Advanced Performance Sports, Inc. Technology Development Report.

Slides:



Advertisements
Similar presentations
National Fighter Procurement Secretariat Secrétariat national dapprovisionnement en chasseurs Seven-Point Plan National Fighter Procurement Secretariat.
Advertisements

Hubbard County, Minn. Classification and Compensation Study Update GREG MANGOLD| AUGUST 5, 2014.
FarNorth Sports, Inc. Q4 Technology Report. New Technologies Update Ultra-lite Sports Apparel technology – Speedwear product for swimmers and cyclists.
Follow Up and Support AACN Clinical Nurse Leader Implementation Conference June 16 & 17, 2004.
Extreme Sports, Inc. Technology Report. Ultra-lite Sports Apparel technology – Speedwear product for swimmers and cyclists – Design reduces drag Generation.
OverviewOverview – Preparation – Day in the Life – Earnings – Employment – Career Path Forecast – ResourcesPreparationDay in the LifeEarningsEmploymentCareer.
Manager Self Service Update August 1, MSS Release Status.
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3-Develop Solutions Unit 4-Implement a Solution Unit 5-Test and Evaluate.
Lunar Lander Project Patrick Thurston and David Cobler.
Software Project Transition Planning
A DAPT IST Evaluation Plan Stuart Wheater Arjuna Technologies Ltd., UK.
Phase Difference = Phase Difference = 0.05.
Business Process of reengineering.. Definition of Reengineering The fundamental rethinking and radical redesign of core business processes to achieve.
SERM #50 PRODUCT DEVELOPMENT. PRODUCTS Tangible Good Baseball Intangible Service Watching a professional baseball game Consumer good Purchased and used.
Arithmetic Sequences & Series Last Updated: October 11, 2005.
 SAP AG 2007, Title / Dr. Stefan Scheidl / 1 WP6: Integrated prototype development WP1: Project management WP2: Requirements specification and analysis.
Physical Fitness. Major Components Flexibility Agility Aerobic Endurance Muscular Endurance Muscular Strength Muscular Power Anaerobic Power.
SBCTC Open Education Update 2015 Boyoung Chae, Ph.D. Policy Associate, eLearning and Open Education Washington State Board for Community and Technical.
Copyright © Open Applications Group, Inc. All rights reserved 1 © Copyright 2009 Open Applications Group Improving OAGIS with Ontology Technology.
Information Dissemination Strategy An Update Presenter: Bruce Locke.
CENTRAL SWIMMING NEW ZEALAND RDC REPORT JULY - SEPTEMBER.
For use only with Perreault and McCarthy texts. © The McGraw-Hill Companies, Inc., 1999 Irwin/McGraw-Hill Chapter 10: Product Management and New-Product.
What it takes to qualify for: Olympic swimming History 4 th hour By: Reid Byers Learn & teach 2/20/13 4 th hour.
Software Testing. What is Testing? The process consisting of all life cycle activities, both static and dynamic, concerned with planning, preparation.
ESPLOST Update Savannah-Chatham County Public Schools May 2, 2007.
Инвестиционный паспорт Муниципального образования «Целинский район»
Status Report # 4 LCDE Noe Flores, Marcos Lujan, Andrew Patton, Mark Steele September 17, 2012 The goal of our project is rectify problems with an existing.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
Innovative Career and Technical Education Curriculum Grant February 18, 2014.
Start Typical student project Advanced student project Level of final response.
Orientation and Summer Institutes Implementer’s Forum October 2005 Susan Barrett PBIS Maryland.
THE DESIGN PROCESS INFORMED DESIGN. SPECIFICATION: PERFORMANCE REQUIREMENT THAT THE DESIGN MUST MEET CONSTRAINT: LIMIT IMPOSED ON A DESIGN SOLUTION Finished.
1 Public Health Data Standards Consortium Communication and Outreach Committee Michelle Williamson Health Informatics Specialist Centers for Disease Control.
QRIS Validation Study Massachusetts Quality Rating and Improvement System Presentation to EEC Board March 11, 2014.
EE/CS 480 Spring February 2008 University of Portland School of Engineering Team Matthew Gridley Tim Morris Nathan Oliver Advisor Dr. Rylander Industry.
Project Plan and Schedule Goal: Agree on project plan and schedule.
Testing and Evaluating Software Solutions Introduction.
 What sport are they practising?  A) Cycling A) Cycling  B)Skateboarding B)Skateboarding  C)Kendo C)Kendo.
Composition of Congress. Learning Objectives To evaluate to what extent Congress can be described as representative?
OCM BOCES Science Center. NGSS Timeline: What we know today  The standards can be accessed at  Final Release.
1 Meeting the Future Together Update on The Garfield County “Socio-Economic” Impacts Study Energy Advisory Board April 7, 2005.
". " Sport in my life Sport in my life.
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Extreme Sports English Language & Literature English Conversation Final Presentation Group 3 Constance J. Sung Wingsuit Flying Ski Jumping.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
Fall CS-EE 480 Lillevik 480f06-l4 University of Portland School of Engineering Senior Design Lecture 4 Definition phase Design phase.
BILL SWEETENHAM, AM ASCTA CONFERENCE, MAY 2013 HIGH PERFORMANCE PREPARATION.
Extreme Adrenaline Rush
Dilbert Scott Adams.
Slideshow B3: Protective sports equipment
Advanced Performance Sports, Inc.
Cycling Culture in Spain
Requirement Change Control Procedure
The Problem Solving Method
طرق تدريس التربية الإسلامية 2
College of Alameda Integrated Planning and Budgeting Process
A) Define bradycardia. (1) b) Outline why the adaptations leading to bradycardia might be beneficial to trained athletes. (3)
Contents 1 Click to add Title 2 Click to add Title 3
Children’s Hospital Update
ABB Life Cycle Definition
First and Second Quarter
EDLC(Embedded system Development Life Cycle ).
Foothill College Governance Redesign Update
Foothill College Governance Redesign Update
MODULE :ADVANCE FASHION DESIGN TOPIC NO : 3 INTRODUCTION OF FASHION
Contents Click to add Title Click to add Title Click to add Title
Different kinds of sports
Presentation transcript:

Advanced Performance Sports, Inc. Technology Development Report

New Technologies Update Ultra-lite Sports Apparel technology – Racing apparel for swimmers and cyclists – Design reduces drag Generation XX Snowboard – Flexi-design snowboard – Technical composition (classified) Land Surfing – Equipment testing for Spring

Ultra-lite Sports Apparel Technology progress – Phase 1 testing completed (P1) Initial evaluations available for review – Phase 2 - endurance testing under way (P2)

Ultra-lite Status

Generation IV Snowboard Development progress – Final testing phase (P3) in progres Binding tests A-1 through A-4 completed Board tests A-1 and A-2 in progress Latch release redesign in progress – Product market review in progress 30 day reports due at end of month – Development review cycle in progress

Land Surfing Initial testing phase (P1) in progres Binding tests A-1 through A-4 completed Board tests A-1 and A-2 in progress Latch release redesign in progress Sail tests completed – Product market review in progress 30 day reports due at end of month – Development review cycle in progress

Questions Development Testing Marketing