We are working on it.

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Rackspace and cabling

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 ACC23 andACC456 LLRF

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Splitting signals in ACC456

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Plans for Installation in ACC456 and Options for ACC23

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Plan for Hardware Installation ACC x SIMCON-DSP (inst. in parallel to existing DSP system for 24 x (probe, forw., refl. Power) Downconverters from Cryoelectra (mezzanine boards for RTM in ATCA installed with adapter board in VME ?) LO options – present 250 kHz scheme – high IF (54 MHz) scheme

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Update (1)

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Cryoelectra downconverter Very compact Rear Transition Module (RTM) : Receiver Type : LT5527 (Gilbert-Mixer) RF: 1300MHz, <10dBm LO: [1310MHz, 1350MHz], 10dBm IF : [10MHz, 60MHz], diff. outputs Frontend RF section RF inputs (8 channels): 1300MHz, +0dBm input power LO input: [1310MHz, 1350MHz] Evaluation Adapter Board Innerlayer LO Distribution section Amplifier IF section To ATCA interface Supply section [cm]

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Options for Hardware Installation ACC23 Option 1: Installation similar to ACC456 but only probes connected (requires space and cabling to be done) Option 2: Temporary installation of SIMCON-DSP system instead of DSP system using IF signals from present system Option 3: Use installed DSP system with some possible software improvements

LLRF at FLASH for 9mA Program, ILC08, Nov. 19, 2008 Algorithms (Software) Implement synchronous data acquisition for SIMCON and DSP and LLRF ADC systems Feedforward –Adaptive feedforward (3 methods) –Toroid based beam loading compensation –MIMO controller with adaptive FF Inform LLRF in advance about expected I_beam for next pulse Higher Feedback gain ( 20  100) –Requires thoughts on suppression of 8/9 pi-mode Robustness against parameter variations Increase speed of adaptive feedforward