G. Passaleva Status of MWPC production site in Florence G. Passaleva.

Slides:



Advertisements
Similar presentations
Fixes to TSI Auto System Language ID, please have all languages available in search and set up In set up please include tick box so you can attach.
Advertisements

Welcome to the Manage Orders lesson for the North Carolina Immunization Branch. Contents: Placing a State Supplied Order Accepting a State Supplied Order.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Status of the ATLAS MM project
Wimba Pronto Office Hours of the ND University System April 2009.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Algebra Foundations Box Factoring or acb Method x 2 - 4x + 4 x2x2 4.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
CCG Ordering Information 2014 For Questions, contact the Communications Analyst Alexandra Lazar
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Concur Travel and Expense Rollout
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Инвестиционный паспорт Муниципального образования «Целинский район»
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
Features Help (Adding Attachments) (Adding Auto Signatures) (Setting Priorities)
TRACI V3 Status & Delivery Plans UPDATE Paolo Petagna LHCb CO2 cooling meeting Apr 15 th, 2015.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
Adding Websites to the Internet Explorer trusted sites list in order to log-on to Cozzini websites without any security problems.
MM detector construction One or several modules per sector considerations.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CHAMBER PRODUCTION AT CERN 904 RPC UPGRADE-MEETING, 08.JAN.2014 DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY,
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
NCP-CERN Project status Waqar Ahmed. Items Production sites requirements Clean room Gas system Gas leak measurement station. Leakage current measurement.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
WEEK 1 You have 10 seconds to name…
Name _____________________________________________ Week of__________________ Find the matching stamp and stamp your letter in the box.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Games Week 4 Lydia Kang. I. Create Polynomial The students will form group of 3-4. Each group will receive one die and the worksheet. The student will.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
COPA Post-Rollover Setting the Year End Dates and Enrolling Your Children
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
July 19, 2012 Anna Peisert1 CERN/Taiwan/Helsinki production center Work share Institutes/people Status of preparations.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
The Ballot As a Learning Tool in Policy Debate Rich Edward & Russell Kirkscey.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Test Tube Activities at Ohio State (7/29/03) Amphenol/Spectra Strip will send two 10 m long samples of signal cable –With a (round) jacket, shielding –20.
This presentation demonstrates online order process on Biznet Tradelink.
ACC 423 Week 1 DQ 1 Why do companies offer stock options? What is the experience of either your organization or an organization that you are familiar with.
Field Experience in Family Social Sciences
Module Loading Task Force Meeting October 21, 2004
Configuring Cluster Communications
SCHEDULE Nov 1st - Assembly Table Complete
Overview of the Frascati Production Facilities
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
We provide an affordable option that is both safe and clean:
How to add a page… You will need to add new pages to your website depending on the brief. You do this by: Click on the Add new page button Write the new.
Around the room Orders of operations.
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
SHS Custom Print Process
Presentation transcript:

G. Passaleva Status of MWPC production site in Florence G. Passaleva

Tooling status

G. Passaleva Tooling status

G. Passaleva Clean room.

G. Passaleva Chamber shipping According to Danilo’s presentation at the LHCb week, ROME II is able to test 20 chambers/month matching the regime production yield of Ferrara+Florence One shipping/month from Fe + Fi is adequate –Shipping cost is € –Need 4 boxes of 1x1x2 m 3. Cost about 500 € each. Need stocking place in ROME II Chambers tested in ROME II can: –A) stay in ROME II –B) be shipped to Frascati In either cases need large stocking area waiting before final shipping to CERN. Another option is to send the chambers to CERN periodically  stocking place at CERN