Risk Management Program
Program 2 requirements v Initial startup v Normal operations v Temporary operations v Emergency shutdown and operations 1a
Program 2 requirements v Normal shutdown v Startup following: Normal or emergency shutdownNormal or emergency shutdown Major change that requires a hazard reviewMajor change that requires a hazard review 1b
Program 2 requirements v Consequences of deviations v Equipment inspections 1c
Program 3 requirements - steps v Initial startup v Normal operations v Temporary operations v Emergency shutdown 2a
Program 3 requirements - steps v Emergency operations v Normal shutdown v Startup following: TurnaroundTurnaround Emergency shutdownEmergency shutdown 2b
Program 3 requirements v Operating limits Consequences of deviationConsequences of deviation Steps required to correct or avoid deviationSteps required to correct or avoid deviation 2c
Program 3 requirements - safety and health considerations v Properties of chemicals used in the process v Hazards presented by chemicals used in the process 2d
v Precautions to prevent exposure Engineering controlsEngineering controls Administrative controlsAdministrative controls PPEPPE 2e Program 3 requirements - safety and health considerations
v Control measures if exposure occurs v Quality control v Special or unique hazards 2f Program 3 requirements - safety and health considerations
Program 3 requirements - steps v Safety systems and their functions 2g