CAD MODELS FOR MPGD CHAMBERS 24/06/20111II MPGD WORKSHOP Antonio Conde, PH-CMX.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
ICRA Panel System Installation Instructions
Supermicro © 2009Confidential MCP N installation guide Rech Weng.
Fixturing operations for PXL 1 models: MSC.SLDASM MSC_fixtured.SLDASM rail_test_system.SLDASM 2/24/2010.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
CM30 University of Oxford Engineering session Peter Ford Tim Hayler Eddie Holtom Roy Preece Jason Tarrant Steve Virostek.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
First Category Second Category Third Category Fourth Category $100$200$300$100 $200 $300.
General idea of a couple of check rod system and adjustments
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
TP4-ENERSOL-TD/PV double function
“Design of Water Supply and Sewer Systems” IV. Water Tank (Service Reservoir). Dimensioning and Constructing (Drawing 4) Main Procedures 1. Determination.
Area & Perimeter √ I CAN find area and perimeter of basic geometric figures.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
ATLAS Pixel Detector July 2003 SC Pixel Meeting N. Hartman LBNL 1 Pixel Support Tube WBS Santa Cruz Cost Workshop July 9, 2003.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
New hydraulic 24V swing-leaf gates operator S450H FAAC International Workshop 2009 Rimini, Italy September 2009 by SAT.
CAD PROBLEMS IE 433. Chapter 1  1-Exercise 1 Draw the sketch of the model shown in Figure A. The sketch to be drawn is shown in Figure B. Do not dimension.
KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 3May20121.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
DCal-ALICE integration and installation plan and status A. Tauro.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
Reading I: Enter the text here. Reading I: (cont. 1) Enter the text here.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
12.7 Similar. Today we will… Return to the idea Of similar objects.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
Annex 4 - Moving Frame and Whiffletree assembly
Servo-Finger Linkage as Parallelogram
Update of MVD services and requests
VELO-installation meeting CERN, January 17, 2006
Enter Title Here Created by.
INSTALLATION SEQUENCE
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
status of the second field cage
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Integration issues at IHEP
Overview on complete guided surgical protocol for partially edentulous cases with NobelReplace® Tapered and Replace Select™ Tapered.
Initial BIS installation
HCAL Modules -First Ideas
Challenges for FCC-ee MDI mechanical design
Mounting a BalanceBox®650 to a brick wall
TransCAD Route Systems 2018/11/22.
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
GLAST Large Area Telescope:
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
RPC SYSTEM LAYOUT and DIMENSIONS
Cryomodule Assembly Plan
Jeopardy - Factoring Review of Factoring.
With Animation Process 1 Process 4 Process 2 Process 5
(title of presentation)
With Animation 2. The Second Wave 1. The First Wave 3. The Third Wave.
After service guide for changing PCB
BRAN: LS2-plans TREX M. Palm, E. Bravin, BE-BI-PM.
Presentation transcript:

CAD MODELS FOR MPGD CHAMBERS 24/06/20111II MPGD WORKSHOP Antonio Conde, PH-CMX

1 DIMENSIONAL & GEOMETRICAL CHANGES 2 SINGLE CHAMBERS INSTALLED 3 DOUBLE CHAMBERS 4 INSTALATION PROCEDURE 5 PATCH PANEL SCKETCH POINTS 24/06/20112II MPGD WORKSHOP

1 DIMENSIONAL & GEOMETRICAL CHANGES 24/06/20113II MPGD WORKSHOP

24/06/20114II MPGD WORKSHOP THICKNES REDUCED 1 mm IN THESE TWO SPACERS

24/06/20115II MPGD WORKSHOP CHIMNEY WILL BE CONICAL IN STEAD OF PARALELL AS HERE THE HEIGHT WILL BE REDUCED 8 mm. (enough for services) 13mm. (15 before)

24/06/20116II MPGD WORKSHOP 24 CONNECTORS NOW (8 BEFORE)  NEEDS CONICAL CHIMNEY

24/06/20117II MPGD WORKSHOP OLD PARALELL CHIMNEY NEW CONICAL CHIMNEY (24 connectors)

24/06/20118II MPGD WORKSHOP GOOD GAP BETWEEN TWO CHIMNEYS (NO CLASHES)

2 SINGLE CHAMBERS INSTALLED 24/06/20119II MPGD WORKSHOP

24/06/201110II MPGD WORKSHOP RADIAL RAILS 9° ROTATED RAILS 9° SET OF CHAMBERS MOUNTED ON THE BACK FLANGE

24/06/201111II MPGD WORKSHOP INSERTION WINDOWS IN THE BRACKETS OF THE BACK FLANGE

3 DOUBLE CHAMBERS (S.C.) 24/06/201112II MPGD WORKSHOP

24/06/201113II MPGD WORKSHOP VERY COMPACT CHAMBERS NOW

24/06/201114II MPGD WORKSHOP -GAP BETWEEN CHAMBERS: 1mm - STACKED CHAMBERS TOTAL HEIGHT: 98mm

24/06/201115II MPGD WORKSHOP GAP BETWEEN BACK FLANGE & MUON CHAMBERS: 100mm

24/06/201116II MPGD WORKSHOP TWO TYPES OF PIVOTS & ANGLES BUT ONLY 1 ONE TYPE OF CHAMBER FOR ALL SC both SC match well (2 or 3 empty protos should be made then insered in all the positions, the next opening of the detector  put in the schedule??)

4 INSTALATION PROCEDURE (same for single chamber or SC) 4 INSTALATION PROCEDURE (same for single chamber or SC) 24/06/201117II MPGD WORKSHOP

4 INSTALATION PROCEDURE 4.a FIRST SC 4 INSTALATION PROCEDURE 4.a FIRST SC 24/06/201118II MPGD WORKSHOP

24/06/201119II MPGD WORKSHOP FIRST SC TO ENTER

24/06/201120II MPGD WORKSHOP FIRST SC ENTERING

24/06/201121II MPGD WORKSHOP FIRST SC ENTERED TO PIVOT STOP

24/06/201122II MPGD WORKSHOP FIRST SC ROTATED TO ITS FINAL POSITION

4 INSTALATION PROCEDURE 4.b SECOND SC 4 INSTALATION PROCEDURE 4.b SECOND SC 24/06/201123II MPGD WORKSHOP

24/06/201124II MPGD WORKSHOP SECOND SC TO ENTER

24/06/201125II MPGD WORKSHOP SECOND SC ENTERING

24/06/201126II MPGD WORKSHOP SECOND SC IN ITS FINAL POSITION

24/06/201127II MPGD WORKSHOP THE TWO TYPES OF SC MATCHING IN PLACE

4 INSTALATION PROCEDURE 4.c THIRD SC 4 INSTALATION PROCEDURE 4.c THIRD SC 24/06/201128II MPGD WORKSHOP

24/06/201129II MPGD WORKSHOP THIRD SC ENTERING

24/06/201130II MPGD WORKSHOP 4° NEEDS TO BE ROTATED 4° TO AVOID CLASH

24/06/201131II MPGD WORKSHOP WHEN ROTATED 4°, THE SC ENTERS WELL (same as RPC’s)

24/06/201132II MPGD WORKSHOP THIRD SC IN ITS FINAL POSITION

4 INSTALATION PROCEDURE 4.d FOURTH SC 4 INSTALATION PROCEDURE 4.d FOURTH SC 24/06/201133II MPGD WORKSHOP

24/06/201134II MPGD WORKSHOP FOURTH SC TO ENTER

24/06/201135II MPGD WORKSHOP FOURTH SC ENTERING

24/06/201136II MPGD WORKSHOP FOURTH SC IN ITS FINAL POSITION

5 PATCH PANEL SCKETCH 24/06/201137II MPGD WORKSHOP

24/06/201138II MPGD WORKSHOP PATCH PANELS (their surface cover the two openings of the chimneys for each SC)

24/06/201139II MPGD WORKSHOP 25 mm. length, SPACERS

ENTRETIENS AVEC JOSÉ SALICIO, CHEFS DE GROUPE, PERSONNEL DEPT. IT THANK YOU FOR YOUR ATTENTION !!REMARKS / QUESTIONS ? 24/06/201140II MPGD WORKSHOP Antonio Conde, PH-CMX