Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens.

Slides:



Advertisements
Similar presentations
Brookhaven Science Associates U.S. Department of Energy Todd Satogata 1 Fri May RHIC FY03 Deuteron-Gold Performance n RHIC Deuteron-Gold Performance.
Advertisements

APEX Report April 28-29, 2009 May 4, 2009 Fulvia Pilat Time Meeting, May
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Linac4 Beam Commissioning Committee PSB Beam Optics and Painting Schemes 9 th December 2010 Beam Optics and Painting Schemes C. Bracco, C. Carli, B. Goddard,
Nov. 17, 2005Fermi Lab AP Seminar AC Dipole Based Diagnostics Mei Bai, C-A Department.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
AGS pp Status Feb. 20, 2015 RSC Meeting Haixin Huang.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Copyright, 1996 © Dale Carnegie & Associates, Inc. Intra-beam Scattering -- a RHIC Perspective J. Wei, W. Fischer Collider-Accelerator Department EIC Workshop,
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
AGS PP Progress Haixin Huang January, 3, Haixin Huang2 Daily Activities of Last Week 12/19 Difficulty to bring beam into Booster. Source only pulses.
AGS/Booster PP Setup Plan Jan. 11, 2013 RSC Meeting Haixin Huang.
AGS pp Status Mar. 17, 2015 Time Meeting Haixin Huang.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
RHIC Accelerator Capability: Present and Future Mei Bai Collider Accelerator Dept. BNL.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Polarized Proton Acceleration and Collisions Spin dynamics and Siberian Snakes Polarized proton acceleration.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
AGS pp Status Jan. 13, 2015 Time Meeting Haixin Huang.
Overview of RHIC Injector Oct. 5, 2015 Haixin Huang MEIC 2015.
Praha- Dubna SPIN2013 Helical magnets Siberian snakes I.Koop, A.Otboyev, P.Shatunov Yu.Shatunov Budker Institute for Nuclear Physics Novosibirsk.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Machine status – December 28  Machine status - overview  Blue ring: ramp development  Yellow ring: obstruction update  Set-up and ramp-up.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Spin Injection June 5, 2015 APEX Meeting H. Huang, P. Oddo, V. Ptitsyn.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
Beam-Beam and e-Cloud in RHIC Oct. 6, 2015 Haixin Huang, Xiaofeng Gu, Yun Luo.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RHIC Retreat 2006, July 10-12, N.Malitsky. Model update and progress Model Update and Progress L. Ahrens, K. Brown, A. Luccio, N. Malitsky, V.Ptitsyn,
Low Energy operation of RHIC AGS low energy extraction performance N. Tsoupas et. al. BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
APEX RUN-14 APEX Schedule April 1, :00am Store Elens commissioning Gu, Fischer, Luo, Simon 10:00am 4:30pm2:00pm AC dipole setup Bai Momentum Aperture.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
Beam intensity profile measurements with the RHIC (AGS) C-CNI polarimeters. Polarization profile measurements. Polarimeter target mechanisms upgrades.
Vladimir Litvinenko, APEX Workshop 11/02/20006 IBS suppression lattice Mei Bai, Joanne Beebe-Wang, Peter Cameron, Roger Connolly, Angelika Drees, Alexei.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
Accelerating Polarized Protons to High Energy Mei Bai Collider Accelerator Department Brookhaven National Laboratory.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
RHIC 250 GeV Polarized Proton Run 2009 Mei Bai RUN website: 12/16/2008RHIC Spin Collaboration Meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
RHIC Status and E-lens 101 Spin Collaboration Meeting V. Schoefer 2/6/2015.
Run 10 Start-up Status
Haixin Huang AGS Cold Snake: Status and Plans.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
ApEx needs for CeC PoP Experiment December 11, 2015.
AGS Polarized Proton Status January 25, 2011 Vincent Schoefer.
AGS FY11 Summary RHIC Spin Collaboration Meeting 5/6/11.
Injector Status Jan. 26, 2016 Time Meeting Haixin Huang.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Operation Notes APEX Status Fulvia Pilat Machine Experiments Meeting January 20, 2009.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
Beam Commissioning Adam Bartnik.
Space charge studies at the SPS
Large Booster and Collider Ring
Beam-beam Effects in Hadron Colliders
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Presentation transcript:

Developments and Beam Studies for the Injectors APEX Workshop 2Nov06 ahrens

Planned activities for 2007 Black: APEX workshop - last year’s text Red: new listing for 07 Categorize as: Set up, Commissioning, or Study Exclude explicitly polarized proton work – Haixin will cover in separate talk

Subject black: as written for ’06 red:new subject for ‘07 blue: additional comments motivationTypeleader / players Model development / testing Booster, AGS, transfer lines new: “online” model emphasis, goal: feed model parameters to other applications (IPM, Orbit control) Machine performance understanding. AGS “bare” machine is not well modeled: tune, chromaticity, coupling Study Com Brown, Malitsky/ Ahrens, Tsoupas, Booster injection transverse apertures not pushed High intensity protons – and general understanding; new loss detectors StudyBrown/ Ahrens, Booster injection: Au31+ or Au32+gold intensityStudy Com Setup Steski, Gardner, Zeno Booster D6 septum magnet influence on booster injection Coexistence with NSRLStudyTsoupas/ Zeno, BtA foils performance measurement (if/when have new foils available) They are available, this item is second on startup agenda Quality (longitudinal, intensity) of gold beam for RHIC injection Study Setup Marr/ Ahrens, Zeno, Thieberger BtA transverse matching ongoing: need to have BtA model solid AGS beam quality: intensity, hori – polarization Com Setup Tsoupas/ Glenn, AGS vertical tune quads – new configuration Polarized proton accelerationSetupOperations AGS bunch merge (gold) replaced debunch/rebunch Longitudinal emittanceSetuprf group

Subject (gold beam)motivationTypeleader / players AGS tune meter / coherence monitor basic tunes ok, want chromaticity from coherence length Beam behavior up the AGS rampComAhrens,Bai/ Laster AGS IPMnew electronics, new software: more corrections, accept model input Study Com Setup Brown/ Skelly, Inst group AGS equilibrium orbit control and display hardware: fix missing BPMs, software: thorough revisit control, capability to accept model input ComAhrens/ Laster, Inst group AGS (proton) transverse emittance: CNI scan proton emittance – one more viewComHuang/Yip, Nemesure AGS injection transverse apertures not pushed – this for the non- snake machine High intensity proton – and general understanding StudyGardner/ Ahrens,Lee Transverse emittance cooling during AGS acceleration with Gold running and IPM improvements, 1st task: reproduce past results Understand- possible applications here and elsewhere StudyBlaskowicz, Brown, Ahrens, Trbojevic

Subject (gold beam)motivationTypeleader / players AGS Response Matrix meas data taken semi automatically, not yet systematically analyzed understand AGS optics/systems Added complication: with one tune near an integer (pol prot) planes cross-talk strongly – coupling emphasized StudyBai,Harvey, Morris/Satogata, Niedziela, Schoefer AtR arc trajectory tuning with RHIC at Store Maintain high transfer beam quality: transverse, intensity ComGlenn,Drees/ AtR new stripping foil behavior Prep for a Gold runStudy Setup Tsoupas/ Ahrens AtR new W line flags (thick, uniform) Transverse emittance measurement Study Com Tsoupas/Glenn AtR longitudinal emittance match Pumping worked as expected, but the resulting beam was not what RHIC needed. RHIC proton beam qualityCom Setup Blaskowicz/ rf group