versus Proton spin vector Double-spin helicity asymmetry: N ++ / L ++  N +  / L +  N ++ / L ++ + N +  / L +  1 P1P2P1P2P1P2P1P2 A LL  Single-spin.

Slides:



Advertisements
Similar presentations
AGS Status and Plans RHIC Spin Collaboration Meeting 2/4/11.
Advertisements

E.C. Aschenauer 2013/03/132 polarisation for Blue and Yellow t o -calibration underway minimal impact on polarization, makes A N more stable  should.
E.C. Aschenauer arXiv: & E.C. Aschenauer EIC User Meeting Requirements from Physics:  High Luminosity ~ cm -2 s -1.
E.C. Aschenauer Phil Pile Meeting 2012/03/202 polarisation at injection Blue and Yellow Caveat: only first round of cleaning up noise in polarimeters.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
RHIC/AGS Polarimeter Study May 1, 2009 H. Huang, A. Zelesnki, B. Morozov.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
The polarized hydrogen jet target measurements at RHIC Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group: I. Alekseev, E.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
Beam-beam Observations in RHIC Y. Luo, W. Fischer Brookhaven National Laboratory, USA ICFA Mini-workshop on Beam-Beam Effects in Hadron Colliders, March.
Beijing, Feb 3 rd, % e+ Poalarization 1 Physics with an initial positron polarisation of ≈30% Sabine Riemann (DESY)
A study of systematic uncertainties of Compton e-detector at JLab, Hall C and its cross calibration against Moller polarimeter APS April Meeting 2014 Amrendra.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
E.C. AschenauerPSTP-2013, Charlotesville, VA1. The Pillars of the eRHIC Physics program E.C. AschenauerPSTP-2013, Charlotesville, VA 2 Wide physics program.
E.C. Aschenauer RSC-Meeting, January 21st T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e.
E.C. Aschenauer for the group arXiv: &
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Run 8 Polarization measurements from STAR BBC Andrew Gordon September 12, 2008.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
October 14, 2004 Single Spin Asymmetries 1 Single Spin Asymmetries for charged pions. Overview  One physics slide  What is measured, kinematic variables.
Relative Polarization Measurements of Proton Beams Using Thin Carbon Targets at RHIC Grant Webb Brookhaven National Laboratory Sept 14, 2015PSTP20151 for.
» Absolute Polarimetry of Proton Beams at RHIC« Oleg Eyser for the RHIC Polarimetry Group International Workshop on Polarized Sources, Targets and Polarimetry.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
APEX Report: February 26-27, 2008 Fulvia Pilat Time Meeting, March 4, 2008.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
Proton Polarimetry at RHIC K. Oleg Eyser for the CNI polarimeter group Newport News, VA, October 25, 2013.
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
A. Zelenski a, G. Atoian a *, A. Bogdanov b, D.Raparia a, M.Runtso b, D. Steski a, V. Zajic a a Brookhaven National Laboratory, Upton, NY, 11973, USA b.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Run6 CNI Analysis: Concluding Remarks and Summary of Systematic Uncertainties A.Bazilevsky For RHIC CNI group RHIC Spin Collaboration Meeting November.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
E.C. Aschenauer STAR Spin PWG 2012/03/222  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Update on the CNI polarimeter results for Run02 1.Bunch-by-bunch polarization study 2.Profiles of 0-pol bunches Osamu Jinnouchi.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
October 22, 2004 Single Spin Asymmetries at RHIC 1 F.Videbaek Physics Department, Brookhaven National.
RHIC Polarimetery A.Bazilevsky for RHIC Polarimetry group RHIC Spin Collaboration Metting April 10 (Friday), 2009.
Overview of the sea quark polarization measurements of PHENIX at RHIC DIS April 12, Rusty Towell Abilene Christian University on behalf of the PHENIX.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
APEX Studies: Accelerating w. Near 3 rd Order Resonance Vincent, Al, Michiko, Steve, Don, Yun, Guillaume, Mei, Todd, Wolfram, Greg, …
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
E.C. Aschenauer RSC - Meeting 2012/03/232  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
H-jet Run at Injection A. Dion, H. Huang, A. Poblaguev, A. Zelenski, and YM.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Kieran Boyle (Stony Brook University) for the PHENIX Collaboration
Yuxi Pan University of California, Los Angeles
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
ILC Baseline Design: Physics with Polarized Positrons
Run5 Analysis of RHIC-pC Polarimeter
p0 ALL analysis in PHENIX
Presentation transcript:

versus Proton spin vector Double-spin helicity asymmetry: N ++ / L ++  N +  / L +  N ++ / L ++ + N +  / L +  1 P1P2P1P2P1P2P1P2 A LL  Single-spin asymmmetry: N/L  N/LN/L  N/LN/L  N/LN/L  N/L 1 P1P1P1P1 AN AN AN AN  N  / L  + N  / L  versus E.C. Aschenauer 2013/03/19 2 If drops from 0.5 to 0.4 to compensate it with integrated lumi we need SSA: 1.5 x ∫Ldt DSA: 2.5 x ∫Ldt

E.C. Aschenauer 2013/03/19 3 =  corrected for R and  P =57.6 =  corrected for R and  P =57.6 =  corrected for R and  P =55.7 =  corrected for R and  P =55.7

polarisation for Blue and Yellow all calibrations applied  now can calibrate pC  one caveat correlation A N to Beam Polarisation, to Beam Polarisation, need to check more need to check more  pol. Background ?  pol. Background ? E.C. Aschenauer 2013/03/19 4

E.C. Aschenauer 2013/03/19 5 Yellow-2 Yellow-1 Blue-1

E.C. Aschenauer 2013/03/19 6 Ratio after scaling to H-Jet: not possible for Blue polarimeters as we have not enough B2 measurements

E.C. Aschenauer 2013/03/19 7 Note: ALL offline numbers have now normalisation to H-Jet !!! CDEV get reloaded and all past measurements are also corrected measured analyzing power for injection, 100GeV and 255 GeV in run 11/12 have not seen an energy dependence of pC/H-jet normalization  can use the same normalization factor for flat top and injection  so injection measurements will be pretty accurate  fills shown in all plots: > for B1 and Y GeV: B1: ± B2: ± Y1: ± Y2: ± :

E.C. Aschenauer 2013/03/19 8 Account for beam polarization decay through fill  P(t)=P 0 exp(-t/  p ) growth of beam polarization profile R through fill pCarbonpolarimeter x=x0x=x0x=x0x=x0 ColliderExperiments correlation of dP/dt to dR/dt for all 2012 fills at 250 GeV Polarization lifetime has consequences for physics analysis  different physics triggers mix over fill  different  different

E.C. Aschenauer 2013/03/19 9 at injection 2012: Y1: / at flat top 2012: Y1: /

E.C. Aschenauer 2013/03/19 10 at injection 2012: B1:0.041+/ at flat top 2012: B1:0.205+/-0.011

E.C. Aschenauer 2013/03/ : B1: / : Y1: /-0.056

E.C. Aschenauer 2013/03/19 12 See:

E.C. Aschenauer 2013/03/19 13 at flat top =  corrected for R and  P =46.73 =  corrected for R and  P =46.73 =  corrected for R and  P =52.34 =  corrected for R and  P =52.34

 Polarisation lifetime  yellow still worse than in 2012  blue looks the same or even sometimes better as 2012  Ramp efficiency  still varies sometimes loose all on the ramp to flat top  sometimes still loose through the rotator ramp different for blue and yellow  Polarisation profile  currently both in blue and yellow bigger as in 2012  targets:  will change targets both in blue and yellow  it seems to put targets further away from beam in park position and not having the 200MHz on during measurements helps Remaining Targets as of today: B1: 0 horizontal and 6 vertical B2: 6 horizontal and 0 vertical Y1: 4 horizontal and 6 vertical Y2: 2 horizontal and 2 vertical E.C. Aschenauer 2013/03/19 14