Highlights fro TR Collaboration meeting CERN 12/11/2012.

Slides:



Advertisements
Similar presentations
Cosmic Ray Test of GEM- MPI/TPC in Magnetic Field Hiroshima University Kuroiwa CDC Group Mar
Advertisements

24-Apr-15S.Movchan Straw prototype beam test into the NA48 infrastructure 1 Goals: test of straw prototype wires positioning straw bending check grounding.
LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
1 Calice Analysis 02/03/09 David Ward ECAL alignment update David Ward  A few thoughts about ECAL alignment  And related issue of the drift velocity.
1Domenico Di Filippo CHANTI Update and High rate effects Fabio Ambrosino, Tiziana Capussela, Michele Corvino (B.Sc.), Domenico Di Filippo, Paolo Massarotti,
M. Palm, CERN1 Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Tracking System at CERN 06 and 07 test beams Michele Faucci Giannelli.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
‘Dude where's my muon?’ Trigger Efficiency of the Single Station. Edward Overton 1.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
January 21, 2007Suvadeep Bose / IndiaCMS - Santiniketan 1 Response of CMS Hadron Calorimeter to Electron Beams Suvadeep Bose EHEP, TIFR, Mumbai Outline:
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Mariana Petris, NIPNE Bucharest CBM Meeting, March 9 -12, 2005 HIGH COUNTING RATE TRANSITION RADIATION DETECTOR Bucharest Prototype In Beam Tests.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
Studying the efficiency and the space resolution of resistive strips MicroMegas Marco Villa – CERN MAMMA meeting Tuesday, 13 th December 2011 CERN, Geneva.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
RPC Timing Results with Final Splitters Gianpaolo Carlino INFN Napoli The Napoli RPC Group: M.Alviggi, V. Canale, M. Caprio, G.C., R. de Asmundis, M. Della.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
Min-DHCAL: Measurements with Pions Benjamin Freund and José Repond Argonne National Laboratory CALICE Collaboration Meeting Max-Planck-Institute, Munich.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
How to get by without LIQUID ARGON Rajendran Raja & William Wester Fermilab, Apr,2012 Assume that Liquid Argon at 5 kiloton is a given. How do we expand.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
TEL62 AND TDCB UPDATE JACOPO PINZINO ROBERTO PIANDANI CERN ON BEHALF OF PISA GROUP 14/10/2015.
1 M2-M5 Efficiency and Timing checks on 7TeV beam data Alessia, Roberta R.Santacesaria, April 23 rd, Muon Operation
The NA62 Spectrometer Acquisition System TWEPP 2015, Lisbon Peter Lichard and Vito Palladino - CERN On Behalf of NA62 Straw Working Group.
Straw readout status Status and plans in Prague compared with situation now Choke and error Conclusions and plans.
ArgonneResult_ ppt1 Comparison of data and simulation of Argonne Beam Test July 10, 2004 Tsunefumi Mizuno
Plans for the 2015 Run Michal Koval, Peter Lichard and Vito Palladino TDAQ Working Group 25/3/2015.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
V.Duk, INFN Perugia1 CHOD TDAQ status and rates Viacheslav Duk, INFN Perugia On behalf of the CHOD working group.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
1 First look on the experimental threshold effects Straw WG meeting Dmitry Madigozhin, JINR.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
W-DHCAL Digitization T. Frisson, C. Grefe (CERN) CALICE Collaboration Meeting at Argonne.
THIS MORNING (Start an) informal discussion to -Clearly identify all open issues, categorize them and build an action plan -Possibly identify (new) contributing.
Replies to referees.
Straw readout status Run 2016 Cover FW SRB FW.
Michele Faucci Giannelli
The New CHOD detector for the NA62 experiment at CERN S
RPC – status / results Blanco On behalf of HADES RPC Group
EZDC spectra reconstruction and calibration
Modifications to the DRS4’s code
Jean-Sebastien Graulich, Geneva
Start Detector for pion experiments
Vito Palladino Straw Working Group 23/3/2015
Week coordinator report - C. Marchand
Spectrometer data quality studies
Cosmic Test Updates Vito Palladino 16/12/2013.
Tracking System at CERN 06 and 07 test beams
SAC/IRC data analysis Venelin Kozhuharov for the photon veto working group NA62 photon veto meeting
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
Run experience Cover FW SRB FW DAQ and monitoring
Francesco Gonnella NA62 Collaboration meeting Washington DC, U.S.A.
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
DESY drift chambers efficiency and track reconstruction
Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA M. Palm, CERN.
Testbeam analysis on module #1
week coordination report 15/06/2018
Presentation transcript:

Highlights fro TR Collaboration meeting CERN 12/11/2012

Experimental Setup = active regions View V View U Jura Saleve z y x -2 views -4 covers per view -2 SRB read via VME 12/11/122

Beam Profile The instrumented straws showed the radial beam profile Entries per Channel 12/11/123

Entries per Channel Beam Profile The straws instrumented have shown the radial beam profile SRB 3 SRB 2 12/11/124

Beam Profile The straws instrumented have shown the radial beam profile Entries per Channel SRB 3 SRB 2 Missing straws 12/11/125

Entries per Channel Beam Profile The straws instrumented have shown the radial beam profile Dead channel SRB 3 SRB 2 12/11/126

Burst Structure And burst time structure Events/333ms SOB EOB 12/11/127

Bad Words and Data Contamination Data suffers of contamination due to lost of part of data structure, some times this is recognizable and data can be used. But in a lot of cases this is not possible Spill Time Structure Events/333ms 12/11/128

Bad Words and Data Contamination Data suffers of contamination due to lost of part of data structure, some times this is recognizable and data can be used. But in a lot of cases this is not possible Beam Profile Structure Entries per Channel 12/11/129

Bad Words and Data Contamination With the threshold equalization we have seen a strange behavior, not present channels start to populate when at least one channel increase beyond 40Hz Entries per Channel * Spill width 12/11/1210

Bad Words and Data Contamination With the threshold equalization we have seen a strange behavior, not present channels start to populate when at leas one channel increase beyond 40Hz Entries per Channel * Spill width 12/11/1211

Bad Words and Data Contamination With the threshold equalization we have seen a strange behavior, not present channels start to populate when at leas one channel increase beyond 40Hz Entries per Channel * Spill width 12/11/1212

Data Selection Readout problems -> data selection ◦ Mismatch between the SRBs number of triggers ◦ “Bad Words” ◦ Thresholds ok from run 388, 1.25V before Analysis performed on run 368, taken in low intensity conditions (0.1 x10 11 prontons on T10) for CEDAR alignment Quality cuts applied to data contamination (<5 per mill) 12/11/1213

Run out of ~600 bursts match triggers quality cut (same number of triggers in the SRBs) 132 bursts out of 300 good for data analysis (contamination lower than 5 per mill ) 12/11/1214

Results Time (ns) The corrected CHOD time has been used to find the T0 for all channels. 12/11/1215

Results (drift time all ch) Drift time measurement has been performed using the T0 from CHOD Time (ns) 12/11/1216

Results (drift time ch 10) Time (ns) Drift time measurement has been performed using the T0 from CHOD 12/11/1217

Results (wire distance ch 10) Wire distance measurement has been performed using the drift velocity curve measured during the test beam Time (ns) 12/11/1218

Results (“assumed” drift velocity curve) Drift Time (ns) Wire Distance (mm) 12/11/1219

The End 12/11/1220

Run 368 Good Data 12/11/1221